Loading...
June 2018 Menifee Fire Marshal Report 29714 Haun Rd. Menifee, CA 92501 Phone (951) 723-3765 • Fax (951) 679-3843 menifeeofm@cityofmenifee.us Riverside County Fire / CAL-FIRE Serving the City of Menifee Monthly Report 5. City of Menifee Office of the fire Marshal Report Planning Case Development Reviews: The Office of the Fire Marshal has been successful in maintaining review turnaround within a week of the required timelines A total of 21 Planning cases were reviewed and conditioned for the month of June, there are currently 10 more new cases in the queue pending review as of this date. Examples (Not a complete list) of Development reviews conducted this month: • Fleming Ranch Project – Tentative Tract Map/ EIR and related design of project. • Quail Valley Market Addition • Paragon Framing Site Plan • T-Mobile Cell Site • Menifee Lakes Plaza • Newport and Menifee Subdivision • Menifee Town Center (Artesa Project) Landscape and Fencing Plan • Extension of Time # 4 (TM29777 ) • Golden Meadows Phasing Plan • American Tire Depot Phasing Plan • Chavez Dog Kennel (Residential Based Business) Construction Plan Reviews: The significant increase in inspection workload has been impacting the plan reviews. Fire Safety Specialist Sonya Rivera-Bu has been working significant overtime to maintain timelines and due dates for turnaround times of 10-15 days. Turnaround time is now within 1 week to a few days of due dates. • For the month of June the OFM reviewed and approved or provided conditions of approval for 41 projects. As of this date there are 30 plans pending review. The completed plans for this month included fire protection systems for the following: 2 Examples (not a complete list) of Construction/Fire Protection Reviews conducted this month: • Blitzer’s Yogurt • Healthy Care Smile Dental • Commerce Point II Interior Revisions • Smart and Final • Goodyear Tire • All Star Super Storage • Newport Town Square • Cortana Club Rec. Center New Fire Protection System and Construction Inspections OFM has conducted 215 field inspections for fire sprinkler systems, water and access for fire clearance, Certificate of Occupancy for Building finals and other related inspections. The County of Riverside Office of the Fire Marshal has been requested to assist and the Market street office has provided (2) inspectors to assist on a case by case basis as they are available. Fire Systems Inspectors Kevin Shin, and Phil Jones from the Riverside Office have assisted this month with the overflow. Inspections are now being scheduled a week in advance, several residential developments are in full production and are requesting inspections scheduled concurrently with other developments. With the start-up of the Menifee Town Center project, and Menifee Lakes Plaza businesses we have a full load and will most likely continue to require supplemental inspection staff for the upcoming surge in inspection requests. Of Note: Riverside County Office of the Fire Marshal welcomes Deputy Fire Marshal Steven Swarthout (Promotion) as the new DFM in charge of West County Offices which includes the City of Menifee. We look forward to working with Steve to mitigate and coordinate resources for continuing to maintain an optimum customer service level. Fee Schedule Update: Assistant City Manager Jeff Wyman has taken the helm along with Chief Geoff Pemberton to coordinate the Fire Fee schedule with the consultant and other city development departments. Meetings will be conducted in July to discuss the details for final approval by council