Loading...
PMT17-00011 City of Menifee Permit No.: PMT17-00011 29714 HAUN RD. Type: Residential Alteration '5A_CCEG/ MENIFEE, CA 92586 `"•""-"'s'�""`° MENIFEE Date Issued: 01/0 412 01 7 PERMIT Site Address: 29062 PASEO JUANITA, MENIFEE, CA Parcel Number: 341-141-017 92587 Construction Cost: $1,100.00 Existing Use: 1 &2 Family Residence Proposed use: Description of SPECIAL INSPECTION CODE CASE CE-16-1200 AS-BUILT WINDOW CHANGE OUT, NEW Work: WINDOWS ARE DIFFERENT SIZE THAN PREVIOUS WINDOWS Owner Contractor DANIEL MATTHEWS , 29062 PASEO JUANITA MENIFEE,CA 92587 Applicant. License Number: DANIEL MATTHEWS 29062 PASEO JUANITA MENIFEE,CA 92587 Phone:9514301532 Fee Description Qtv Amount I$l Building Permit Issuance 1 27.00 Inspections not specified 129 129.07 $166.07 The issuance of this permit shall not prevent the building official from thereafter requiring the correction of errors in the plans and specifications or from preventing building operations being carried on thereunder when in violation of the Building Code or of any other ordinance of City of Menifee.Except as otherwise stated,a permit for construction under which no work is commenced within six months after issuance,or where the work commenced is suspended or abandoned for six months,shall expire,and fees paid shall be forfeited. 8Idg_Pe"it_Template.rpt Page 1 of 1 CITY OF MENIFEE LICENSED DECLARATION property who builds or improves thereon,and who contracts forthe projects I hereby affirm under penalty of perjury that I am under provisions of with a licensed contractor(s)pursuant to the Contractors State License Law). Chapter9(commencing with section 7000)of Division 3 of the Business and ❑I am exempt from licensure under the Contractor's State License Law for Professions Code and my license is in full farce and effect. the following reason: License Class License No. By my signature below I acknowledge that,except for my personal residence Expires Signature in which I must have resided for at least one year prior to completion of WORKER'S COMPENSATION DECLARATION improvements covered by this permit.I cannot legally sell a structure that I have built as an owner-builder if it has not been constructed in Its entirety by ❑I hereby affirm under penalty of perjury one of the following declarations:I licensed contractors.I understand that a copy of the applicable law,Section have and will maintain a certificate of consent of self-insure for worker's 7044 of the Business and Professions Code,is available upon request when compensation,issued by the Director of Industrial Relations as provided for this application is submitted or at the following website: by Section 3700 of the Labor Code,for the performance of work for which www info. a.. v calaw.html. this permit is issued. Policy# Date ❑I have and will maintain worker's compensation insurance,as required by PROPERTY OWNER OR AUTHORIZED AGENT section 3700 of the Labor Code,for the performance of the work for which ❑By my signature below I certify to each of the following:I am the property this permit is issued.My workers compensation insurance carrier and policy owner or authorized to act on the property owner's behalf.I have read this number are: application and the information I have provided is correct.I agree to comply Carrier with all applicable city and county ordinances and state laws relating to building construction.I authorize representatives of this city or county to Policy# Expires enter the above identified property for inspection purposes. (This section need not to be completed is the permit is for one-hundred Date dollars($100)or less PROPERTY OWNER OR AUTHORIZED AGENT ❑I certify that in the performance of the work for which this permit is issued, I shall not employ any persons in any manner so as to become subject to the CITY BUSINESS LICENSE# worker's compensation laws of California,and agree that if I should become HAZARDOUS MATERIAL DECLARATION subject to the worker's compensation provisions of Section 3700 of the Labor Code,I shall forthwith comply with those provisions. Will the applicant or future building occupant handle hazardous material or a Applicant Date mixture containing a hazardous material equal to or greater that the amounts specified on the Hazardous Materials Information Guide? WARNING:FAILURE TO SECURE WORKER'S COMPENSATION COVERAGE IS ❑Yes ❑No UNLAWFUL,AND SHALL SUBJECT AN EMPLOYER TO CRIMINAL