Loading...
PMT17-01678 City of Menifee Permit No.: PMT17-01678 29714 HAUN RD. Type: Residential Electrical -CACCELA— MENIFEE,CA 92586 MENIFEE Date Issued: 06/1312017 PERMIT Site Address: 30360 BRISTOL GATE LN, MENIFEE,CA Parcel Number: 364-360-013 92584 Construction Cost: $6.328.72 Existing Use: Proposed Use: Description of SOLAR TR 30422-3 MARIPOSA Work: 9 MODULES,2.36KW LOT 33 Owner Contractor LENNAR HOMES OF CA LENNAR HOMES OF CALIFORNIA INC 980 MONTECITO DR#302 25 ENTERPRISE CORONA,CA 92879 ATTN GOREEN MUELLER Applicant Phone:9493498269 JEREMIAH ACAYTURRI License Number:728102 LENNAR HOMES OF CALIFORNIA INC 25 ENTERPRISE ATTN GOREEN MUELLER ALISO VIEJO,CA 92656 Fee Description MY Amount(El Solar,Residential or Small Commercial 1 252.00 Building Permit Issuance 1 27.00 GREEN FEE 1 1.00 SMIP RESIDENTIAL 1 1.00 General Plan Maintenance Fee-Electrical 1 12.60 $293.60 The issuance of this permit shall not prevent the building official from thereafter requiring the correction of errors in the plans and specifications or from preventing builiding operations being carried on thereunder when in violation of the Building Code or of any other ordinance of City of Menifee.Except as otherwise stated,a permit for construction under which no work is commenced within six months after issuance,or where the work commenced is suspended or abandoned for six months,shall expire,and fees paid shall be forfeited. AA_Bldg_Permit_Template.rpt Page 1 of 1 & SAFETY PERMIT/PLAN CHECK APPLICATION "_. 5, Menifee DATE 05/03/2017 PERMIT/PLAN CHECK NUMBER TYPE: ❑COMMERCIAL ❑✓ RESIDENTIAL [—]MULTI-FAMILY ❑MOBILEHOME ❑POOL/SPA ❑SIGN SUBTYPE: ❑✓ ADDITION ❑ALTERATION ❑DEMOLITION ❑ELECTRICAL [—]MECHANICAL ❑NEW ❑PLUMBING ❑RE-ROOF-NUMBER OF SQUARES DESCRIPTION OF WORK Solar Permit-Plan 2129-2.36kW 19PCS Master Solar Permit No.:PMT14-02629 PROJECT ADDRESS 30360 Bristol Gate Ln, Menifee,CA 92584 ASSESSOR'S PARCEL NUMBER 364360-013 LOT 33 TRACT 30422-3 PROPERTY OWNER'S NAME Lennar Homes of California, Inc. ADDRESS 980 Montecito Dr.,suite 302, Corona, CA 92879 PHONE (951)817-3680 EMAIL jeremiah.acayturri@lennaccom APPLICANT NAME Lennar Homes of California,Inc. ADDRESS 980 Montecito Dr., Suite 302,Corona,CA 92879 PHONE (951)817-3680 EMAIL jeremiah.acayturri@lennar.com CONTRACTOR'S NAME Lennar Homes of California,Inc. OWNER BUILDER? ❑✓ YES❑NO BUSINESS