Loading...
PMT16-04339 ��l A E 16 — 6 ct S 3C) ROUGH GRADE CERTIFICATION CITY OF MENIFEE The City of Menifee requires a licensed Professional Engineer to submit a wet signed and stamped rough grading certification prior to the issuance of a building permit. Project Description: RG Lots 308-311 &319-L22;TR Map Lots 192-195&203-206 ract No. 34406-4 Project Address: Permit No. GP 09-031 1 hereby approve the rough grading for the above referenced project in accordance with my responsibilities under California Building Code Appendix "J" and Riverside County Ordinance No. 457, 1 confirm that the site has been graded in accordance with the approved grading plan including location of property corners for proper building location, completion of retaining walls, location and slope ratio for all manufactured slopes, construction of earth berms, installation of all drainage devices shown on the approved grading plans, location and elevation of building pads and positive building pad drainage. The placement of the building pad and the pad elevation as shown below are in conformance with the grading plans as approved by the City of Menifee. The building pad is suitable for building construction as related to the preceding items and conforms to the standards of care for grading practices and tolerances. A field inspection has been performed and the pad has been graded to be in conformance With the plans as follows: L Rough Grading Tract Map Approved As-built Elevation Lot No. Lot No. Plan Elevation—— I 192 1463.3 14 3!61 309 193 1463.6 63 1 310 194 1463.8 1463.8 1 311 195 1464.1 1464.1 319 203 1464.0 1 464.0 320 204 1AA1 A 321 205 1463.6 322 �nn I TV Any deviation of more than plus or minus 0.1 ft must be justified by the Engineer-of-Record. Company: MDS Consultin_q Address: 17320 Redhill Avenue, Suite 350 Irvine, CA 92614 �!FESS/0, Phone: 949-251-8821 $51 Cn Enginee No. 052496 0 Name: Ed Lenth u0jr Exp. 12-31-18 CIVIL RCE: 52496 Exp. Date 12-31-18 OF CAL. ture Signa �� ..Date 5-31-17 G:\025\40�mr-ArgRE-�erif 34406-4 F1,12 308-311_319.322.d.� An -r ( 6 — (5 WO NA HOURS Geotechnical CoasL ieologic Environmental FOOTING TRENCH OBSERVATION SUMMARY Client Name: LAI A;�:tA �e Project Name: Location/Tract: L�,, d 14,,I� ::U2 34t&G- Unit/Phase/Lot(s): I&tS Referenced Geotechnical Report(s): Observation Summary Initials A representative of GeoSoils,Inc.observed onsite soil and footing trench conditions. Soil conditions Date in the trench are generally free of loose soil and debris, non-yielding and uniform,and plumb; and 0 are in general Conformance with those indicated in the geoterhnicall report, Initials A representative of GeoSoils, Inc. observed and reviewed footing excavation depth/width. Footing 5 Date excavations generally extend to proper depth and bearing strata, and are in general conformance with recommendations of the geotechnical report. I Initials A representative of GeoSolls, Inc. reviewed footing setbacks from slope face (if applicable). The Date setback was in general accordance with the recommendations of the geotechnical report. Initials Date Notes to Superintendent/Foreman Footing excavations should be cleaned of loose debris andthoroughly moistened just priorto placing concrete. 2. Basedon expansion potential of underlying soils,presoakingof soil belowslabs may be recommended. Consult the geotechnical report for presoaking recommendations. We note that clayey soils may take an extended period of time for such, and the contractor should schedule accordingly. 3. In the event of a site change subsequent to our footing observation and prior to concrete placement(i.e.,heavy rain, etc.), we should be contacted to perform additional site observations and/or testing. 4. This memo does not confirm the minimum footing dimension as required by the project structural engineer's design, if different from the geotechnical report. Notes to Building Inspector Soil compaction test results,as well as depth of fill, relative compaction, bear' g values,c rosivity,and soil expansion 0 indextestr bl d in the As-Graded Geotechnical or Final Compacti R ort provided at the completion of grading UV i�eprasentative of GeSSoils, Inc. , Palmer Way 1446 E.Chestnut Ave. 26590 Madison Ave. Carlsbad.CA 92008 Santa Ana,CA 92701 Murfleta,CA 92562 (760)438-3155 (714)647-0277 (951)677-9651 IF— 1 M D S 6 q-739 0 L I I N 0 L A N N 1 2 5 E N G I N E E R 5 U A V E Y 0 R pro() - C7 00i I...I.d r. FIELD VERIFICATION MEMO d t.QW.I. DATE: JOB NO.: TO: PROJECT: SUBJECT AREA: PLAN TYPE: LAST REVISION DATE: PREPARED BY: MDS CONSULTING OTHER: F-1 We have checked the above referenced area and find it to be in substantial conformance with the above referenced plan. F1 We have checked the above referenced area and find it to be in substantial conformance with the above referenced plan, with the following exceptions: MDS CONSULTING FIELD REPRESENTATIVE Stanley C.Mama 17320 R.d I A�.��. VOICE' 949-251 8821 Gary W.Dalcigh S.il.350 FAX: 949-2SI-0516 J.R.'Skip"Schultz 1—n.,CA:i�'61 EMAtt.