PENALTIES Will the intended use of the building by the applicant or future building AND CIVIL FINES UP TO ONE HUNDRED THOUSAND DOLLARS($300,000),IN ADDITION TO THE COST OF COMPENSATION,DAMAGES AS PROVIDED FOR occupant require a permit for the construction or modification from South IN SECTION 3706 OF THE LABOR CODE,INTEREST,AND ATTORNEYS FEES Coast Air Quality Management District(SCAOMD)75ee permitting checklist for guidelines CONSTRUCTION LENDING AGENCY ❑Yes ❑No I hereby affirm that under the penalty of perjury there is a construction Will the proposed building or modified facility be within 1000 feet of the lending agency for the performance of the work which this permit is issued outer boundary of a school? (Section 3097 Civil Code) ❑Yes ❑No OWNER BUILDER DECLARATIONS I have read the Hazardous Material Information Guide and the SCAOMD I hereby affirm under penalty of perjury that I am exempt from the permitting checklist.I understand my requirements under the State of Contractors License Law for the reason(s)indicted below by the California Health&Safety Code,Section 25505 and 25534 concerning hazardous material reporting. checkmark(s)I have placed next to the applicable item(s)(Section 7031.5 Dyes ❑No Business and Professions Code).Any city or county that requires a permit to Date construct,alter,improve,demolish or repair any structure,priorto its PROPERTY OWNER OR AUTHORIZED AGENT Issuance,also requires the applicant for the permit to file a signed statement that he or she is licensed pursuant to the provisions of the Contractor's State EPA RENOVATION,REPAIR AND PAINTING IRRPI License Law(Chapter 9(commencing with Section 7000)of Division 3 of the The EPA Renovation,Repair and Painting(RRP)Rule requires contractors Business and Professions Code)or that he or she is exempt from licensure receiving compensation for most work that disturbs paint in a pre-1978 and the basis for the alleged exemption.Any violation of Section 7031.5 by an A licant for a permit subjects the applicant to a civil penalty of not more residence or childcare facility to be RRP-certified firms and comply with th ($500). required practices.This includes rental property owners and property managers who do the paint-disturbing work themselves or through their I,as owner of the property,or my employee with wages as their sole employees.For more information about EPA's Renovation Program visit: compensation,will do( )all of or( )portion of the work,and the structure is www.epa.eov/lead or contact the National Lead Information Center at not intended or offered for sale.(Section 7044,Business and Professions 1-800-424-LEAD(5323). Code;The Contractor's State License Law does not apply to an owner of a ❑An EPA Lead-Safe Certified Renovator will be responsible for this project property who,through employees or personal effort,builds or improves the property provided that the improvements are not intended or offered for Certified Firm Name: sale.If,however,the building or improvement is sold within one year of Firm Certification No.: completion,the Owner-Builder will have the burden of proving that it was not built or improved for the purpose of sale. ❑No.EPA Lead-Safe Certified Firm is required for this project because: ❑I,as owner of the property am exclusively contracting with licensed contractors to construct the project(Section 7044,Business and Professions Code:The Contractor's State License Law does not apply to an owner of a If your project does not comply with EPA RRP rule please fill out the RRP Acknowledgement. BUILDING & SAFETY ■ APPLICATION .Menifee DATE /2- PERMIT/PLAN CHECK NUMBER I — coo TYPE: O COMMERCIAL &RESIDENTIAL O MULTI-FAMILY O MOBILE HOME O POOL/SPA O SIGN SUBTYPE: O ADDITION O ALTERATION O DEMOLITION O ELECTRICAL O MECHANICAL O NEW O PLUMBING O RE-ROOF-NUMBER OF SQUARES DESCRIPTION OF WORK d 5- r 4f PROJECT ADDRESS Z,' d 6 2 ASSESSOR'S PARCEL NUMBER 141 _�O', LOT 1- TRACT OWNER NAME ADDRESS O 7 2 ! v ^ PHONE / jl- Y ?