Loading...
PMT16-03093 City of Menifee Permit No.: PMT16-03093 29714 HAUN RD. Type: Residential Electrical "�A-CCIELJS,> MENIFEE, CA 92586 MENIFEE Date Issued: 11/01/2016 P E R M I T Site Address: 31813 RUXTON ST, MENIFEE, CA 92584 Parcel Number: 360-592-037 Construction Cost: $23,184.00 Existing Use: Proposed Use: Description of INSTAL 4.83 KW PV- 14 AC MODULES W/BUILT-IN INVERTERS Work: Owner Contractor KRYSTA REHM SUNPOWER CORPORATION SYSTEMS 31813 RUXTON ST 77 RIO ROBLES MENIFEE, CA 92584 SAN JOSE, CA 95134 Applicant Phone:9417203850 REBECCA HALE License Number 890895 77 RIO ROBLES SAN JOSE, CA 95134 Fee Description Qtv Amount Solar, Residential or Small Commercial 1 252.00 Building Permit Issuance 1 27.00 Additional Plan Review Electrical 158 157.50 GREEN FEE 1 1.00 SMIP RESIDENTIAL 1 4.00 General Plan Maintenance Fee-Electrical 1 12.60 $454.10 The issuance of this permit shall not prevent the building official from thereafter requiring the correction of errors in the plans and specifications or from preventing builiding operations being carded on thereunder when in violation of the Building Code or of any other ordinance of City of Menifee.Except as otherwise stated,a permit for construction under which no work is commenced within six months after issuance,or where the work commenced is suspended or abandoned for six months,shall expire,and fees paid shall be forfeited. AkBidgPennit-Terniplate.rpt Page I of 1 CITY OF MENIFEE LICENSED DECLARATION property who builds or improves thereon,and who contracts for the projects I hereby affirm under penalty of perjury that I am under provisions of with a licensed contmctor(s)pursuant to the Contractors State License Law). Chapter9(commencing with section 7000)of Division 3 of the Business and a I am exem pt from ficensure under the Contractor's State License Law for Professions Code and my license is in full force and effect. the following reason: License ClassC10406(110 LicenseNo- 9C�O�V4��­Bv my signature below I acknowledge that,except for my personal residence Expires-OLIA412/1-/Shmature in which I must have resided for at least one year prior to completion of improvements covered by this permit.I cannot legally sell a structure that I WORKEWS COMPENSATION DECLARATjjV have built as an owner-builder if it has not been constructed in its entirety by ci I hereby affirm under penalty of pdroill�y one of the following declarations:I licensed contractors.I understand that a copy of the applicable law,Section have and will maintain a certificate of consent of self-insure for worker's 7044 of the Busin ess and Professions Code,is available upon request when com pensation,Issued by the Director of Inclustria I Relations as provided for this application is submitted or at the following website: by Section 3700 of the Labor Code,for the performance of work for which this permit is issued. www.leRInfo.ca.gov/calaw.htm1. Policy# Date c�(Ihave and will maintain worker's compensation insurance,as required by PROPERTY OWNER OR AUTHORIZED AGENT section 3700 of the Labor Code,for the performance of the work for which a By my signature below I certify to each of the following:I a in the property this permit Is issued.My worker's compensation insurance carrier and policy owner or authorized to act on the property owner's beha If.I have read this number are: application and the information I have provided is correct.I agree to comply with all applicable city and county ordinances and state laws relating to Carrier AIH6910-ml �URICII building construction.I authorize representatives of this city or county to Policy# WL!22q?730 —Expires_ I I /I /1—7 enter the above identified property for inspection purposes. (This section need not to be completed is the permit is for one-hundred Date dollars($100)or less PROPERTY OWNER OR AUTHORIZED AGENT a I certify that in the performance of the work for which this permit is issued, I shall not employ any persons in any manner so as to become subject to the CITY BUSINESS LICENSE# worker's compensation laws of California,and agree that if I should become HAZARDOUS MATERIAL DECLARAMON subject to the worker's compensation provis ons of