All American AsphaltCALIFORNIA PRELIMINARY NOTICE
In accordance with section 8102, 8202 and 9303, California Civil Code. THIS IS NOTA LIEN.
This is NOT a reflection on the integrity of any contractor or subcontractor.
CONSTRUCTION LENDER OR Name and address of claimant giving notice:
REPUTED CONSTRUCTION LENDER Cat Tracking Inc. Job# 18-079
one
OWNER OR
REPUTED OWNER(S)/PUBLIC ENTITY
City of Menifee
29714 Haun Road
Menifee, CA 92586
City of Menifee
City Clerk
JUL 13 2018
Received
DIRECT CONTRACTOR OR
REPUTED DIRECT CONTRACTOR
PO Box 2229
Corona, CA 92878-2229
OTHER
2950 Rubidoux Blvd Riverside, CA 92509
has furnished or will furnish labor, service, equipment or
material of the following general description:
Road Striping and Improvements
Description of job site sufficient for identification:
Rustler's Ranch Street Resurfacing Project, Phase I
CIP NO. 18-01
Menifee, CA
The name of the person or firm who contracted for the
purchase of such labor, services, equipment or material
furnished is:
All American Asphalt Subcontract# 30318-01
An estimate of the total price of the labor, services,
equipment or material provided or to be provided is:
$ 12,000.00
NOTICE TO PROPERTY OWNER
EVEN THOUGH YOU HAVE PAID YOUR CONTRACTOR IN FULL, if
the person or firm that has given you this notice is not paid in full
for labor, service, equipment, or material provided or to be provided
to your construction project, a lien may be placed on your property.
Foreclosure of the lien may lead to loss of all or part of your
property. You may wish to protect yourself against this by (1)
requiring your contractor to provide a signed release by the person
or firm that has given you this notice before making payment to
your contractor, or (2) any other method that is appropriate under
the circumstances.
This notice is required by law to be served by the
undersigned as a statement of your legal rights. This notice is not
intended to reflect upon the financial condition of the contractor or
the person employed by you on the construction project.
If you record a notice of cessation or completion of your
construction project, you must within 10 days after recording, send
a copy of the notice of completion to your contractor and the
person or firm that has given you this notice. The notice must be
sent by registered or certified mail. Failure to send the notice will
extend the deadline to record a claim of lien. You are not required to
send the notice if you are a residential homeowner of a dwelling
containing four or fewer units.
Date: 7/2/2018
Signature: 1
r
Shannon Lang
IF BY MAIL
Proof of Notice Declaration
(California Civil Code Section 8118)
declare:
That I served copies of this Preliminary Notice by registered or certified mail (or express mail), postage prepaid, on the persons
named, at the places and on the date(s) shown
below.
IF BY PERSONAL SERVICE
That I served copies of this Preliminary Notice on the persons named, at the places and on the dates) shown
below:
IF PURSUANT TO CCP § 415.20
That I served copies of this Preliminary Notice by leaving the Notice and mailing a copy of the Notice on the persons named, at the
places and on the date(s) shown
below:
Lender
(date)
Owner or
City of Menifee
(place of service)
Public
29714 Haun Road
7/2/2018
Body
Menifee, CA 92586
(date)
Riverside, California
(place of service)
Direct
All American Asphalt
Contractor
PO Box 2229
7/2/2018
Corona, CA 92878-2229
(date)
Riveside, California
Other
(place of service)
(date)
(place of service)
Documentation of service by mail (if served by mail), as required by Civil Code Section 8118, is attached
hereto.
I declare under penalty of perjury under the laws of the State of California that the foregoing is true and
correct.
Executed on 7/2/2018
(date)
at Riverside
r-.,]:r.._..:-