NAME Lennar Homes of California, Inc. ADDRESS 980 Montecito Dr., Suite 302,Corona,CA 92879 PHONE (951)817-3680 EMAIL jeremiah.acayturri@lennaccom CONTRACTOR'S STATE LC NUMBER 728102 LICENSE CLASSIFICATION VALUATION$ 6 / 32 2 72 5 L SO FT APPLICANT'S SIGNATURE DATE 05/02/2017 CITY STAFF USE ONLY DEPARTMENT DISTRIBUTION I� CITY OF MENIFEE BUSINESS LICENSE NUMBER BUILDING PLANNING ENGINEERING FIRE GREEN l SMIP �v INVOICE PAID AMOUNT �AMOUNT z & OCASH OCHECKN OCREDITCARD VISA/MC PLAN CHECK FEES PAIDAMOUNT OCASH OCHECKU OCREDITCARD VISA/MC OWNER BUILDER VERIFIED O YES O NO DL NUMBER NOTARIZED LETTER O YES O NO City of Menifee Building&Safety Department 29714 Haun Rd. Menifee, CA 92586 951-672-6777 www.citycfinenifee.us Inspection Request Line 951-245-6213 SYSTEM INFORMATION r J� BUYER ACKNOWLEDGES THAT THE SOLAR MODULES TO BE INSTALLED ITEM OTY MFR. MODEL Mike DereNt ON THE ROOF OF THE HOME WILL BE SUBSTANTIALLY IN THE SYSTEM SIZE 2.385 KW Sr VPOIxraHons LOCATIONS INDICATED BY THE ILLUSTRATION. MODULE 9 PCS. HYUNDAI HIS-S265RG (265W) Uc03001333 c,.,,B BUYER: INVERTER 1 9 PCS.1 ENPHASE I 11215-60-2LL-522-IG ROOF TYPE I TILE W/COMPOSITE SHINGLE UNDER ARRAY DATE: SUB-ARRAY INFORMATION ARRAY#I ARRAY#2 ARRAY#3 >rjry OF MEN MOD OTY 9 NA NA BUYER:-- TILT 23° NA° NA° AZIMUTH 1 268° 1 NA- NA' City Of Menifee DATE: RUHG AI Buildir)g Dept FLAN A PRa MAY 3 0 2017 .0 Received REVIEW Ai 3' `A rcroval of tl ese plat aflpruval of,an f violatf regulations an ordinal z jobsite until coi apletior E,LL I I ao I I I I I l I I I I l I SOLADECK WIRE l TRANSITION BOX (UNDER ARRAY) I 9 I I ( � PV DISCONNECT O EXTERIOR-GARAGE UTILITY METER B MAIN SERVICE PANEL (VERIFIED BY BUILDER) n� lr� NOTE:DIMENSIONS ARE SHOWN IN PLANE OF ROOF �I I® PLAN 2129 ELEVATION C-RIGHT ORIENTATION I LOT#3 ORIGINAL BY: DESIREE WILLIAMS DATE:17.4,25 980 MARIPOSA LENNAR: REVIEWED BY:SHAUN MARUNA DATE:I7.4.25 AT THE LAKES CORONk CA ECITO DRIVE,#302 CORON0.CA 92879 REV.# BY DATE DESCRIPTION namast:e col.. DWG TITLE: PAGE#: SCALE: SITE LOCATION; 4577 a8 Sheet 3U360 BRISTOL GATE LN Boulder,lder,C 04 O603 PLOT PLAN 303A I I/16'=I'-0' MENIFEE,CA 303.447.030D SYSTEM LAYOUT MODULE SPECS AND CALCULATIONS INVERTER SPECS AND CALCULATIONS ITEM NOTE/CALC UNIT DETAIL ITEM NOTE/CALC UNIT DETAIL LOCATION MENIFEE,CA INV.MAKE INVERTER SPEC ENPHASE TEMP,AMBIENT HIGH(TMAK) ASHRAE 2% °C 37 INV.MODEL INVERTER SPEC M215.60-2LL-S22-IG TEMP,AMBIENT LOW(TMIN) ASHRAE EXTR.MIN °C -2 INV. MAX POWER,(WAC MAX) INVERTER SPEC WATTS(AC) 225 TEMP,MODULE TEST(TEEST) MODULE SPEC °C 25 INV. INPUT V.