� — � J Z EMAIL `/Ch o ✓x5- C: ecpA APPLICANT NAME ADDRESS PHONE EMAIL CONTRACTOR'S NAME OWNER BUILDER? O YES ONO BUSINESS NAME ADDRESS PHONE EMAIL CONTRACTOR'S STATE LIC NUMBER LICENSE CLASSIFICATION VALUATION$ //,00 SQ FT L SO,FT q APPLICANT'S SIGNATURE DATE DATE CITY STAFF USE ONLY DEPARTMENT DISTRIBUTION CITY OF MENIFEE BUSINESS LICENSE NUMBER BUILDING PLANNING ENGINEERING FIRE GREEN SMIP INVOICE AMOUNT PAIDAMOUNT OCASH OCHECK# OCREDrr CARD VISA/MC PLAN CHECK FEES PAID AMOUNT OCASH 0CHECK# OCREDITCARD VISA/MC OWNER BUILDER VERIFIED OYES O NO DL NUMBER NOTARIZED LETTER O YES O NO City of Menifee Building&Safety Department 29714 Naun Rd. Menifee, CA 92586 951-672-6777 www.cityofrnenifee.us Inspection Request Line 951-246-6213 J � New Window 4' x 3' New Window 4'x 3' Old Window 70" x 29 1/4" Old Window 70" x 29 1/4" Bedroom Bedroom Cofair Tite Seal Window Flashing on all windows. Bath 34"-_- Kitchen New Window 2'x 3' Entry New Window 3'x 3' New Window 5' x 3' �— Old Window 5' x 3' 14' Living Room Dining Room New Window 4'x 3' New Window 3' x 3' Original Window 8'x 43" Original Window 46" x 43 1/4" 24.5' BUILDING PLANNING Exception: Basements used only to house mechanical to R310.1.3, and such devices shall be releasable or remov- equipment and not exceeding total floor area of 200 square able from the inside without the use of a key, tool, special feet(18.58 m2). knowledge or force greater than that which is required for R310.1.1 Minimum opening area.All emergency escape normal operation of the escape and rescue opening. The and rescue openings shall have a minimum net clear open- release mechanism shall be maintained operable at all times. ing of 5.7 square feet(0.530 rn). Such bars, grills, grates or any similar devices shall be Exception: Grade floor openings shall have a mini- equipped with an approved exterior release device for use by mum net clear opening of 5 square feet(0.465 m). the,fire department only when required by the authority hav- R310.1.2 Minimum opening height. The minimum net ing jurisdiction. clear opening height shall be 24 inches(610 mm). Where security bars(burglar bars)are installed on emer- gency egress and rescue windows or doors,on or after July 1, R310.1.3 Minimum opening width. The minimum net 2000, such devices shall comply with California Building clear opening width shall be 20 inches(508 mm). Standards Code,Part 12, Chapter 12-3 and other applicable R310.1.4 Operational constraints. Emergency escape provisions of this code. and rescue openings shall be maintained free of any obstructions other than those allowed by this section and shall be operational from the inside of the room without SECTION R311 the use of keys,tools or special knowledge. MEANS OF EGRESS R310.2 Window wells.The minimum horizontal area of the R311.1 Means of egress. All dwellings shall be provided window well shall be 9 square feet(0.9 m'),with a minimum with a means of egress as provided in this section.The means horizontal projection and width of 36 inches (914 man). The of egress shall provide a continuous and unobstructed path of area of the window well shall allow the emergency escape vertical and horizontal egress travel from all portions of the and rescue opening to be fully opened. dwelling to the exterior of the dwelling at the required egress Exception: The ladder or steps required by Section door without requiring travel through a garage. R310.2.1 shall be permitted to encroach a maximum of 6 R311.2 Egress door. At least one egress door shall be pro- inches(152 mm)into the required dimensions of the win- vided for each dwelling unit. The egress door shall be side- dow well. hinged,and shall provide a minimum clear width of 32 inches R310.2.1 Ladder and steps. Window wells with a verti- (813 mm) when measured between the face of the door and cal depth greater than 44 inches (1118 rum) shall be the stop,with the door open 90 degrees(1.57 rad).The mini- equipped with a permanently affixed ladder or steps usable mum clear height m the door opening shall not a less than with the window in the fully open position. Ladders or threshold inches (19h 1 rum)in height measured from the top o the be steps required by this section shall not be required to com- U quire d to the bottom of the stop. Other doors shall not Egress ply with Sections R311.7 and R311.8. Ladders or rungs required to comply with these minimum dimensions. Egress shall have an inside width of at least 12 inches (305 rum), doors shall be readily operable from inside the dwelling shall project at least 3 inches (76 rum)from the wall and Without the use of a key or special knowledge or effort. shall be spaced not more than 18 inches(457 rum)on cen- R311.3 Floors and landings at exterior doors.There shall ter vertically for the full height of the window well. be a landing or floor on each side of each