Loading...
PMT17-03458 City of Menifee Permit No.: PMT17-03458 29714 HAUN RD. <ACCELPl MENIFEE, CA 92586 Type: Residential Electrical MENIFEE Date Issued: 10/0612017 PERMIT Site Address: 29101 BOTANICAL CIR, MENIFEE, CA Parcel Number: 92584 Construction Cost: $8,01720 Existing Use: Proposed Use: Description of SOLAR TR 31582 HERITAGE HEIGHTS Work: 7 MODULES, 1 INVERTER,2.24kW LOT 73 Owner Contractor LENNAR HOMES OF CA LENNAR HOMES OF CALIFORNIA INC 980 MONTECITO DR#302 25 ENTERPRISE CORONA,CA 92879 ATTN GOREEN MUELLER Applicant Phone:9493498269 JEREMIAH ACAYTURRI License Number:728102 LENNAR HOMES OF CALIFORNIA INC 25 ENTERPRISE ATTN GOREEN MUELLER ALISO VIEJO, CA 92656 Fee Description 9tt Amount 1$1 Solar, Residential or Small Commercial 1 252.00 Building Permit Issuance 1 27.00 GREEN FEE 1 1.00 SMIP RESIDENTIAL 1 2.00 General Plan Maintenance Fee-Electrical 1 12.60 $294.60 The issuance of this permit shall not prevent the building official from thereafter requiring the correction of errors in the plans and specifications or from preventing builiding operations being carded on thereunder when in violation of the Building Code or of any other ordinance of City of Menifee.Except as otherwise stated,a permit for construction under which no work is commenced within six months after issuance,or where the work commenced is suspended or abandoned for six months,shall expire,and fees paid shall be forfeited. AA_Bldg_Pennit_Template.rpt Page 1 of 1 APPLICATIONBUILDIN & SAFETY PERM IT/PLAN CHECK �Wenifee DATE:09/25/2017 PERMIT/PLAN CHECK NUMBER TYPE: Q COMMERCIAL i.✓✓RESIDENTIAL G MULTI-FAMILY 0 MOBILE HOME % POOL/SPA O SIGN SUBTYPE: KDDITION O ALTERATION C, DEMOLITION O ELECTRICAL t% MECHANICAL O NEW O PLUMBING O RE-ROOF NUMBER OF SQUARES DESCRIPTION OF WORK Solar Permit- Plan 1782 - 2.24 kW/7 PCS Master Solar Permit No.: PMT17-00129 PROJECTADDRESS 29101 Botanical Cir ZIP 92584 ASSESSOR'S PARCEL NUMBER TBD LOT 73 TRACT31582 OWNER NAME Lennar Homes of California, Inc. ADDRESS 980 Montecito Dr. Suite 302, Corona, CA 92879 PHONE 951-817-3680 EMAIL Jeremiah.acayturri@lennar.com APPLICANT NAME Lennar Homes of California, Inc. ADDRESS 980 Montecito DR., Suite 302, Corona, CA 92879 PHONE 951-817-3680 EMAIL Jeremiah.acayturri@lennar.com CONTRACTOR'S NAME Lennar Homes of California, Inc. OWNER BUILDER? ')YES ONO BUSINESS NAME Lennar Homes of California, Inc. ADDRESS 980 Montecito Dr.,Suite 302, Corona, CA 92879 PHONE 951-817-3680 EMAIL leremiah.acayturri@lennar.com CONTRACTOR'S STATE LIC NUMBER 728102 LICENSE CLASSIFICATION A&B VALUATION$ 8017.20 SCt FT L So FT APPLICANT'S SIGNATURE DATE 09/25/2017 DEPARTMENT DISTRIBUTION CITY OF MENIFEE BUSINESS