Section 3700 of the Labor Code,I shall Lojjbuyith Will the applicant or future building occupant handle hazardous material or a A R t OIAJOVIG mixture containing a hazardous material equal to or greater that the amounts specified on the Hazardous Materials Information Guide? WARNINWfALeRE TO S96-H&ORKER'S COMPENSATION COVERAGE 15 oYes oNo UNLAWFUL,AND SHALL SUBJECT AN EMPLOYER TO CRIMINAL PENALTIES Will the intended use of the building by the applicant or future building AND CIVI L FINES UP TO ONE HUNDRED THOUSAND DOLLARS($100,000),IN occupant require a permit for the construction or modification from South ADDITION TO THE COST OF COMPENSATION,DAMAGES AS PROVIDED FOR Coast Air Quality Management District(SCAQMD)?See permitting checklist IN SECTION 3706 OF THE LABOR CODE,INTEREST,AND ATTORN EYS FEES forguidelines CONSTRUCrION LENDING AGENCY a Yes a No I hereby affirm that under the pena Ity,of perjury there is a construction Will the proposed building or modified facility be within 1000 feet of the lending agency for the performance of the work which this permit is issued outer boundary of a school? (Section 3097 Civil Code) uYes ciNo OWNER BUILDER DECLARATIONS I have read the Hazardous Material Information Guide and the SCAQMD permitting checklist.I understand my requirements under the State of I hereby affirm under penalty of perjury that I am exempt from the California Health&Safety Code,Section 25505 and 25534 concerning Contractor's License Law for the reason(s)indicated below by the hazardous material reporting. checkmark(s)I have placed next to the applicable item(s)(Section 7031.5 Dyes a No Business and Professions Code).Any city or county that requires a permit to Date construct,alter,improve,demolish or repair any structure,prior to its PROPERTY OWNER OR AUTHORIZED AGE�T­— issuance,also requires the applicant for the permit to file a signed statement that he or she is licensed pursuant to the provisions of the Contractor's State EPA RENOVATION,REPAIR AND PAINTING IRRIP) License Law(Chapter 9(commencing with Section 7000)of Division 3 of the The EPA Renovation,Repair and Painting(RRP)Rule requires contractors Business and Professions Code)or that he or she is exempt from licensure receiving compensation for most work that disturbs paint in a pre-2978 and the basis for the alleged exemption.Any violafion of Section 7031.5 by residence or childca re facility to be RRP-certified firms and com ply with an Applicant for a permit subjects the applicant to a civil Pena Ity of not more required practices.This includes rental property owners and property than($500). managers who do the paint-disturbing workthemselves orthrough their o 1,as owner of the property,or my employee with wages as their sale employees.For more information about EPA's Renovation Program visit: compensation,will do I )all of or I )portion of the work,and the structure is www.epa.gov/lead or contact the National Lead Information Center at not intended or offered for sale.(Section 7044,Business and Professions 1-800-424-LEAD(5323). Code,The Contractor's State Urcense Law does not apply to an owner of a ci An EPA Lead-Safe Certified Renovator will be responsible for this project property who,through employees'or personal effort,builds or improves the property provided that the Improvements am not intended or offered for Certified Firm Name: sa le.If,however,the building or improvement is sold within one year of Firm Certification No.; completion,the Owner-Elullder will have the burden of proving that It was not built or improved for the purpose of sale. u No EPA Lead-Safe Certified Firm is required for this project because: o 1,as owner of the property am exclusively contracting with licensed contractors to construct the project(Section 7044,Business a nd Professions Code:The Contractor's State License Law does not apply to an owner of a If your project does not comply with EPA RRP rule please fill out the RRP Acknowledgement. structural October 4,2016 ENGINEERS City of Menitee SunPower Corporation ElUilding & Safety Dept. 77 Rio Robles San Jose,CA,95134 OCT 2 0 2016 Subject:Structural Certification for Installation of Solar Panels