Loading...
Valley Pipeline ServicesCALIFORNIA PRELIMINARY NOTICE IN ACCORDANCE WITH SECTIONS 8102, 8202, 9302, 9303 CALIFORNIA CIVIL CODE THIS IS NOT ALIEN. THIS IS NOT A REFLECTION ON THE INTEGRITY OF ANY CONTRACTOR OR SUBCONTRACTOR. CONSTRUCTION LENDER NAME AND ADDRESS OF CLAIMANT GIVING NOTICE (OR REPUTED CONSTRUCTION LENDER, IF ANY) ALCORN FENCE COMPANY AFC#R0442 NONE REPORTED OWNER (OR REPUTED OWNER) CITY OF MENIFEE 29714 HAUN ROAD MENIFEE, CA 92586 DIRECTOR CONTRACTOR (OR REPUTED CONTRACTOR, IF ANY) VALLEY PIPELINE SERVICES 47-110 WASHINGTON ST, SUITE 201 LA QUINTA, CA 92253 SUBCONTRACTOR (OR REPUTED SUBCONTRACTOR, IF ANY) ADDITIONAL REPRESENTATIVES NONE REPORTED AN ESTIMATE OF THE TOTAL PRICE OF THE LABOR, SERVICES, EQUIPMENT OR MATERIALS FURNISHED OR TO BE FURNISHED IS: $6,125.00 PROOF OF NOTICE DECLARATION: (CALIFORNIA CIVIL CODE SECTION 8118) I, DIANNE ORDONEZ DECLARE THAT I SERVED COPIES OF THIS PRELIMINARY NOTICE BY: CERTIFIED MAIL POSTAGE PREPAID, ON THE PERSONS NAMED, AT THE PLACES SHOWN ABOVE ON: January 5, 2018 DOCUMENTATION OF SERVICE BY MAIL AS REQUIRED CIVIL CODE 8118, IS RETAINED IN OUR RECORDS. IF SERVICE IS MADE BY OTHER METHODS, AN ALTERNATE PROOF OF NOTICE DECLARATION HAS BEEN UTILIZED. I DECLARE UNDER THE PENALTY OF PERJURY UNDER THE LAWS OF CALIFORNIA THAT THE FOREGOING IS TRUE AND CORRECT. EXECUTED ON: 01/05/18 AT SUN VALLEY, CALIFORNIA 9901 GLENOAKS BLVD SUN VALLEY, CA 91352 HAS FURNISHED OR WILL FURNISH LABOR, SERVICE, EQUIPMENT OR MATERIAL OF THE FOLLOWING GENERAL DESCRIPTION: METAL BEAN GUARD RAILING DESCRIPTION OF JOB SITE SUFFICIENT FOR IDENTIFICATION: NORTH CANYON ROAD DRAINAGE IMPROVEMENTS NORTH CANYON ROAD MENIFEE, CA 92586 THE NAME OF THE PERSON OR FIRM WHO CONTRACTED FOR THE PURCHASE OF SUCH LABOR, SERVICES, EQUIPMENT OR MATERIALS IS. - VALLEY PIPELINE SERVICES TRUST FUNDS TO WHICH FRINGE BENEFITS ARE PAYABLE NOTICE TO PROPERTY OWNER EVEN THOUGH YOU PAID YOUR CONTRACTOR IN FULL, IF THE PERSON OR FIRM THAT HAS GIVEN YOU THIS NOTICE HAS NOT BEEN PAID IN FULL FOR LABOR, SERVICE, EQUIPMENT OR MATERIAL PROVIDED OR TO BE PROVIDED TO YOUR CONSTRUCTION PROJECT, A LIEN MAY BE PLACED ON YOUR PROPERTY. FORECLOSURE OF THE LIEN MAY LEAD TO LOSS OF ALL OR PART OF YOUR PROPERTY. YOU MAY WISH TO PROTECT YOURSELF AGAINST THIS BY (1) REQUIRING YOUR CONTRACTOR TO PROVIDE A SIGNED RELEASE BY THE PERSON OR FIRM THAT HAS GIVEN YOU THIS NOTICE BEFORE MAKING PAYMENT TO YOUR CONTRACTOR, OR (2) ANY OTHER METHOD THAT IS APPROPRIATE UNDER THE CIRCUMSTANCES. THIS NOTICE IS REQUIRED BY LAW TO BE SERVED BY THE UNDERSIGNED AS A STATEMENT OF YOUR LEGAL RIGHTS. THIS NOTICE IS NOT INTENDED TO REFLECT UPON THE FINANCIAL CONDITION OF THE CONTRACTOR OR THE PERSON EMPLOYED BY YOU ON THE CONSTRUCTION PROJECT: IF YOU RECORD A NOTICE OF CESSATION OR COMPLETION OF YOUR CONSTRUCTION PROJECT, YOU MUST WITHIN 10 DAYS AFTER RECORDING SEND A COPY OF THE NOTICE OF COMPLETION TO YOUR CONTRACTOR AND THE PERSON OR FIRM THAT HAS GIVEN YOU THIS NOTICE. THE NOTICE MUST BE SENT BY REGISTERED OR CERTIFIED MAIL. FAILURE TO SEND THE NOTICE WILL EXTEND THE DEADLINE TO RECORD A CLAIM OF LIEN. YOU ARE NOT REQUIRED TO SEND THE NOTICE IF YOU ARE A RESIDENTIAL HOMEOWNER OF A DWELLING CONTAINING FOUR OR FEWER UNITS. SIGNATURE: Dianne Ordonez, A -AD IS ATOR