LICENSE NUMBER BUILDING PLANNING ENGINEERING FIRE ACCEPTED BY: PERMITFEE . (10 SMIP 1 GREEN I PLAN CHECK FEE INVOICETOTAL any. (00 OWNER BUILDER VERIFIED OYES G No DRIVERS LICENSE# NOTARIZED LETTER O YES 0 NO City of Menifee Building&Safety Department 29714 Houn Rd. Menifee, CA 92586 951-672-6777 www.cityofinenifee.us SYSTEM INFORMATION BUYER ACKNOWLEDGES THAT THE SOLAR MODULES TO BE INSTALLED ITEM 1 OTY HER. 1 MODEL ON THE ROOF OF THE HOME WILL BE SUBSTANTIALLY IN THE SYSTEM SIZE 2.240 KW I LOCATIONS INDICATED BY THE ILLUSTRATION. MODULE 1 7PCS. LG I LG320EIK-A5(32OW) BUYER: INVERTER 1 7 PCS.1 ENPHASE I Q5PLUS-72-ACM-US ROOF TYPE I TILE W/COMPOSITES SHINGLE UNDER ARRAY DATE: SUB-ARRAY INFORMATION ARRAY#I ARRAY#2 ARRAY#3 ARRAY#4 MOD OTY 7 NA NA NA BUYER: TILT 23° NA• I NA' I NA' AZIMUTH 1 270• NA" I NA' I NA' DATE: City of Menifee Building Dept 3' 5'-6' OCT 0 5 2017 ,, Received SA WIRE TRANSITION BOX (UNDER ARRAY) Z. �ga LL O. NJ ! a l Y OF MENIFE* \ it! I LllING AND S.A .TY DEP T T NNECT %.`4 APPROVAL PV mR-GAR EXTEERIO R-GAR GARAGE UTILITY METER B p 11l �4[p BY MAIN SERVICE PANEL 1 (VERIFIED BY BUILDER) nl. ��.nI J these plans snhall no,he construed to be ape r, f en AC COMBINER BOX �,anV vudaun III pn+.Is ions of the Feder a orOeity .n. ...:n.duulm.,eces.ltus.vet ofapproved plans st kept on the p•talc maul cmnplctwn. NOTE:DIMENSIONS ARE SHOWN IN PLANE OF ROOF PLAN 1782 ELEVATION A-RIGHT ORIENTATION 3 LOT#73 LENNAR: ORIGINAL BY:CHRISTINE MARTINI DATE:17.07.11 HERITAGE HEIGHTS REVIEWED BY:JIM PARKS DATE:17.OZU CO NA,CA I92 DRIVE.#302 CORONA,CA 92879 REV.# BY DATE DESCRIPTION nama MAR aotelt DWG TITLE: PAGE#: SCALE: SITE LOCATION: 4571 Bioadway8 Street INDIVIDUAL 29101 BOTANICAL CIR Boulder,C080304 PLOT PLAN 1 I/16"= I'-0' MENIFEE,CA 303.44Z0300 SYSTEM LAYOUT ELECTRICAL EQUIPMENT SCHEDULE KEY CITY MANUFACTURER MODEL NOTES TRADE 1 7 LG LG320NIK-A5(320W) PV MODULE SOLAR 2 7 ENPHASE 1Q6PLUS-72-ACM-US PV INVERTER SOLAR 3 1 RSTC/SOLAOECK 0786-3R5 PV ROOF JUNCTION BOX, NEMA 3R SOLAR 4 1 CUTLER-HAMMER DG22URB PV AC DISCONNECT,NEMA 3R,240V,30A SOLAR 5 1 ENPHASE 10 ENVOY ENV-IOAMI-240 PV DATA MONITOR,I20V SOLAR 6 1 ENPHASE X-ICI-AMI-240-8 AC COMBINER BOX SOLAR 7 1 ENPHASE TBD PV BREAKER,I X 20A-ZP,I X 5A-IP SOLAR B I CUTLER-HAMMER TBD PV BREAKER.I X 20A-2P,RATING MAY VARY SOLAR 9 1 TBD TBD SERVICE PANEL,200A BUS BLDR. ELEC. 10 1 TBD TBD UTILITY METER, IPH, 120/24OV,200A BLDR. ELEC. II 1 TBD TBD GROUNDING ELECTRODE,UFER BLDR. ELEC. AC MODULE SPECIFICATIONS AND CALCULATIONS INTERCONNECTION CALCULATIONS ITEM NOTE/CALC UNIT DETAIL ITEM UNIT PANEL LOCATION MENIFEE.CA PANEL HER. CUTLER-HAMMER TEMP,AMBIENT HIGH(TMAX) ASHRAE 2% °C 37 BUS RATING