Job Number:16-13916 R()Celvad Client: Krysta Rehm-RP-02114 Address:31813 Ruxton Street,Menifee,CA 92584 Attn.:To Whom It May Concern A field observation of the condition of the existing framing system was performed by an audit team from SunPower Corporation. From the field observation of the property,the existing roof structure was observed as follows: The existing roof structure consists of: Concrete'Flat'or'S'Tile over Roof Plywood is supported by 2x4 @ 24"o.c.DF#2 at ARRAY 1.The top chords are sloped at approximately 18 degree and have a maximum projected horizontal span of 7 ft 7 in between load bearing walls. Design Criteria: • Applicable Codes=2013 CBC,ASCE 7-10,and NDS-12 • Ground Snow Load=0 psf • Roof Snow Load=0 psf ARRAY I • Roof Dead Load=13.7 psf ARRAY I • Basic Wind Speed=110 mph Exposure Category C As a result of the completed field observation and design checks: ARRAY 1:it is adequate to support the loading imposed by the installation of solar panels and modules.Therefore,no structural upgrades are required. I certify that the capacity of the structural roof framing that directly supports the additional gravity loading due to the solar panel supports and modules had been reviewed and determined to meet or exceed the requirements without structural upgrade in accordance with the 2013 CBC. V�LOFES 10,V, If you have any questions on the above,do not hesitate to call. TH Prepared By: P7SE,Inc.-Structural Engineers Roseville,CA )60 U'C__T 8150 Sierra College Boulevard,Suite 150, Roseville, CA 95661 T 916.961.3960 F 916.961.3965 1,N www.pzse.com Experience I Integrity I Enipc),,,,emient strue October 4,2016 E SunPower Corporation 77 Rio Robles San Jose,CA 95134 Attn.:To Whom It May Concern re:Job 16-13916 : Krysta Rehm- RP-02114 The following calculations are for the structural engineering design of the photovoltaic panels located at 31813 Ruxton Street, Menifee, CA 92584.After review, PZSE, Inc. certifies that the roof structure has sufficient structural capacity for the applied PV loads. If you have any questions on the above, do not hesitate to call. FESSt, NEFH Prepared By: PZSE, Inc.-Structural Engineers N.S3878 Roseville, CA ExP3.31.17 169 1. U lee OF C 8150 Sierra College Boulevard,Suite 150, Roseville, CA 95661 T 916.961.3960 F 916.961.3965 I/V www.pzse.com Expe-Hence I Integrity I Empowerment Project: Customer Name—Job#: 16-13916 Date: 10/4/2016 Engineer: WL Gravity Loading Roof Snow Load Calculations po=Ground Snow Load PSI` C.a Exposure Factor= 0.9 (ASCE7-Table 7-2) C,=Thermal Factor= 1.1 (ASCE7-Table 7-3) 1=Importance Factor= 1 pf=0.7 C.C,I p, Psf (ASCE7-Eq 7-1) where p,!;20 psf,Pf min=I x pg= N/A where p,>20 psf,P,min=20 x I= N/A Per ASCE 7-10,minimum values of Pf shall apply to hip and gable roofs with slopes less than 15-. Therefore, pf=Flat Roof Snow Load psf p�=C�PF (ASCE7-Eq 7-2) Cs=Slope Factor 1.000 ARRAY I Ps=Sloped Roof Snow Load 0.0 P5f ARRAY 1 PV Dead Load 3 psf(Per SunPower Corporation) Roof Live Load 20.00 Psf ARRAY 1 Note:Roof live load is removed in area's covered by PV array. Roof Dead Load ARRAY 1 Concrete'Flat'or'S'Tlle 10.00 Roof Plywood 1.50 2x4 Top Chords @ 24"o.c. 0.57 Vaulted Ceiling 0.00 (Ceiling Not Vaulted) Miscellaneous 0.93 Total Roof DL ARRAY 1 13.0 psf DL Adjusted to 18 Degree Slope 13.7 psf 2 of 5 Project: Customer Name-Job#: 16-13916 Date: 10/4/2016 Engineer: WL Wind Calculations Per ASCE 7-10 Components and Cladding Input Variables Wind Speed 110 mph Exposure Category C RoofShape Gable/Hip Roof Slope 18 degrees Mean Roof Height 20ft Building Least Width 45 ft Effective Wind Area 15.5 sf Roof Zone Edge Distance,a 4.5 ft Design Wind Pressure Calculations Wind Pressure P=qh*(G*Cp) qh=0,00256*Kz*Kzt* Kd*VA2 (Eq.30.3-1) Kz(Exposure Coefficient) 0.9 (Table 30.3-1) Kzt(topographic factor) 1 (Fig.26.8-1) Kd(Wind Directionality Factor) 0.85 (Table 26.6-1) V(Design Wind Speed) 110 mph (Fig.26.5-1A) Risk Category 11 (Table 1.5-1) qh= 23.7 psf 0.6*qh= 14.22 Standoff Uplift Calculations Zone I Zone 2 Zone 3 Positive GCp= -0.89 -1.67 -2.56 0.49 Uplift Pressure= -12.71 psf -23.74 psf -36.45 psf 6.94 psf Attachment Dead Load= 3.00 psf 3.00 psf 3.00 psf Max Rail