exterior door.The R310.2 2 Drainage Window wells shall be designed for Width of each landing shall not be less than the door served. the building's foundation Every landing shall have a minimum dimension of 36 inches proper drainage by connecting to drainage system required by Section Ring's or foundation an (914 rum)measured in the direction of travel. Exterior land- ings shall be permitted to have a slope not to exceed %unit approved alternative method. vertical in 12 units horizontal(2-percent). Exception: A drainage system for window wells is not ,Exception:Exterior balconies less than 60 square feet(5.6 required when the foundation is on well-drained soil or m2)and only accessible from a door are permitted to have sand-gravel mixture soils according to the United Soil a landing less than 36 inches (914 mm) measured in the Table 405.R Classification n System, Group I Soils, as detailed in direction of travel. Table R310.3 Bulkhead enclosures. Bulkhead enclosures shall R311.3.1 Floor elevations at the required egress doors. provide direct access to the basement. The bulkhead enclo- Landings or finished floors at the required egress door sure with the door panels in the fully open position shall pro- shall not be more than 1 /z inches(38 mm)lower than the vide the minimum net clear opening required by Section top of the threshold. R310.1.1. Bulkhead enclosures shall also comply with Sec- Exception: The landing or floor on the exterior side tion R311.7.10.2. shall not be more than 7%inches (196 mm)below the R310.4 Bars,grilles,covers and screens.Bars,grilles,cov- top of the threshold provided the door does not swing ers,screens or similar devices are permitted to be placed over over the landing or floor. emergency escape and rescue openings,bulkhead enclosures, Where exterior landings or floors serving the required or window wells that serve such openings,provided the mini- egress door are not at grade, they shall be provided with mum net clear opening size complies with Sections R310.1.1 access to grade by means of a ramp in accordance with 76 2013 CALIFORNIA RESIDENTIAL CODE DINSTALLATIONELI EN INSTRUCTIONS WINDOWS & DOORS for Vinyl Windows with Integral Nailing Fin (JI1001) F Thank you for selecting JELD-WEN products.Attached are JELD-WEN's _,— - recommended installation instructions for Vinyl windows with an integral nailing fin.While the use of these installation instructions is recommended, kal�' installation in strict compliance with AAMA specifications(2400.02)is an `S f, 'L alternate method of window installation.Use of theAAMAspecifications (2400-02)will not affect application of the JELD-WEN limited warranty. J 4k1 Arlie 16 Newer construction methods have led to an increase In air and water r I - tightness in buildings.This frequently leads to negative air pressure inside the home,which can draw water through very small openings. Our installation method integrates the window with the weather ti— "`- barrier of the structure(typically building wrap). IMPORTANT INFORMATION & GLOSSARY Not all window types may be installed into every wall condition in all areas.Consult your local building code official for applicable building Buck codes and regulations.Local building code requirements supersede A„good framework attached to the masonry inside a window or patio recommended installation instructions. door rough opening. Please Notel Installations where the sill is higher than 35 feet above Mull Joint ground level,or any product installation into a wall condition not specifically addressed in these instructions,must be designed by an The joint where two or more window units are structurally joined architect or structural engineer.Failure to install windows into square, together. level,and plumb openings could result in denial of warranty claims for Mulled Unit operational or performance problems. Two or more window units structurally joined together. Note to Installer:Provide a copy of these instructions to the building Precast Sill owner.By installing this product,you acknowledge the terms and A pre-formed concrete block placed in the sill of a masonry/block wall to conditions of the limited product warranty as part of the terms of the support a window. sale. Shiplap The layering method in which each layer overlaps the layer below it so that water runs down the outside. Estimated Install �f,nt Tme aohr. Weep Hole(weep channel) Time for New rxperlemed z s n O The visible exit or entry part of a water drainage system used to drain Construction - water out of a window. Rotesslonal 1 5 h ROUGH OPENINGS - This installation guide specifically addresses masonry/block wall, • a sheathed wall and open-stud construction. The wall framing must be - - - OT RUIM771° OR • my M 11 • covered by backing support .