AMPS 200 TEMP,AMBIENT LOW(THIN) ASHRAE EXTH.MIN °C -2 MAIN DISCONNECT AMPS 200 TEMP,MODULE TEST(TTEST) MODULE SPEC 'C 25 ALLOWED PV PER NEC AMPS 40 TEMP,DELTA LOW(TELLTA) THIN-TTEST °C -27 PV OCPD DEVICE USED AMPS 20 MOD. MANUFACTURER AC MODULE SPEC LG INTERCONNECTION CALLS: MOD. PART NUMBER AC MODULE SPEC LG320NIK-A5 OEM 1.11A X/(MOOS)= AJI OF CURRENT MOD.POWER STC(P) AC MODULE SPEC WATTS(DO) 320 8.I9A X I.P5= 1024A PEAK OUTPUT POWER STC.(P) AC MODULE SPEC WATTS(AC) 290 1 TIE-IN WITH A 20A/V 2 SPACE PV BACKFEED BREAKER MAX CONTINUOUS OUTPUT POWER STC(P) AC MODULE SPEC WATTS(AC) 280 NOMINAL VOLTAGE/RANGE AC MODULE SPEC VOLTS(AC) 240/211-264 NOMINAL OUTPUT CURRENT OAC) AC MODULE SPEC AMPS(AC) 1,17 NOMINAL FREQUENCY/RANGE AC MODULE SPEC TZ(AC) 60/59.3-60.5 OUTPUT PHASE QUANTITY AC MODULE SPEC PHASE I COMPLIANCE AC MODULE SPEC UL1741 /IEEE1547 GROUNDING AC MODULE SPEC ISOLATED MAX BRANCH CIRCUIT OCPD AC MODULE SPEC AMPS(AC) 20 AC MODULE QUANTITY, MAX PER BRANCH CIRCUIT MOD.CITY BC CITY 7 BRANCH CIRCUIT OUTPUT,IMAXBC (IAC'MOD.QTY BC) AMPS(AC) 8.19 AC MODULE QUANTITY,TOTAL MOD. CITY T QTY 7 TOTAL SYSTEM OUTPUT IMAXTS OAC-MOD.CITY T) AMPS(AC) 1 8.19 CONDUCTOR SIZING CALCULATIONS 1)CONDITION OF USE(COLD: (AMPACITY - TEMP. DERATE 'FILL DERATE)vs. REO'D OMAX) 2)TERMINALS(TERM). AMPACITY AT TERMINALS. V5. REO'D,(TMAX' 1.25) KEY SIZE CU/AL INSULATION CALL. AMPACITY W/O TEMP. FILL RESULT REO'D OCD TYPE DERATES DERATE DERATE (A) (A) USED(A) A #12 CU THWN-2 COU 30 .76 1.0 22.80 B.19 TERM 25 25 10.24 20 8 #10 CU NM-8 COU 40 .91 1.0 36.40 8.19 TERM 35 35 10.24 20 L #10 CU NM-B COU 40 .91 1.0 36.40 8.19 TERM 35 35 10.24 20 CONDUCTOR SCHEDULE KEY CONDUCTORS 1 CU7AL 1 TYPE LOCATION TRADE A 1-#12 ENPHASE 0 CABLE, I-#6G,FREE AIR CU TC-ER ARRAY SOLAR 8 1 3410, 1-#10 EGC I CU I NM-B(ROMEX) I INTERIOR ISOLAR A- 6 C 3-#10, 1-#10 EGC CU NM-B(ROMEX) INTERIOR SOLAR SO O3 I I I ROOF EXTERIOR-GARAGE ELECTRICAL DIAGRAM 2.24OKW LOT#73 ORIGINAL BY:CHRISTINE MARTINI I DATE:17.07.11 HERITAGE HEIGHTS LENNAR: 980 MONTECITO DRIVE,#302 REVIEWED BY:JIM PARKS IDA E:17.07.11 CORONA,CA 92879 REV.# BY DATE DESCRIPTION namast8 vouv DWG TITLE: PAGE#: I SCALE: SITE LOCATION: 4571 BO,,CO 8 Street INDIVIDUAL 29101 BOTANICAL CIR Boulder,CO80004 PLOT PLAN 2 NTS MENIFEE,LA 303.447.0800 ELECTRICAL INSTALLATION NOTES: SOLAR CONTRACTOR- U ALL PV ROOF ATTACHMENTS WILL BE SPACED ALONG MODULE RACKING RAILS AT NOT GREATER THAN 48"O.C. 2)ALL PV ROOF ATTACHMENTS WILL BE STAGGERED BY ROW AMONGST THE ROOF FRAMING MEMBERS,TO MAXIMUM EXTENT POSSIBLE. 3)ROOF PENETRATIONS ASSOCIATED WITH SOLAR RACKING WILL BE SEALED WITH AN APPROVED SEALANT. 4)SOLADECK WIRE TRANSITION BOX WILL BE INSTALLED PER MANUFACTURER'S INSTRUCTIONS. IT WILL BE FLASHED AND SEALED. 