(VDC MAX) INVERTER SPEC VOLTS(DO) 48 TEMP,DELTA LOW(TDELTA) THIN-TTEST °C -27 INV. OUTPUT V.(VAC NDM) INVERTER SPEC VOLTS(AC) 240 MOD. MANUFACTURER MODULE SPEC HYUNDAI INV. OUTPUT FREQUENCY INVERTER SPEC HERTZ 60 MOD. PART NUMBER MODULE SPEC HIS-S265RG INV. OUTPUT CURRENT. IAC INVERTER SPEC AMPS(AC) 0.9 MOD. POWER STC(P) MODULE SPEC WATTS 00 265 INV. PHASE QUANTITY INVERTER SPEC PHASE I MOD. POWER PTC MODULE SPEC WATTS(Dc) 238 COMPLIANCE INVERTER SPEC UL1741/IEEE1547 FF MOD. OPERATING VOLTAGE(VMP) MODULE SPEC VOLTS(DO 31.30 INV. GROUNDING INVERTER SPEC ISOLATED MOD. OPEN CCT.VOLTAGE(VDC) MODULE SPEC VOLTS(Dc) 38.10 INV. 07Y,MAX/BRANCH CCT. INV.aTYec QTY 9 MOD. COEFF.VOLT/TEMP(COEF) MODULE SPEC V/°C -0JI4 BRANCH CCT. OUTPUT,IMAXBC I(IAC-INV.QTY6U I AMPS(AC) 1 8.10 MOD, MAX VOLTAGE (VMAXMOD) Me+(To•COEF)) VOLTS(DO) 41.18 INV. QUANTITY,TOTAL I INV.QTYT I OTY I 9 MOD.OPERATING CURRENT(IMP) MODULE SPEC AMPS(a) 8.50 TOTAL SYSTEM OUTPUT,IMA%TS I(IAC•INV.QTYT) I AMPS(AC) 1 8.10 MOD.SHORT CCT.CURRENT(Ise) MODULE SPEC AMPS(DC) 9.00 MOD.MAXIMUM CURRENT(IMAX) (Ise° 1.25) AMPS(oc) 11.25 MIN.AMPACITY REO'D,PER NEC (IMA%• 1.25) AMPS(DC) 14.06 SERIES FUSE RATING.MAX MODULE SPEC AMPS W IS ELECTRICAL EQUIPMENT SCHEDULE KEY QTY MANUFACTURER MODEL NOTES TRADE 1 9 HYUNDAI HIS-S265RG(265W) PV MODULE SOLAR ,al not be t 2 9 ENPHASE M215-60-2LL-S22-IG PV INVERTER SOLAR 3 I RSTC/SOLADECK 0786-3R5 PV ROOF JUNCTION BOX,NEMA 3R SOLAR If a ly proIds 4 I CUTLER-HAMMER DG221URS PV AC DISCONNECT,NEMA 3R,240V,30A SOLAR IS set 01 5 I ENPHASE ENVOY PV DATA MONITOR, 120V SOLAR '• 6 I TBD TBD 120V DEDICATED RECEPTACLE FOR ENVOY PV DATA MONITOR SOLAR 7 I TBD TBD CATS PORT FOR SOLAR PV INTERNET CONNECTION TO HOME NETWORK BOX SOLAR 8 NOTE CUTLER-HAMMER TBD PV BRANCH CIRCUIT BREAKERS;I x I5A-IP(ENVOY) SOLAR ' 9 NOTE CUTLER-HAMMER TBD PV BREAKER. I X 20A-ZP,LOCATE AT OPPOSITE ENO OF BUS FROM MAIN BREAKER SOLAR 10 I TBD TBO SENEL,MIN. 125A BUS BLDR.ELEC. II T80 TBD UTILITYRVICE PA METER,IPH. 120/24OV,200A BLDR.ELEC. 12 I TBD TBD GROUNDING ELECTRODE UFER BLDR.ELEC. 13 I TBD I TBD I GROUNDING ELECTRODE,690.47(D) I SOLAR CONDUCTOR SIZING CALCULATIONS