�Sheatded Wall _ This installation assumes that - before the window can be t:���" Header a framework of studs(often _ installed.The window will be called a buck)has already been II y ; `'� mounted with the nailing fin/ properly fastened and sealed to 4 � y exterior trim flush against the ` the concretelmason wall b a *k applied backing support. King - Trimmer 1 building professional. y ' stutl studs Buck ' This backing support should be a — Sheathing non water-degradable,thin(max. 1B"thick)sheet material such as vinyl sheeting.Completely surround the rough opening with SHEATHEDFULLY WALL CONSTRUCTIONthe backing support.Backing support must be applied before building The wall framing is covered by sheathing.Windows will be mounted wrap. flush against the sheathing.This installation assumes building wrap is properly installed prior to installation. RELIABILITY for real life' IF JELDrWEN INSTALLATION INSTRUCTIONS wI N D Ows & DOOR$ for Vinyl Windows with Integral Nailing Fin(111001) SAFETY& HANDLING WINDOWMATERIALS AND • Read and fully understand ALL manufacturers'instructions before • Make sure operable windows are locked prior to installation. beginning. • Heed material manufacturers'handling and application instructions. • Do not work alone.Two or more people are required.Use safe lifting • Protect adhesive surfaces from dirt,moisture,direct sunlight and techniques. folding over onto themselves. • Use caution when handling glass.Broken or cracked glass can cause • Handle in vertical position;do not carry flat or drag on floor. serious injury. •Wear protective gear(e.g.safety glasses,gloves,ear protection,etc.). • o not put stress on joints,corners or frames. S • S • Operate hand/power tools safely and follow manufacturer's operating tore window in dry,well-ventilated area in vertical,leaning position to allow air circulation;do not stack horizontally. instructions. • Use caution when working at elevated heights. • Protect from exposure to direct sunlight during storage. • Install only into vertical walls and when conditions and sheathing are dry. NEEDED MATERIALS&TOOLS Notel Follow all material manufacturers'instructions for proper use • Utility knife and compatibility. •J-roller • 1 3/4'galvanized roofing nails.Nails must penetrate at least 1" into . Hammer framing(or as required by local code) • For mulled and/or OP50 or above units:810 x 1 112"truss head or •Tape measure washer head(stainless steel recommended)screws.Screws must • Caulking gun penetrate at least 1" into framing(or as required by local code)) • Construction stapler with 318"staples • Sealant(Protecto Wrap Protecto Sealant 25XL or equivalent) • Level W minimum recommended) • Backer rod • Drill with bits • Polyurethane low expansion foam(Dow Great Stuff'""Window and --Door--or-equivalent)- - Shims—not water degradable or compressible For installations into a stud-framed wall: • JELD-WEN 4"drain mat material or equivalent •JELD-WEN 4"wide self adhesive flashing or equivalent,6"for windows rated above DP50(9" if required by local code) • Spray adhesive/primer(Protecto Wrap Safseal Systems 5500 or as recommended by the self-adhesive flashing manufacturer) For installations into a buck: • Liquid applied flashing(Protecto Wrap LWM 200 or equivalent) 2 RELIABILITY for real life' JELIr-WEN INSTALLATION INSTRUCTIONS WINDOWS & DOORS for Vinyl Windows with Integral Nailing Fin(JI1001) I��tvj�bl I�'L'•Va`i�u�16 _1YrS��CI 1rd�F�loovgV�- - - •I • For side-by-side mulled units,a drip cap that extends the length of the Remove shipping materials such as corner covers,shipping blocks or frame plus 1/8"overhang on each end is required. pads.If there is a protective film on the glass,do not remove it until • Splits,cracks,holes,missing sections or other damage to the nailing installation and construction are complete. fin longer than 6"and/or within 112"of window frame INIM•• If any of the above conditions represent a concern,or if you expect environmental conditions to exceed the window's performance rating, •Cosmetic