5)PV ARRAY WILL BE A MINIMUM OF 3"ABOVE THE COMPOSITE SHINGLE PORTION OF ROOF SURFACE. 6)THE UNIRAC SOLARMOUNT RACKING SYSTEM AND SOLAR PV ARRAY WILL BE INSTALLED ACCORDING TO THE UNIRAC SOLARMOUNT CODE-COMPLIANT INSTALLATION APRIL 2016 EDITION. 7)UNIRAC TOP CLAMPS REQUIRE A ONE QUARTER INCH(e).SPACE BETWEEN PV MODULES. SOLARMOUNT RAILS MUST EXTEND A MINIMUM OF TWO INCHES(2')BEYOND THE EDGE OF THE PV ARRAY/SUB-ARRAY. 8)UNIRAC SOLARMOUNT REQUIRES THAT A THERMAL EXPANSION GAP BE INSTALLED FOR ANY RAIL LENGTH OF GREATER THAN 40'. 9)AN ANIMAL GUARD SHALL BE INSTALLED AROUND THE PERIMETER OF EACH PV ARRAY IN SUCH A WAY AS TO MAINTAIN THE MODULE MANUFACTURER'S WARRANTY. 10)DISTANCE BETWEEN ARRAY EDGE AND TRANSITION FLASHING(COMPOSITION TO TILE)WILL BE A MINIMUM OF 3. IU 26 GAUGE INTERLOCKING FLASHING'SIDEWALL"TO BE INSTALLED ALONG THE LENGTH OF THE PV ARRAY AT ROOFING MATERIAL TRANSITION. IT SHALL BE APROVED PRIOR TO PV SYSTEM INSTALLATION. 12)PEEL-N-STICK BASE TO BE INSTALLED ONE FOOT(I')OR MORE BEYOND THE EDGE OF THE COMPOSITION SHINGLE,DOWN TO THE ROOF EAVE.PEEL-N-STICK BASE TO BE INSTALLED PER MANUFACTURER'S SPECIFICATIONS. 13)AREAS UNDER EACH PV ARRAY SHALL BE ROOFED WITH COMPOSITION SHINGLE.COMPOSITION SHINGLE SHALL RUN FROM ABOVE THE PV ARRAY TO THE ROOF EAVE. TILE INSTALLED BELOW THE ARRAY TO BE INSTALLED ABOVE THE COMPOSITION ROOF PER ROOFER SPECIFICATIONS. 14)BIRDSTOP WILL BE INSTALLED AT THE UPPERMOST TRANSITION FROM TILE TO COMPOSITION SHINGLE UNLESS PV ARRAY IS SPECIFIED TO BE INSTALLED OVER TILE. BIRDSTOP TO BE SPECIFIED BY ROOFER PRIOR TO INSTALLATION. ELECTRICAL NOTES: GENERAL- S ALL PV EQUIPMENT WILL BE TESTED AND LISTED FOR ITS USE BY A NATIONALLY RECOGNIZED TESTING LABORATORY(NRTL). 2)THE GROUNDING OF THE PHOTOVOLTAIC SYSTEM SHALL COMPLY WITH THE APPLICABLE VERSION OF THE NEC/CEC. 3)ALL GROUNDING ELECTRODE CONDUCTORS WILL BE INSTALLED IN A CONTINUOUS LENGTH EXCEPT WHERE SPLICED BY AN IRREVERSIBLE CONNECTOR OR EXOTHERMIC WELD. 4)NON-CURRENT CARRYING METAL PARTS SHALL BE CHECKED FOR PROPER GROUNDING,NOTING THAT TERMINAL LUGS BOLTED ON AN ENCLOSURE'S FINISHED.SURFACE MAY BE ELECTRICALLY INSULATED BECAUSE OF PAINT/FINISH. PAINT/FINISH AT POINT OF CONTACT SHALL BE PROPERLY REMOVED. 5)ROOF PENETRATIONS WILL BE COMPLETED AND SEALED PER APPLICABLE CODE. 6)ALL CONDUCTORS WILL HAVE A 90-C RATING TO ENSURE CODE COMPLIANCE. 7)ENPHASE MICROINVERTERS ARE TESTED AND LISTED FOR COMPLIANCE WITH RAPID SHUTDOWN REQUIREMENTS OF SECTION 690.12 OF THE 2014 NEC. SOLAR CONTRACTOR- 7)MODULE CERTIFICATIONS WILL INCLUDE ULI]03,IEC61646,IEC61730. 8)CONDUIT AND CONDUCTOR SPECIFICATIONS ARE BASED ON MINIMUM CODE REQUIREMENTS. 