Loading...
OCTOBER 2018 Fire Marshal ReportRIVERSIDE COUNTY THE FIRE DEPARTMENT OFFICE OF THE FIRE MARSHAL, MENIFEE OCTOBER 2018 STATISTICS     FIRE PROTECTION INSPECTIONS   1. New construction inspections for fire protection systems, fire‐life safety and Certificate  of occupancy inspections totaled 253 total for the month of October.    2. The Office of the Fire Marshal reviews all Plan submittals for new construction in‐house.  For October there were a total of 59 new submittals received and 26 plan reviews  conducted by staff.    3. Planning case reviews, 17 planning cases were reviewed by the OFM as part of the  development review for conditions related to fire code compliance.                         Commercial Inspections Conducted in October (for example only)    Sampling of inspections conducted in October    Sampling of Commercial Inspections conducted in October    1. Cal Cruz Tommy’s Car Wash (Fire Alarm and Fire Final for Occupancy)  2. Commerce Pointe II (Fire Life Safety inspection for Certificate of Occupancy)  3. Channel Mfg. (Commerce Pointe, C of O)   4. Café Rio (Fire Alarm, Fire Temporary Certificate of Occupancy)  5. Menifee Lakes Plaza Outparcels 1,2,3,4 (Rough install underground Fire lines)  80, 4%89, 4% 179, 9% 163, 8% 157, 8% 219, 11% 278, 14% 272, 13% 328, 16% 253 13% Office of the Fire Marshal New Construction  Inspections  January‐October 2018 1 2 3 4 5 6 7 8 9 10 (10) October 2018 RIVERSIDE COUNTY THE FIRE DEPARTMENT OFFICE OF THE FIRE MARSHAL, MENIFEE OCTOBER 2018 STATISTICS           New Construction Plan Reviews Conducted in October          Jan‐18, 27, 8% Feb‐18, 14, 4% Mar‐18, 31, 9% Apr‐18, 8, 2% May‐18, 42, 12% Jun‐18, 43, 13%Jul‐18, 63, 18% Aug‐18, 55, 16% Sep‐18, 35, 10% October 2018  26 reviews 8%  OFFICE OF THE FIRE MARSHAL Fire Plan reviews Conducted Year to Date Jan‐18 Feb‐18 Mar‐18 Apr‐18 May‐18 Jun‐18 Jul‐18 Aug‐18 Sep‐18 Oct‐18