INTERCONNECTION CALCULATIONS N CONDITION OF USE(COU): (AMPACITY° TEMP.DERATE° FILL DERATE)VS. REQ'D(IMA%) ITEM UNIT PANEL 2)TERMINALS(TERM): AMPACITY AT TERMINALS.YS.REO'D,(IMAX' 1.25) PANEL MFR. CUTLER-HAMMER KEY SIZE CU/AL INSULATION CALC. AMPACITY W/O TEMP. FILL RESULT REO'D OCD BUS RATING AMPS 200 TYPE DERATES DERATE DERATE (A) (A) USED(A) MAIN DISCONNECT AMPS 200 A #12 CU THWN-2 COU 30 0.76 1.0 22.BO 8.10 ALLOWED PV PER NEC AMPS 40 TERM 25 1 25 10.13 20 PV OCPD DEVICE USED AMPS 20 B #10 CU NM-B COU 40 0.91 1.0 36.40 8.10 TERM 35 i 35 10.13 2D ^ n C #10 CU NM-B COU 40 0.91 1.0 36.40 8.10 aIff3 - TERM 35 35 10.13 20 Mike ONaOIt CONDUCTOR SCHEDULE Udii=1�33oClang KEY CONDUCTORS CU/ALWBARE LOCATION TRADE A 1-#12 ENGAGE CABLE, 1-#6G,FREE AIR CU ARRAY SOLAR B 3-#10, 1-#10 EGC CU INTERIOR BOLAR C 3-#10, 1-#10 EGC CU INTERIOR SOLAR D CAT5E,ETHERNET CABLE CU INTERIOR SOLAR E 1-#6GEC,2010 GEC 69D.47(D) CU EXTERIOR SOLAR 5 6 II 7 • # O _ SEE NOTE 15 10 ® MO O O O O -�N 13_ E A B C e 12 I ROOF E%TERIOR-GARAGE ELECTRICAL DIAGRAM 2.305 KW LOT#33 LENNAR: ORIGINAL BY: DESIREE WILLIAMS DATE:I7.L.25 MARIPOSA 980 MONTECITO DRIVE,#302 REVIEWED BY:SHAUN MARUNA I DATE:17.4.25 AT THE LAKES CORONA,CA 92879 REV.# BY DATE DESCRIPTION V , namasbe SOLAR DWG TITLE: PAGE#: SCALE: SITE LOCATION: treet INDIVIDUAL 4571ldur,C a8 304 PLOT PLAN 2 NTS 30360 BRISTOL GATE LN BO303A 7. 80304 ELECTRICAL MENIFEE,CA 303Ag7.0300 STRUCTURAL NOTES: MikeDuf alt SOLAR CONTRACTOR- SrVPOWatib m 1)ALL PV ROOF ATTACHMENTS WILL BE SPACED ALONG MODULE RACKING RAILS AT NOT GREATER THAN 48'O.C. UcN 1WI133 Oase8 2)ALL PV ROOF ATTACHMENTS WILL BE STAGGERED BY ROW AMONGST THE ROOF FRAMING MEMBERS,TO MAXIMUM EXTENT POSSIBLE. 3)ROOF PENETRATIONS ASSOCIATED WITH SOLAR RACKING WILL BE SEALED WITH AN APPROVED SEALANT. 4)SOLADECK WIRE TRANSITION BOX WILL BE INSTALLED PER MANUFACTURER'S INSTRUCTIONS. IT WILL BE FLASHED AND SEALED. 5)PV ARRAY WILL BE A MINIMUM OF 3'ABOVE THE COMPOSITE SHINGLE ROOF SURFACE. 6)THE UNIRAC SOLARMOUNT RACKING SYSTEM AND SOLAR PV ARRAY WILL BE INSTALLED ACCORDING TO THE UNIRAC SOLARMOUNT CODE-COMPLIANT INSTALLATION MANUAL,VERSION 227.3.PUB 140113-ICC,JANUARY 2014. 7)UNIRAC TOP CLAMPS REQUIRE A ONE INCH(I')SPACE BETWEEN PV MODULES.SOLARMOUNT RAILS MUST EXTEND A MINIMUM OF TWO INCHES(21 BEYOND THE�� ��� OF THE PV ARRAY/SUB-ARRAY. 