Chrisp Company - Menifee Rd at AldergateCALIFORNIA PRELIMINARY NOTICE
IN ACCORDANCE WITH SECTIONS 8102, 8202, 9302, 9303 CALIFORNIA CIVIL CODE
THIS IS NOTA LIEN. This is not a reflection on the integrity of any contractor or subcontractor
Job No.: 2s.5530
CONSTRUCTION LENDER NAME AND ADDRESS OF CLAIMANT GIVING NOTICE:
(or Reputed Construction Lender,, if any) Chrisp Company
43650 Osgood Rd
Fremont CA 94539
APR 30 2'CI5
OWNER i�C`
(or Reputed Owner(s) / Public Entity)
CITY OF MENIFEE
29714 HAUN RD
MENIFEE, CA 92586
DIRECT CONTRACTOR
(or Reputed Direct Contractor, if any) --
SMART TECH GROUP, INC
9372 BARRANCA PARKWAY
SUITE J283
IRVINE, CA92606
SUBCONTRACTOR/OTHER
(or Reputed Subcontractor / Other, if any)
An estimate of the total price of the labor,
services, equipment or materials provided
or to be provided is: $17,301.00
PROOF OF NOTICE DECLARATION
(California Civil Code Section 8118)
I, VANESSA BENAVIDES declare that 1 served
copies of this Preliminary Notice by:
CERTIFIED MAIL
postage prepaid, on the persons named, at the places
shown above on: April 27, 2015
Documentation of service by mail as required by
Civil Code Section 8118, is retained in our records.
If service is made by other methods, an alternate proof
of notice declaration has been utilized.
I declare under the penalty of perjury under the laws
of California that the foregoing is true and correct.
Executed on: April 27, 2015
at \ 1-�i`v Iryt ,California
has furnished or will furnish labor, service, equipment
or material of the following general description:
VARIOUS ROADWAY IMPROVEMENTS
Description of job site sufficient for identification:
MENIFEE ROAD AT ALDERGATE DR HOLLAN RD PO#4064
MENIFEE, CA
The name of the person or firm who contracted for the
purchase of such labor, services, equipment or material
furnished is:
SMART TECH GROUP. INC
Trust funds to which Fringe Benefits are Payable
DC 16 NoCA LABORERS
NOTICE TO PROPERTY OWNER
EVEN THOUGH YOU HAVE PAID YOUR CONTRACTOR IN FULL,
if the person or firm that has given you this notice is not
paid in full for labor, service, equipment or material
provided or to be provided to your construction project, a
lien may be placed on your property. Foreclosure of the lien
may lead to loss of all or part of your property. You may
wish to protect yourself against this by (1) requiring your
contractor to provide a signed release by the person or firm
that has given you this notice before making payment to
your contractor, or (2) any other method that is appropriate
under the circumstances.
This notice is required by law to be served by the
undersigned as a statement of your legal rights. This notice
is not intended to reflect upon the financial condition of the
contractor or the person employed by you on the
construction project
If you record a notice of cessation or completion of your
construction project, you must within 10 days after recording,
send a copy of the notice of completion to your contractor
and the person or firm that has given you this notice. The
notice must be sent by registered or certified mail. Failure
to send the notice will extend the deadline to record a claim
of lien. You are not required to send the notice if you are a
residential homeowner of a dwelling containing four or
fewer units. �.
(Signature of person making service)
Foam No. 100 P,elimsolulions.com