damage do not install the window.Contact your dealer or distributor for • Product squareness(diagonal measurements not more than 114" recommendations. different) • Correct product(size,color,grid pattern,handing,glazing,energy- efficiency requirements,etc.) • Cracked frame welds ,Ajar 1 © U l GD m:l`+1l�S,_ • Verify the width and height •Verify the rough opening is level and plumb(C)and(D).The of the window are each 12'- verify square,Level;&Plumb maximum allowable deviation is 1/16"for every T of rough opening 5/8'smaller than the rough (not to exceed`I/I opening width and height. _ •The rough opening sill must not be crowned or sagged(D). Mulled units should be 3/4" •The exterior face of the rough opening must be in a single plane(E) narrower. A - _ with less than 1/8"twist from corner to corner. •Verify the rough opening I0 e.. • Minimum double studs(king and jack/trimmer)should be used to is square.The(A)and(B) C - -measurements above should support the header at all rough openings. I be the same.Maximum allowable deviation from D square is 1/8"for windows e - _ - 20 sq.ft.and smaller,and 1 1/4"for windows larger than O - 20 sq.ft. tm U C<:� 4 k" { Notel This section applies to 3.If installing into a four-sided buck,seal the sill in a similar manner. installations into a masonry i Note!Shims must be 1/4•shorter than the depth of the window sill, wall only.For installations should level the rough opening sill and be no mare than 1/4"thick Into a stud-framed wall,begin i Liga' with section 4,"PREPARE flashied ng 4.Shim the sill 4'from each corner,at 8"intervals,and on both sides of mull joints with non water-degradable or compressible shims.Secure STUD-FRAMED WALL." I shims with sealant.SKIP to section 5,"INSTALL WINDOW." 1.Seal any joint larger than c _ 1/16"in the buck and f` '' Sealant between the buck and the joints concrete/masonry with sealant 2.Cover the buck and the 4__ - - surrounding concrete/ masonry at the head and jambs with liquid applied flashing as shown. 3 RELIABILITY for real life JELBrWEN INSTALLATION INSTRUCTIONS WINDOWS a DOORS for Vinyl Windows with Integral Nailing Fin 0II001) FOR RETROFIT INSTALLATIONS 2.Cut piece drain mat the (" length of the sill plus 6 I +'Width of After removing the old window,remove sufficient siding to expose h opening (6- enough intact building wrap to properly seal the window to the 3.Without cutting the drain rough p 9 mat material,remove 3 opening.If damaged,apply new building wrap in shiplap manner. of Verify the rough opening framing is structurally sound.Continue with the foam wedge from each the instructions. end of the IELD-WEN dram ` mat. PREPARE BUILrING WRAP 4.Place drain mat on rough opening sill,wrapping the Note!Check with the building - Release � � '_„ _ drain mat up 3"on each wrap manufacturer to verify ",.-P jamb as shown. _ tape the following steps will not D ,, S wicking void their product warranty. { S.Lift up the back of the Follow manufacturers' wicking and staple into place on the sill. instructions. ,' ! Foam 1.Trim building wrap flush 6.Pull release tape and set a wedge IELD-WEN drain mat into 3- with the rough opening. - _ l place. 2.At the head,cut building 7.Fold the drain mat down wrap at 45"and tape up as onto the sheathing.Staple j shown. r �- ;] drain mat to the wall and i seal the corner edges as 1 Shown. Wicking Release 8.For additional drainage for tape 1.Measure the width of the - windows rated above DP50, frame from the interior to �� Interior ;1 cut a 2"wide strip of drain - the nail fin and add 118". t"y mat and apply vertically ti. beneath the drain mat at seal Transfer this measurment t o 5. 12"Intervals. comers ll from the outride edge of , the rough opening sill and 9.Smooth out any bubbles or draw a line all along the creases with a J-roller. 1 rough opening sill.This 9, Measure Note!Do not trim the back _ I frame Drain mat is where the back of the 'r width dam of the drain mat - strips(above JELD-WEN drain mat will sit F_ - ._ ;„ DP50 only) I © INSTALL WINDOW WARNINGI To avoid injury,use at least two people to install. 3.Shim side jambs on both - Adequately support the window until completely fastened. sides just above interlock Notel For units rated above DPSO,run a continuous 3/8"bead of and evenly spaced no more 6" ".. Interlock sealant around the interior side of the nail fin where it will contact the than 8"apart.Secure shims rough opening. with sealant. 