8)UNIRAC SOLARMOUNT REQUIRES THAT A THERMAL EXPANSION GAP BE INSTALLED FOR ANY RAIL LENGTH OF GREATER THAN 40'. ROOFING CONTRACTOR- U DISTANCE BETWEEN ARRAY EDGE AND TRANSITION FLASHING(COMPOSITION TO TILE)WILL BE A MINIMUM OF 3'. 2)26 GAUGE INTERLOCKING FLASHING'SIDEWALL'TO BE INSTALLED ALONG THE LENGTH OF THE PV ARRAY AT ROOFING MATERIAL TRANSITION. IT SHALL BEP • APROVED PRIOR TO PV SYSTEM INSTALLATION. 3)PEEL-N-STICK BASE TO BE INSTALLED ONE FOOT 00 OR MORE BEYOND THE EDGE OF THE COMPOSITION SHINGLE,DOWN TO THE ROOF EAVE.PEEL-N-STICK E T BE INSTALLED PER MANUFACTURER'S SPECIFICATIONS. 4)AREAS UNDER EACH PV ARRAY SHALL BE ROOFED WITH COMPOSITION SHINGLE. COMPOSITION SHINGLE SHALL RUN FROM ABOVE THE PV ARRAY TO THE ROO 5)TILE INSTALLED BELOW THE ARRAY TO BE INSTALLED ABOVE THE COMPOSITION ROOF PER ROOFER SPECIFICATIONS, 6)BIRDSTOP WILL BE INSTALLED AT THE UPPERMOST TRANSITION FROM TILE TO COMPOSITION SHINGLE.BIRDSTOP TO BE SPECIFIED BY ROOFER PRIOR TO INSTALLATION. em -Led to be i permit f of the fedc ral,state I roved plan must be ELECTRICAL NOTES: GENERAL- O ALL PV EQUIPMENT WILL BE TESTED AND LISTED FOR ITS USE BY A NATIONALLY RECOGNIZED TESTING LABORATORY(NRTL). 2)THE GROUNDING OF THE PHOTOVOLTAIC SYSTEM SHALL COMPLY WITH THE APPLICABLE VERSION OF THE NEC/CEC. 3)ALL GROUNDING ELECTRODE CONDUCTORS WILL BE INSTALLED IN A CONTINUOUS LENGTH EXCEPT WHERE SPLICED BY AN IRREVERSIBLE CONNECTOR OR EXOTHERMIC WELD. 4)NON-CURRENT CARRYING METAL PARTS SHALL BE CHECKED FOR PROPER GROUNDING,NOTING THAT TERMINAL LUGS BOLTED ON AN ENCLOSURE'S FINISHED SURFACE MAY BE ELECTRICALLY INSULATED BECAUSE OF PAINT/FINISH. PAINT/FINISH AT POINT OF CONTACT SHALL BE PROPERLY REMOVED. 5)ROOF PENETRATIONS WILL BE COMPLETED AND SEALED PER APPLICABLE CODE. 6)ALL CONDUCTORS WILL HAVE A 9D°C RATING TO ENSURE CODE COMPLIANCE. SOLAR CONTRACTOR- 7)MODULE CERTIFICATIONS WILL INCLUDE UL1703,IEC61646,IEC61730. B)CONDUIT AND CONDUCTOR SPECIFICATIONS ARE BASED ON MINIMUM CODE REQUIREMENTS. 9)RACEWAY POINT OF PENETRATION FROM EXTERIOR TO INTERIOR WILL BE SEALED TO PREVENT INGRESS OF WATER AND INSECTS. 10)DC WIRING IS LIMITED TO PV ARRAY FOOTPRINT W/ENPHASE MICRO-INVERTER SYSTEM. II)MODULE AND ENPHASE WIRING SHALL BE LOCATED AND SECURED UNDER THE ARRAY USING SUITABLE WIRING CLIPS. WIRING SHALL NOT MAKE CONTACT WITH THE ROOF SURFACE AND SHALL BE MANAGED IN A WORKMAN-LIKE MANNER. 