Loading...
Becker Engineering - Antelope & Watson RoadsCALIFORNIA PRELIMINARY NOTICE THIS IS NOT A LIEN 10740777 THIS NOTICE IS GIVEN PURSUANT TO SECTIONS 3097 AND 3098. CALIFORNIA CIVIL CODE. THIS IS NOT A REFLECTION ON THE INTEGRITY OF ANY CONTRACTOR OR SUBCONTRACTOR. You are hereby notified that the CLAIMANT named below has furnished or will furnish labor, professional services, materials, machinery, fixtures or tools of the following general description: RENTAL EQUIPMENT in the construction, alteration or repair of the building, structure or The Name and Address of the Owner or improvement located at Reputed Owner is: ANTELOPE RD & WATSON RD CERTIFIED# 71966575029014015493 ANTELOPE RD & WATSON RD CITY OF MENIFEE MENIFEE 29714 HAUN RD in the construction, alteration or repair of the building, structure or MENIFEE, CA 92586 improvement located at RIVERSIDE COUNTY, CA, legally described as follows: ANTELOPE RD & WATSON RD The Name and Address of the Original Contractor is: CERTIFIED# 71966575029014015509 BECKER ENGINEERING P.O. BOX 890365 TEMECULA, CA 92589-0365 The Name and Address of the Reputed Lender and/or Bonding Company is: OWNER FINANCED The Name and Address of the Person with whom the Claimant has Contracted is: BECKER ENGINEERING P.O. BOX 890365 TEMECULA, CA 92589-0365 This Preliminary Notice has been completed by: SUNSTATE EQUIPMENT CO LLC 5552 E WASHINGTON PHOENIX, AZ 85034 An estimate of the total price of the labor, professional services, materials, machinery, fixtures or tools furnished or to be furnished is:$1,570.87 . @Pl�[y2111111 WLUtfjklIAN If bills are not paid in full for the labor, services, equipment, or materials furnished or to be furnished, a mechanic's lien leading to the loss, through court foreclosure proceedings, of all or part of your property being so improved may be placed against the property even though you have paid your contractor in full. You may wish to protect yourself against this consequence by (1) Requiring your contractor to furnish a signed release by the person or firm giving you this notice before making payment to your contractor or (2) Any other method or device that is appropriate under the circumstances.Other than residential homeowners of dwellings containing fewer than five units, private project owners must notify the original contractor and any lien claimant who has provided the owner with a preliminary 20-day lien notice in accordance with Section 3097 of the Civil Code that a notice of completion or notice of cessation has been recorded within 10 days of its recordation. Notice shall be by registered mail, certified mail, or first-class mail, evidenced by a certificate of mailing.Failure to notify will extend the deadlines to record a lien. Dare: Wednesday, June 27, 2012 By: Prelien #: 944616 10740777 Bond Number: Accurate Lien & Contractor Assistance, Inc., 6210 E. Thomas Rd. Suite 203 Scottsdale, AZ 85251-7056 (480) 941-0844 City of Menifee Dear Owner/ Contractor/ Customer: J1111.. 0 2 2012 Received Enclosed is a preliminary notice that we have sent to our customer, the original contractor and the owner of the project to whom we have recently provided labor, materials, and/ or rental equipment. Accurate Construction Notice Service completes and mails this documentation on our behalf. This notice, however, is NOT A LIEN and is not recorded against your property. This notice is not a reflection of the credit worthiness or financial standing of our customer nor is it an indication of their ability or desire to pay us. It is our policy to serve a preliminary notice for projects where we have provided labor, materials, and/or rental equipment so that you, the contractor or owner, are aware of materials and/or equipment supplied to your job. By the time you receive this notice there is a possibility that some or all of your balance has been paid. Should you have any questions or concerns, please contact us directly.