Loading...
Station 68 Staff Report5 n� Reporting Month: February Reporting Station: Station 68 Month End Stat Report Reporting Year: 2017 PR and Public Education Programs: Total Number of Materials Mantlouls Number of Public Events Event Type Total Number of Hours er for Reporting Month used 1 School Event EI Yes / 0 No 6 300 Adult Education ❑ Yes / 0 No Fair/Safety Expo ❑ Yes / [I No Display_..... ❑ Yes / 0 No _.. 1 Station Tour ® Yes / 0 No 1 10 Fire Safety ❑ Yes / 0 No Trailer 1 '... Other ❑ Yes/ ® No 1 75 Field Inspections: LE-100's (Woad Abatement) Total Number of Initial Reltl Total Number of Inspections for Reporting 0 LE-100 Inspections for 0 Month Reporting Month i Prevention Referrals: Total Number of Re -inspections for Reporting ',, 0 Total Number of Fire Month Prevention Referrals for 0 ',. Reporting Month Significant Events Provide a brief synopsis of significant TC's, Fires, Near Drowning's, Road Closures etc... Include photos if available. E-68 Static Display at Ribbon cutting for Sports Clips. E-68 at Paloma High School for career Day 6 hours.