12)EQUIPMENT GROUNDING CONDUCTORS WILLBE SIZED IN ACCORDANCE WITH NEC TABLE 250.122. 13)CONDUCTOR TERMINATIONS WILL BE TORQUED PER DEVICE LISTING,OR MANUFACTURER'S RECOMMENDATIONS. 14)A PV AGGREGATION PANEL(SUB PANEL)WILL NOT BE INCLUDED FOR SYSTEMS WITH ONE BRANCH CIRCUIT. 15)A DEDICATED 120V BRANCH CIRCUIT IS REQUIRED IN MASTER CLOSET(OR EQUIVALENT)FOR ENPHASE ENVOY MONITOR. SIGNAGE- 16)PV SYSTEMS SHALL BE CLEARLY MARKED IN ACCORDANCE WITH NEC ARTICLE 690 AND OTHER APPLICABLE STATE AND LOCAL CODES. 17)ALL SAFETY MARKING/PLACARDS SHALL BE PERMANENTLY ATTACHED BY ADHESIVE OR OTHER MECHANICAL MEANS. 18)MARKING/PLACARDS WILL BE METAL OR PLASTIC WITH ENGRAVED OR MACHINE PRINTED LETTERING.BACKGROUND WILL BE RED WITH WHITE CAPITAL LETTERING OF MINIMUM HEIGHT k- 19)ALL WIRING/RACEWAYS/JUNCTION BOXES WILL BE MARKED'PHOTOVOLTAIC POWER SOURCE;OR EQUIVALENT;WIRING/RACEWAYS SHALL BE MARKED EVERY 10'. BUILDER ELECTRICAL AND SOLAR CONTRACTORS- 20)INSTALLATION SHALL BE COMPLETED IN A NEAT AND WORKMAN-LIKE MANNER. 21)SPACE REQUIREMENTS FOR ALL ELECTRICAL EQUIPMENT WILL COMPLY WITH NEC ARTICLE 110.26. LENNAR: ORIGINAL BY: DESIREE WILLIAMS DATE:17.L.25 MARIPOSA REVIEWED BY:SHAUN MARUNA DATE:17.4-25 AT THE LAKES CO NA,CA 2 DRIVE,N302 CORONA,CA 92879 REV.# BY DATE DESCRIPTION tamasV6 SOt.2 DWG TITLE: PAGE Or SCALE: SITE LOCATION: INDIVIDUAL ASI1 Ber,CO8 304 PLOT PLAN 3 NTS 30360 BRISTOL GATE LN BO301 C080309 NOTES MENIFEE,CA 303.44].0300 ���� MIYe oarame Sr VP OpereNdoe UW11=3 ClassB CAUTION: POWER TO THIS BUILDING IS SUPPLIED BY THE UTILITY AND A SOLAR PV SYSTEM. DISCONNECTS ARE LOCATED AS SHOWN. f )r an Iry SO it an the WIRE ----TRANSITION BOX (UNDER ARRAY) PV AC DISCONNECT EXTERIOR-GARAGE UTILITY METER& MAIN SERVICE PANEL (VERIFIED BY BUILDER) SERVICE BY QUALIFIED PERSONNEL ONLY CONTACT: SUNSTREET ENERGY GROUP 1-877-SLR-POWR PV POWER SOURCE - AC SPECS AC OPERATING VOLTAGE: 240 V AC OPERATING CURRENT: 8.1 A NOTE: SEE MASTER SET FOR ADDITIONAL PLACARD INFORMATION ORIGINAL BY: DESIREE WILLIAMS DATE:17.4.25 MARIPOSA LENNAR: 980 MONTECITO DRIVE,#302 REVIEWED BY:SHAM MARUNA I DATE:17.4.25 AT THE LAKES CORONA,CA 92879 REV.# BY DATE DESCRIPTION Qd namasb6 serwa DWG TITLE: PAGE#: SCALE: SITE LOCATION: 4571 Bmad ay Street INDIVIDUAL 30360 BRISTOL GATE LN Boulder,CO 8D304 PLOT PLAN 4 NTS PLACARDS MENIFEE,CA 303.447.0300