Becker Engineering - Antelope & Watson RoadsCALIFORNIA PRELIMINARY NOTICE
THIS IS NOT A LIEN
10740777
THIS NOTICE IS GIVEN PURSUANT TO SECTIONS 3097 AND 3098. CALIFORNIA CIVIL CODE.
THIS IS NOT A REFLECTION ON THE INTEGRITY OF ANY CONTRACTOR OR SUBCONTRACTOR.
You are hereby notified that the CLAIMANT named below has furnished or will
furnish labor, professional services, materials, machinery, fixtures or tools of
the following general description:
RENTAL EQUIPMENT
in the construction, alteration or repair of the building, structure or
The Name and Address of the Owner or improvement located at
Reputed Owner is: ANTELOPE RD & WATSON RD
CERTIFIED# 71966575029014015493 ANTELOPE RD & WATSON RD
CITY OF MENIFEE MENIFEE
29714 HAUN RD in the construction, alteration or repair of the building, structure or
MENIFEE, CA 92586 improvement located at RIVERSIDE COUNTY, CA, legally described as
follows:
ANTELOPE RD & WATSON RD
The Name and Address of the Original Contractor
is:
CERTIFIED# 71966575029014015509
BECKER ENGINEERING
P.O. BOX 890365
TEMECULA, CA 92589-0365
The Name and Address of the Reputed Lender
and/or Bonding Company is:
OWNER FINANCED
The Name and Address of the Person with whom
the Claimant has Contracted is:
BECKER ENGINEERING
P.O. BOX 890365
TEMECULA, CA 92589-0365
This Preliminary Notice has been completed by:
SUNSTATE EQUIPMENT CO LLC
5552 E WASHINGTON
PHOENIX, AZ 85034
An estimate of the total price of the labor, professional services, materials,
machinery, fixtures or tools furnished or to be furnished is:$1,570.87 .
@Pl�[y2111111 WLUtfjklIAN
If bills are not paid in full for the labor, services, equipment, or materials
furnished or to be furnished, a mechanic's lien leading to the loss,
through court foreclosure proceedings, of all or part of your property
being so improved may be placed against the property even though you
have paid your contractor in full. You may wish to protect yourself
against this consequence by (1) Requiring your contractor to furnish a
signed release by the person or firm giving you this notice before making
payment to your contractor or (2) Any other method or device that is
appropriate under the circumstances.Other than residential homeowners
of dwellings containing fewer than five units, private project owners
must notify the original contractor and any lien claimant who has
provided the owner with a preliminary 20-day lien notice in accordance
with Section 3097 of the Civil Code that a notice of completion or notice
of cessation has been recorded within 10 days of its recordation. Notice
shall be by registered mail, certified mail, or first-class mail, evidenced
by a certificate of mailing.Failure to notify will extend the deadlines to
record a lien.
Dare: Wednesday, June 27, 2012
By:
Prelien #: 944616
10740777
Bond Number:
Accurate Lien & Contractor Assistance, Inc., 6210 E. Thomas Rd. Suite 203 Scottsdale, AZ 85251-7056 (480) 941-0844
City of Menifee
Dear Owner/ Contractor/ Customer: J1111.. 0 2 2012
Received
Enclosed is a preliminary notice that we have sent to our customer,
the original contractor and the owner of the project to whom we
have recently provided labor, materials, and/ or rental equipment.
Accurate Construction Notice Service completes and mails this
documentation on our behalf. This notice, however, is NOT A
LIEN and is not recorded against your property.
This notice is not a reflection of the credit worthiness or financial
standing of our customer nor is it an indication of their ability or
desire to pay us. It is our policy to serve a preliminary notice for
projects where we have provided labor, materials, and/or rental
equipment so that you, the contractor or owner, are aware of
materials and/or equipment supplied to your job. By the time you
receive this notice there is a possibility that some or all of your
balance has been paid.
Should you have any questions or concerns, please contact us
directly.