Station 76 Menifee Lakes September Staff Report
Month End Stat Report
Reporting Month: September Reporting Year: 2016
Reporting Station: Station 76
PR and Public Education Programs:
Total Number of
Events
for Reporting Month
Event Type Materials/Handouts
Used Total Number of Hours Number of Public
Contacts:
0 School Event Yes / No
1 Adult Education Yes / No 8 12
1 Fair/Safety Expo Yes / No 6 50+
1 Display Yes / No 2 20
2 Station Tour Yes / No 2 40
0 Fire Safety
Trailer Yes / No
4 Other Yes / No 12 14 Explorers
Field Inspections: LE-100’s (Weed Abatement)
Total Number of Initial Field
Inspections for Reporting
Month 0
Total Number of
LE-100 Inspections for
Reporting Month 0
Total Number of
Re-inspections for Reporting
Month 0
Prevention Referrals:
Total Number of Fire
Prevention Referrals for
Reporting Month 0
Significant Events:
Provide a brief synopsis of significant TC’s, Fires, Near Drowning’s, Road Closures etc
Include photos if available.
1 Motorcycle T/C Fatality, Fatility TC in Winchester, Structure fire in Winchester