'sj 8• 1.Place windowsill onto the _ 4.Inspect window for square or o— �= drain matAiquid applied level,and plumb.Test for " flashing and tilt into the proper operation(remove - center rough opening.The window I and reinstall if necessary) j sill must rest on and be fully 3--7- supported by the rough opening- 2.Fasten window with a ` galvanized roofing nail r through the nailing fin between 3"-7"from one ;.,_„ ;r. :.ems, Jamb `___ t-- lower corner. I Rough opening Interior -I _ I Shim 1/4'Sealant) gap 4 RELIABILITY for real life M JE1 LDrWEN INSTALLATION INSTRUCTIONS w r rr n o ws a nooses for Vinyl Windows with Integral Nailing Fin(111001) ® INSTALL WINDOWCONTINUED • For DP50 OR ABOVE Tilt Hung Windows or Flat Casing Double-Hung Jamb 4 0 Notel Fastener heads must be flush.Do not dent nailing fin.The first Windows ONLY caraway from TOP 12"beyond mull joints,on both sides,must be fastened through each From the interior,just above o nail fin hole with#10 x 1 1/2"truss head screws. the interlock(where the ` 3/8' clearance^ n -< sashes meet at center),align ; hole o-x �-4' 4'-s{s-4"-+ pig x 7 12'Truss head screw with shims and drill a 3/8" ffig', 0 0 0 0 0 =,dowN clearance hole through ONLYthe first wall of the interiorWingjamb(as shown).This willrvatl allow the screw head to pass o Jamb fin .' Mull joint .I through.Do not drill all the way through the jamb into the j Exterior Fasten window through the rough opening. I " - nailing fin holes 3"-7"from the corners and 8"apart all - 3'-7• the way around the window. For All DP50 OR ABOVE Windows , I8. Fasten window through each nailing fin hole(every 4"). i - f FLASH WINDOW-WINDOWS INSTALLED INTO STUD-FRAMING ONLY Cut pieces of self-adhesive flashing as follows: _ 1.If installing a window rated above DP50,center DP50 or below Above DP50 (4'flashing) (6"flashing) and apply 6'wide flashing below the sill. One header piece 10'longer than the 14'longer than the 2.Apply the side pieces Flashing header header starting 2'above the header J Two side pieces 7" longer than the 10" longer than the and overlap the drain mat jamb jamb on the sill as shown. One sill piece N/A 6" longer than the 3.Center and apply the header p g sill piece above the header, Drain mat overlapping the side pieces as shown. - 4.Press the flashing down with Apply spray adhesive(protect _ .c a J-roller,being careful to L window from overspray)to #'r"f iJ remove any gaps or bubbles nailing fin and building wrap 1 :� beneath self-adhesive - around the window as shown. _ flashing(remove and I r, - ' ,a replace if necessary). i R Z' r I :S Notel Keep the edge of the JELD-WEN self-adhesive flashing as close to - - the window frame as possible and apply over the nail fin. J 5 RELIABILITY for real life JELDrWEN INSTALLATION INSTRUCTIONS WINDOWS A DOORS for Vinyl Windows with Integral Nailing Fin(111001) ® COMPLETE INSTALLATION 1.Release the building wrap AFTER INSTALLATION from above the header -< (previously taped up) ') _ Sealant _ • Install exterior wall surface within 30 days of window installation. and overlap the header • Maintain gap of 1/4'-3/8' between window frame and final exterior flashing.Seal the ends with wall surface.No expansion/contraction joint is needed for integral self-adhesive flashing or 3 ? 1-channel Windows installed into a structure with aluminum or vinyl building wrap tape. f siding. 2.Adjust window for best Protect recently installed units from damage from plaster,paint,etc. operation. f Ll by covering the unit with plastic. 3.Seal the top corners of the Ilf f.d 1 window with a 1/4' bead of sealant.Tool into a fillet shape. 4.Create a continuous air seal on the interior by integrating the rough opening and the window frame with low expansion polyurethane foam or backer rod and sealant.If installing into wood framing with a drain mat,apply sealant to the foam wedge on the back of the drain mat,integrating the back of the drain mat with the window frame. 5.Ensure weep holes/channels are clear of debris for proper water drainage.Do not seal weep holes/channels. Please visit jeld-wen.com/resources for warranty and care and maintenance information. Thank you for choosing JELBrWEN• RS O 100a JELD-WEN,Inc I JELD-WEN and Reliability formal life are registered trademarks of JELD-WEN,Inc,Oregon USA (12/08) All other trademarks are the property of their respec0m owners. {�{� 6 RELIABILITY for real life' ■o-