Loading...
PMT18-04039 City of Menifee Permit No.: PMT18-04039 A&f,/,,, 29714 HAUN RD. MENIFEE, CA 92586 Type: Commercial Mechanical MENIFEE MENIFEE Date Issued: 08/15/2018 PERMIT Site Address: 29950 MENIFEE RD, MENIFEE, CA 92584 Parcel Number: 340-040-008 Construction Cost: $9,850.00 Existing Use: Proposed Use: Description of REPLACE 3 PHASE 6 TON GAS/ELECTRIC PACKAGE UNIT Work: Owner Contractor CITY OF MENIFEE AIR FORCE ONE HEATING AND AIR INC 29714 HAUN ROAD 31566 RAILROAD CANYON ROAD MENIFEE, CA 92586 #682 Applicant Phone:9512440916 CITY OF MENIFEE License Number:955952 29714 HAUN ROAD MENIFEE,CA 92586 Fee Description Oly Amount(S) The issuance of this permit shall not prevent the building official from thereafter requiring the correction of errors in the plans and specifications or from preventing builiding operations being carried on thereunder when in violation of the Building Code or of any other ordinance of City of Menifee.Except as otherwise stated,a permit for construction under which no work is commenced within six months after issuance,or where the work commenced is suspended or abandoned for six months,shall expire,and fees paid shall be forfeited. AA_Bldg_Perm@_Template.rpt Page 1 of 1 BUILDING & SAFETY PERMIT/PLAN CHECK APPLICATION MENIFEE NX DATE: &6 Is L Fir PERMIT/PLAN CHECK NUMBER PLANNING CASE NUMBER TYPE: COMMERCIAL O RESIDENTIAL 0— MULTI-FAMILY O MOBILE HOME O POOL/SPA O.SIGN SUBTYPE: O ADDITION 'ALTERATION O DEMOLITION O ELECTRICAL AMECHANICAL O NEW O PLUMBING 0 RE-ROOF NUMBER OF SQUARES DESCRIPTION OF WORK 9_er%_t(f G - T A-Gc UA 7 PROJECTADDRESS �)Cq5-0 AoAo ZIP S 1 v of Me—n-ire ASSESSOR'S PARCEL NUMBER 3�AO- ()LAO- CCP0 LOT TRACT Building Depi OWNERNAME C17' DF M i ADDRESS 2�77/ yquv jLp /+ `, PHONE 95/- & Z� -&-l77 EMAIL G. o :�' lr ecei Y APPLICANTNAME (i'J'7 D ADDRESS .2-q7/Y Alauv PHONE 6/5_/-6*72-6 77 EMAIL Q UJ1 '! CiOn .Ft CONTRACTOR'S NAME A-/. - F404<, OWNER BUILDER? 0 YES W-NO BUSINESS NAME A110 ADDRESS 3/ s6G f241L C49vy4-,Aj " -.4 () PHONE -qs/ - 2[W_09/6 EMAIL $ r ICe foie q" . Ccvyi CONTRACTOR'S STATE LIC NUMBER Uni'�9c2 LICENSE CLASSIFICATION G-D�0 C--3 VALUATION$ ��,�1 SQ FT L SQ FT p- APPLICANT'S SIGNATURE DATE CITYSTAFF USE ONLY DEPARTMENT DISTRIBUTION ACCEPTED BY: CITY OF MENIFEE BUSINESS LICENSE NUMBER BUILDING PLANNING ENGINEERING FIRE INVOICE TOTAL GREEN SMIP OWNER BUILDER VERIFIED 0 YES 0. NO DRIVERS LICENSE N NOTARIZED LETTER 0 YES 0 NO City of Menifee Building & Safety Department 129714 Haun Rd., Menifee, CA 92586 (951)672.6777 www.cityofinenifee.us yo- NIF STATE OF CALIFORNIA ALTERATIONS - HVAC GEC-CFIR-ALT-04E Revised 01/16 CALIFORNIA ENERGY COMMISSION CERTIFICATE OF COMPLIANCE CF1R-ALT-04-E Alterations-HVAC CZ 2,and 8-15 (Page 1 of 1) Site Address: Enforcement Agency: Date Prepared: Permit#: 21?9SD to-- +Ip a/IS( E ui ment Type Equipment Efficiency New Ducting or Lneset: Conditioned Required R-value Floor Area(ft 2) Thermostat 'Packaged ❑Evaporator Coil AFUE COP 0 R-6 (CZ I-10,12&13)Ducts Served by system 0 Setback System ❑Condensing Unit ❑R-8' (CZ 11,14-16)Ducts ft2 (if not already ❑Split System ❑Compressor SEER HSPF ❑2 R-2.8 Lineset° present must ❑Mini Split ❑Lineset be installed) ❑Furnace ❑TXV EER f h 'F.. HERS VERIFICATION SUMMARY Installer determines work to be completed and matches to one of the options below. At pernadpol ongot, form is allowed to be filled out by hand. For final inspection all forms are to be registered(no hand filled forms allowed)and a copy left iSn site. �W1.HVAC Changeout/Repair Required Compliance Documents to be left on site for Final: All Equipment, CFSR-ALT-02-E AU6ut Condenser Unit,Evaporator Coil, CF2R-MCH-01-E,MCH-20-H,MCH-(23 or 24)2-H,MCH-25-1-12 Compressor,TXV,Lineset, CF3R-MCH-20-H,MCH-(23 or 24)-H2,MCH-25-H2 Air Handler/Furnace2(Can Include new