9)RACEWAY POINT OF PENETRATION FROM EXTERIOR TO INTERIOR WILL BE SEALED TO PREVENT INGRESS OF WATER AND INSECTS. 10)DC WIRING IS LIMITED TO PV ARRAY FOOTPRINT W/ENPHASE MICRO-INVERTER SYSTEM. IU MODULE AND ENPHASE WIRING SHALL BE LOCATED AND SECURED UNDER THE ARRAY USING SUITABLE WIRING CLIPS,WIRING SHALL NOT MAKE CONTACT WITH THE ROOF SURFACE AND SHALL BE MANAGED IN A WORKMAN-LIKE MANNER. 12)EQUIPMENT GROUNDING CONDUCTORS WILL BE SIZED IN ACCORDANCE WITH NEC TABLE 750.122. 13)CONDUCTOR TERMINATIONS WILL BE TORQUED PER DEVICE LISTING,OR MANUFACTURER'S RECOMMENDATIONS. 14)A PV AGGREGATION PANEL(SUB PANEL)WILL NOT BE INCLUDED FOR SYSTEMS WITH ONE BRANCH CIRCUIT. SIGNAGE- 15)PV SYSTEMS SHALL BE CLEARLY MARKED IN ACCORDANCE WITH NEC ARTICLE 690 AND OTHER APPLICABLE STATE AND LOCAL CODES. 16)ALL SAFETY MARKING/PLACARDS SHALL BE PERMANENTLY ATTACHED BY ADHESIVE OR OTHER MECHANICAL MEANS. 17)MARKING/PLACARDS WILL BE METAL OR PLASTIC WITH ENGRAVED OR MACHINE PRINTED LETTERING. BACKGROUND WILL BE RED WITH WHITE CAPITAL LETTERING OF MINIMUM HEIGHT t 18)ALL WIRING/RACEWAYS/JUNCTION BOXES WILL BE MARKED'PHOTOVOLTAIC POWER SOURCE:'OR EQUIVALENT:WIRING/RACEWAYS SHALL BE MARKED EVERY 10'. BUILDER ELECTRICAL AND SOLAR CONTRACTORS- 19)INSTALLATION SHALL BE COMPLETED IN A NEAT AND WORKMAN-LIKE MANNER. 20)SPACE REQUIREMENTS FOR ALL ELECTRICAL EQUIPMENT WILL COMPLY WITH NEC ARTICLE 110.26. ORIGINAL BY:CHRISTINE MARTINI DATE17. LENNAR: 07.11 HERITAGE HEIGHTS REVIEWED BY:JIM PARKS DATE17.07.11 980 MONTECITO DRIVE,#302 CORONA,CA 92879 REV.# BY DATE DESCRIPTION %masud t0ue DWG TITLE: PAGE#: SCALE: SITE LOCATION: INDIVIDUAL 4571 Bmatlway SVeat PLOT PLAN 3 NTS MENI BOTANICAL CIR Boulder,0080304 NOTES ENIFEE,CA 303.447.0300 CAUTION: POWER TO THIS BUILDING IS SUPPLIED BY THE UTILITY AND A SOLAR PV SYSTEM. DISCONNECTS ARE LOCATED AS SHOWN. SOLADECN WIRE TRANSITION BOX (UNDER ARRAY) PV AC DISCONNECT EXTERIOR-GARAGE UTILITY METER e MAIN SERVICE PANEL (VERIFIED BY BUILDER) AC COMBINER BOX SERVICE BY QUALIFIED PERSONNEL ONLY CONTACT: SUNSTREET ENERGY GROUP 1-877-SLR-POWR PV POWER SOURCE - AC SPECS PHOTOVOLTAIC SYSTEM EQUIPPED AC OPERATING VOLTAGE: 240 V WITH RAPID SHUTDOWN AC OPERATING CURRENT: 8. 19A I PC., NEC 690.54 1 PC., NEC 690.12 NOTE: SEE MASTER SET FOR ADDITIONAL PLACARD INFORMATION LENNAR: ORIGINAL BY:CHRISTINE MARTINI DATEJ7.07.11 HERITAGE HEIGHTS 960 MONTECITO DRIVE,#302 REVIEWED BY:JIM PARKS I DATE17.07.11 CORONA,CA 92879 REV.# BY DATE DESCRIPTION Vna=18156 so%t DWG TITLE: PAGE#: SCALE: SITE LOCATION: INDIVIDUAL 49t Braatlway Street PLOT PLAN 4 NTS 29101 BOTANICAL CIR Boulder,GO 80304 PLACARDS MENIFEE,CA 303.447.0300