CALIFORNIA PRELIMINARY NOTICE
IN ACCORDANCE WITH SECTIONS 8102, 8202, 9302, 9303 CALIFORNIA CIVIL CODE
THIS IS NOTA LIEN. This is not a reflection on the integrity of any contractor or subcontractor. Received
Job No.: 53-31237
CONSTRUCTION LENDER NAME AND ADDRESS OF CLAIMANT GIVING NOTICE:
(or Reputed Construction Lender, if any) Cole Equipment, Inc.
2830 Rubidoux Blvd.
Riverside CA 92509
OWNER
(or Reputed Owner(s) / Public Entity)
City of Menifee
29714 Haun Road
Menifee, CA 92586
DIRECT CONTRACTOR
(or Reputed Direct Contractor, if any)
Copp Contracting, Inc.
6751 Stanton Avenue
Buena Park, CA 90621
SUBCONTRACTOR/OTHER
(or Reputed Subcontractor / Other, if any)
All American Asphalt
P.O. Box 2229
Corona, CA 92878
An estimate of the total price of the labor,
services, equipment or materials provided
or to be provided is: $10,000.00
PROOF OF NOTICE DECLARATION
(California Civil Code Section 8118)
I, Candice Handley declare that I served
copies of this Preliminary Notice by:
CERTIFIED MAIL
postage prepaid, on the persons named, at the places
shown above on: May 24, 2019
Documentation of service by mail as required by
Civil Code Section 8118, is retained in our records.
If service is made by other methods, an alternate proof
of notice declaration has been utilized.
I declare under the penalty of perjury under the laws
of California that the foregoing is true and correct.
Executed on: May 24, 2019
at i4l, California
has furnished or will furnish labor, service, equipment
or material of the following general description:
Construction Equipment
Description of job site sufficient for identification:
Street Resurfacing and ADA Ramp Retrofit
Miralago/Lake Pointe Neighborhoods located South
Menifee, CA
The name of the person or firm who contracted for the
purchase of such labor, services, equipment or material
furnished is:
All American Asphalt
Trust funds to which Fringe Benefits are Payable
NOTICE TO PROPERTY OWNER
EVEN THOUGH YOU HAVE PAID YOUR CONTRACTOR IN FULL,
if the person or firm that has given you this notice is not
paid in full for labor, service, equipment or material
provided or to be provided to your construction project, a
lien may be placed on your property. Foreclosure of the lien
may lead to loss of all or part of your property. You may
wish to protect yourself against this by (1) requiring your
contractor to provide a signed release by the person or firm
that has given you this notice before making payment to
your contractor, or (2) any other method that is appropriate
under the circumstances.
This notice is required by law to be served by the
undersigned as a statement of your legal rights. This notice
is not intended to reflect upon the financial condition of the
contractor or the person employed by you on the
construction project
If you record a notice of cessation or completion of your
construction project, you must within 10 days after recording,
send a copy of the notice of completion to your contractor
and the person or firm that has given you this notice. The
notice must be sent by registered or certified mail. Failure
to send the notice will extend the deadline to record a claim
of lien. You are not required to send the notice if you are a
residential homeowner of a dwelling containing four or
fewer units.
(Signature of person making service)