PW reportPublic Safety Commission Meeting
Meeting Date: 10/10/17
Traffic Items (Since September 12, 2017):
1. OPERATIONS
a) Updated all clearance timing in the City to be CA MUTCD compliant
for pedestrian walk times and yellow times.
b) Several timing adjustments made at various intersections to
improve operations.
2. LANE STRIPING
a)
On -Call Contractor completed lane refresh striping on the following
streets:
1. Mapes Road -all
2. Watson Road -all
3. Antelope Road between Mapes Road to HWY 74
4. Palomar Road between Mapes Road to Mathews Road
5. Menifee Road between Mapes Road to Scott Road
6. Antelope Road between Newport Road to Scott Road
7. Haun Road between Newport Road to Scott Road
8. Murrieta Road to Scott Road to Holland Road
9. The remainder will consist of street legends and the addition of
Raised Pavement Markers (RPMs) to the streets n/o HWY 74 in the
Romoland area. All work to be completed by the end of this
month.
3. STREET SIGNAGE
a)
A total of 85 traffic street signs have been either changed out, repaired
or installed new.
4. SCHOOLS
a)
We have made some modifications on work orders for the striping
contractor to complete, this work will be completed within the next
couple of weeks.
b)
Provided recommendations on school circulation at Hans Christenson
Middle School
c)
Provided recommendations on school circulation at Boulder Ridge
Elementary
5. MISCELLANOUS
a)
Repaired 3 guardrail sections at:
1. Rouse/Bradley
2. Holland/Sherman
3. Tupelo/Sherman
b)
Installed Traffic Signal fiber optic line on Newport Road between Laguna
Vista Dr to Menifee Road.