Span Length= 6.00ft 6.00 ft 6.00 ft Longitudinal Length= 2.58 ft 2.58 ft 2.58 ft Attachment Tributary Area= 15.50 sf 15.50 sf 15.50 sf Footing Uplift= -901b -193 lb -3111b Fastener Capacity Check Fastener= 5/16 inch Number of Fasteners= I Minimum Threaded Embedment Depth= 2.5 Pullout Capacity Per Inch= 2661b Fastener Capacity= 10641b 1064 lb capacity>311 lb demand Therefore,OK 3 of 5 Project: Customer Name--Job M 16-13916 Date: 10/4/2016 Engineer: WL Framing Check ARRAY I PASS w=33 plf Dead Load 13.7 psf PV Load 3.0 psf Live Load 20.0 psf 2x4 Top Chords @ 24"o.c. Member Span=7--7" Governing Load Comb. DL Note:Attachments shall be Staggered. Total Load 16.7 psf Member Properties MemberSlze S(in A 3) 1(in A 4) Lumber Sp/Gr MemberSpacing 2x4 3.06 5.36 DF#2 @ 24"o.c. Check Bending Stress Fb(psi) Vb x Cd x Cf x Cr (NDS Table 4.3.1) 900 x 0.9 x 1.5 x 1.15 Allowed Bending Stress=1397.2 psi Maximum Moment = (wLA2)/8 = 240.091 ft# = 2831.1 in# Actual BendingStress=(Maximum Moment)/S =940.8 psi Allowed>Actual—67.4%Stressed -- Therefore,OK Check Deflection Allowed Deflection(Total Load) L/180 (E 1600000 psi Per NDS) = 0.505 In Deflection Criteria Based on ContinuousSpan Actual Deflection(Total Load) (w*LA4)/(185*E*I) = 0.121 in = L/753 < L/180 Therefore OK Allowed Deflection(Live Load) L/240 0.379 in Actual Deflection(Live Load) (w*LA4)/(185*E*I) 0.050 in L/1820 < L/240 Therefore OK Check Shear Member Area 5.3 inA2 Fv(psi)= 180 psi (NDSTable4A) Allowed Shear = Fv*A 945 lb Max Shear(V)=w L 2 1271b Allowed>Actual 13.5%Stressed — Therefore,OK 4 of 5 Project: Customer Name Job#: 16-13916 Date: 10/4/2016 Engineer: WL Lateral 2013 CBC CH34 Existing Weight of Effected Building Level Area Weight(psf) Weight(lb) Roof 2475sf 13.7 psf 33908 lb Ceiling 2475sf 6.0 psf 14850 lb 7/8"Stucco 1333 sf 11.0 psf 14667 1 b (13.5'Wall Height) Int.Walls 667 sf 6.0 psf 4000 lb Existing Weight of Effected Building 67424 lb Proposed Weight of PV System Weight of PV System(Per SunPower Corporation) 3.0 psf Approx.Area of Proposed PV System 254 sf Approximate Total Weight of PV System 762 lb 10%Comparison 10%of Existing Building Weight(Allowed) 6742 Ib Approximate Weight of PV System(Actual) 762 lb Percentincrease 1.1% 6742 lb>762 lb,Therefore OK 5 of 5 Menifee PMT16-03093 10/27/2016 EsGil Corporation In(Partnership with governmentfor Buirdiny Safety DATE: 10/27/2016 El A��PLICANT U�JLIRIS. JURISDICTION: Menifee El PLAN REVIEWER El FILE PLAN CHECK NO.: PMT16-03093 SET: III PROJECT ADDRESS: 31813 Ruxton Street PROJECT NAME: Rehm 14 AC PV Modules The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's building codes. The plans transmitted herewith will substantially comply with the jurisdiction's building codes when minor deficiencies identified below are resolved and checked by building department staff. The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. The check list transmitted herewith is for your information. The plans are being held at Esgil Corporation until corrected plans are submitted for recheck. The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant contact person. F1 The applicant's copy of the check list has been sent to: Z Esgil Corporation staff did not advise the applicant that the plan check has been completed. F� Esgil Corporation staff did advise the applicant that the plan check has been completed. Person contacted- Telephone Date contacted: (b Fax #: Mail Telephone Fax q1nrson E-mail: REMARKS: By: Morteza Beheshti Enclosures: EsGil Corporation El GA El EJ F-1 PC 10/21 Menifee PMT16-03093 00/29/2016 [DO NOT PAY— THIS IS NOT AN INVOICE] VALUATION AND PLAN CHECK FEE JURISDICTION: Menifee PLAN CHECK NO.: PMT16-03093 PREPARED BY: Eric Jensen DATE: 09/29/2016 BUILDING ADDRESS: 31813 Ruxton Street BUILDING OCCUPANCY: BUILDING I;::; 1 :11!on Reg. 1111 l��,I I E: PORTION ( Sq. Ft.) Multiplier Mod. Air Conditioning Fire Sprinklers TO AL VALUE Jurisdiction Code Irnrif IManual input Bldg.Permit Fee by Ordinance Plan Check Fee by Ordinance Type of Review: Complete Review El Structural Only F-1 Repetitive Fee El Other Hrs. @ Repeats D—Ha!i� I W EsGil Fee =$157-50 Based on hourly rate Comments: Sheet 1 of 1 macvalue.doc+