ducting) Re rpse Installer Requirement:Duct leakage(<15%,or 510%to outside,or seal all accessible leaks),Air Flow 2300 CFM/ton,Refrigerant Charge. Exempted from duct leakage testing if: ❑1.Duct system registered with HERS provider as previously sealed,or 0 2.There is less than 40 linear feet of duct In unconditioned space,or 113.Existing duct systems are constructed,insulated or sealed with asbestos(list manufacture date of building-----I ❑2.New HVAC System Required Compliance Documents to be left on site for Final: All new equipment and All New Ducts" CF1R-ALT-02-E including Mini Split CF2R-MCH-01-E,MCH-20-H,MCH-22-H,MCH-(23 or 24)-H2,MCH-25-1-12 CF3R-MCH-20-H,MCH-22-H,MCH-(23 or 24)-H2,MCH-25-H2 Mini Splits require CF1R-ALT-02-E,CF2R-MCH-01-E,and(CF2R-CF3R)MCH-25-H Installer Requirement:Duct leakage<5%,Fan Efficacy(0.58W/CFM),Air Flow 2 350 CFM/ton(or alternative),Refrigerant Charge 113.All New Ducts with Replacement Required compliance Documents to be left on site for Final: All New Ducts"and one or more of the following CF1R-ALT-02-E replaced:Condenser Unit,Evaporator Coil, CF2R-MCH-01-E,MCH-20-H,MCH-(23 or 24)-H,MCH-25-H Compressor,TXV,Lineset,Furnace' CF3R-MCH-20-H,MCH-(23 or 24)-H,MCH-25-H Installer Requirement:Duct leakage<5%,Air Flow 2 350 CFM/ton(or alternative),Refrigerant Charge Exempted from duct leakage testing if:0 1. Existing duct systems are constructed,insulated or sealed with asbestos ❑4.New Ducting over 40 feet Required Compliance Documents to be left on site for Final: New ducting but less than All New Ducts" CF1R-ALT-02-E,CF2R-MCH-20-H,CF3R-MCH-20-H Installer Required to:Duct leakage(515%or,510%to outside or,or seal all accessible leaks) ❑ EXCEPTION:Existing duct systems constructed,insulated or sealed with asbestos. 'All new ducting requires R-8 insulation when more than 40 ft installed in CZs 11&14-16 and R-6 in CZs 1-10,12&13,and R-5 insulation when less than 40 ft installed.This includes In walls,between floors etc. 2 Heating only systems and Air Handler/Furnace changes do not require Air Flow MCH-(23 or 24),or Refrigerant Charge verification MCH-25 "All New Ducts is when at least 75%of the duct system is new duct material,and up to 25%may consist of reused parts from the dwelling unit's existing duct system(e.g.,registers,grilles,boots,air handler,coil,plenums,duct material) ''R-2.8(1"thick insulation)for linesets 1"and less. Contractor(Documentation Author's/Responsible Designer's Declaration Statement) I certify the following under penalty of perjury,under the laws of the State of California: 1. The information provided on this Certificate of Compliance is true and correct. 2. 1 am eligible under Division 3 of the California Business and Professions Code to accept responsibility for the information on this document. 3. That the energy features and performance specifications for the design identified on this Certificate of Compliance conform to the requirements of Title 24,Parts 1 and 6 of the California Code of Regulations(CCR). 4. That the energy features and performance specifications,materials,components,and manufactured devices for the buildingdesign or system design identified on this Certificate of Compliance conform to the requirements of Title 24,Part 1 and Part 6 of the CCR. S. The building design features or system design features identified on this Certificate of Compliance are consistent with the information provided on other applicable compliance documents,worksheets,calculations,plans and specifications submitted to the enforcement agency for approval with this building permit application. Responsible Designer Name: Responsible Designersignature: Date Signed: License: Company: Address: Oty/state/Zlp: Phone: For assistance or questions regarding the Energy Standards,contact the Energy Hotline at:1-800-772-3300