Loading...
PMT16-02918 City of Menifee Permit No.: PMT16-02918 29714 HAUN RD. Type: Commercial Electrical <A-CCIELA> MENIFEE, CA 92586 MENIFEE Date Issued: 09/08/2016 P E R M I T Site Address: 27159 NEWPORT RD, MENIFEE, CA Parcel Number: 360-050-025 construction cost: $500.00 Existing Use: Proposed Use: Description of TEMP EVENT-THE PUMPKIN PLACE PUMPKIN PATCH CT 2 30'x 30'TENTS Work: INSTALL 200ATEMP POWER POLE FOR PUMPKIN PATCH, ERE Owner Contractor MICHAEL CLEARY 30746 EARLY ROUND DRIVE CANYON LAKE,CA 92587 Applicant License Number., MENIFEE, CA Fee Description Oty Amount Building Permit Issuance 1 27.00 Inspections not specified 129 129.07 Additional Plan Review Building 129 129.07 GREEN FEE 1 1.00 $286.14 The issuance of this permit shall not prevent the building official from thereafter requiring the correction of errors in the plans and specifications or from preventing builiding operations being carried on thereunder when in violation of the Building Code or of any other ordinance of City of Menifee.Except as otherwise stated,a permit for construction under which no work is commenced within six months after issuance,or where the work commenced is suspended or abandoned for six months,shall expire,and fees paid shall be forfeited. Page'I of 1 AA.l31dg_Parrn1t Template.rpt rity ut menifee Ling SCE Pole Building & Safety Dept. CDO SEP 0 1 2016 Received 0 n Rivers APPROVAL de 614ty Fir 0 f the? -OLPartment C) By: ' CD Marshal -Z Co The approval Of 1 11/6 0 . �p d specillca . N permit the viola ,ans an — =1 Installation On,deletion o I Oes not m ss 0 OF any requireme u 1-Ocal Ordinan GmoiFS7 ' Ity accpssiblean Fes.Constm n sh.11 ain Or any z,PrOved by "eXOOSed fo the fin�De Inspe r _U ent. ses Until 7/2112016 2:2759PM 2 &Won& Nader Structural Group CONSULTING ENGINEERS 1150E. Orangethrope, #111A Placentia,Ca 92870 Tel. (714) 993-2412 Fax (714) 993-7289 >.% E-mail: arastegari@sbcglobal.net city Ot tl"nii(.. opt. . & saiety 13uWing SEP 'aceived Project: 30'x3O' TENT CD Pr2ject Address: Newport Rd. & Bradley Rd. C Menifee, CA I C1111 OF MENIFEE a9 BUILDING AND SAFETY DEPARTMENT PLAN APPROVAL REVIEWED B DATE *Approval of these plans shall not be construedto be a pemitfor,oran approval of,any violation of anyprovisions.of the federal,state orcity Project No.: 450-16 regulations and ordinances. This set of approved plans I tonthe .................... jobsite until completion. FESS/Ov Date: B-16-16 R .................... No. 332 REVISION XP. 3/31/18 OF CA0 NAD R E. RAS Af�l P.E. SHEET: JOB NO: 450-16 DATE: 8- 16-16 X c I D n Ln C)OID.ft! I ELEVATION (N.T.S.) xx 30 0 PLAN VIEW TN T S—) 13i x=3V SHEET: '2 - 0 JOB NO: 450-16 DATE: 8-16-16 2'-0 0 c) CORNER POST PLAN INTERMEDIATE POST PLAN 1 " Wide Nylon I Wide Nylon Webbing Strap. Webbing Strap, CORNER POST INTERMEDIATE POST ANCHORAGE DETAILS SHEET: 3 . 0 JOB NO: 450-16 DATE: B-16-16 1 " WIDE NYLON WEBBING STRAP. STEEL EARTH ANCHOR (STAKE) 1 "0 X 42" LONG THROUGH ASPHALT INTO EARTH. ------------------ -------------------- 0 FRAME TENT ALUMINUM LEG >� TYP., AROUND PERIM. 2'-0 4p . j L I NSG SHEET: JOB NO:460-16 TENT DESIGN FOR WIN WIND PARAMETERS Pwd=PS30WA= 14.50 psf A= 1.26 Exposure=C P830= 9.6 Wind Speed 11 Omph 1-1=130, Height=18 ft E:1 Dead Load of Tent+Columns=7psf UPLIFT Total Uplift Pu = Ll'L2.PWIND 13050 lbs Ll= 30 ft Dead Load 6300 lbs L2= 30 ft Net Uplift= 6750 lbs Total Stakes = (2)at each Corner and(1)at each intermediate Distance. = 12 Posts Uplift at Each Post = Total Uplift/total post 423 lbs USE 1"Dia. X 42" Long Stake Anchor (2) AT EACH CORNER POST & (1) AT INTERM.