Loading...
PMT16-02461 City of Menifee Permit No.: PMT16-02461 29714 HAUN RD. T Residential Electrical <ACCELA7 MENIFEE,CA 92586 Type: """ MENIFEE Date Issued: 08/12/2016 PERMIT Site Address: 28655 SAND ISLAND WAY, MENIFEE, CA Parcel Number: 364-131-024 92584 Construction Cost: $20.000.00 Existing Use: Proposed Use: Description of INSTALL ROOF MOUNTED SOLAR SYSTEM, 16 PANELS, 1 INVERTER,4.320 kW Work: Owner Contractor RANDALL SCHEAFFER W C HEATING&AIR CONDITIONING INC 28655 SAND ISLAND WAY 41085 GOLDEN GATE CIR MENIFEE, CA 92584 MURRIETA, CA 92562 Applicant Phone:9516000700 JACOB MENDENHALL License Number..779604 41085 GOLDEN GATE CIR MURRIETA, CA 92562 Fee Description ON Amount 151 Solar, Residential or Small Commercial 1 252.00 Building Permit Issuance 1 27.00 Additional Plan Review Electrical 158 157.50 GREEN FEE 1 1.00 SMIP RESIDENTIAL 1 3.00 General Plan Maintenance Fee-Electrical 1 12.60 $453.10 The issuance of this permit shall not prevent the building official from thereafter requiring the correction of errors in the plans and specifications or from preventing builiding operations being carded on thereunder when in violation of the Building Code or of any other ordinance of City of Menifee.Except as otherwise staled,a permit for construction under which no work is commenced within six months after issuance,or where the work commenced is suspended or abandoned for six months,shall expire,and fees paid shall be forfeited. AA_Bldg_Pennit Template.rpt Page 1 of 1 CITY OF MENIFEE LICENSED DECLARATION property who builds or improves thereon,and who contracts for the projects I hereby affirm under penalty of perjury that I am under provisions of with a licensed contractor(s)pursuant to the Contractors State License Law). Chapter9(commencing with section 7000)of Division 3 of the Business and o 1 am exempt from licensure under the Contractor's 5tate License Law for Professions Code an my license is in full force and effect. the following reason: License Class U se No By my signature below I acknowledge that,except for my personal residence Expires �O' 30';L�'l Signature '� - in which l must have resided for at least one year prior to completion of / improvements covered by this permit.I cannot legally sell a structure that I WORKER'S COMPENSATION DECLARATION have built as an owner-builder if it has not been constructed in its entirety by ❑I hereby affirm under penalty of perjury one of the following declarations:I licensed contractors.I understand that a copy of the applicable law,Section have and will maintain a certificate of consent of self-insure for worker's 70"of the Business and Professions Code,is available upon request when compensation,issued by the Director of Industrial Relations as provided for this application is submitted or at the following website: by Section 3700 of the Labor Code,for the performance of work for which www.leeinfo.ca.aov/calaw.html. this permit is issued. Policy# Date XI have and will maintain worker's compensation insurance,as required by PROPERTY OWNER OR AUTHORIZED AGENT section 3700 of the Labor Code,forthe performance of the work forwhich ❑By my signature below I certify to each of the following:I am the property this permit Is Issued.My worker's compensation insurance carrier and policy owner or authorized to act on the property owner's behalf.I have read this number are: // Lc /' application and the information I have provided is correct.1 agree to comply Carrier 1.lx D/�jj SkIb,IfGe with all applicable city and county ordinances and state laws relating to a building construction.I authorize representatives of this city or county to Policy# �✓� / Expires enter the above identified property for inspection purposes. (This section need not to be completed is the permit is for one-hundred Date dollars($100)or less PROPERTY OWNER OR AUTHORIZED AGENT o I certify that in the performance of the work for which this permit is Issued, I shall not employ any persons in any manner so as to become subject to the CITY BUSINESS LICENSE# worker's compensation laws of California,and agree that if I should become HAZARDOUS MATERIAL DECLARATION subject to the worker's compensation provisions of Section 3700 of the Labor Code,I shall forth 'th co ly wit has provisions. // Will the applicant or future building occupant handle hazardous material or a Applicant Z I _ � to —0 sc' mixture containing a hazardous material equal to or greater that the amounts specified on the Hazardous Materials Information Guide? WARNING:FAILURE T/SECURE W RKER'S COMPENSATION COVERAGE IS oyes NNo UNIAWFUL,AND SHA LSUBIECTAN EMPLOYER TO CRIMINAL PENALTIES Will the intended use of the building by the applimmor future building AND CIVIL FINES UP TO ONE HUNDRED THOUSAND DOLLARS($100,000),IN occupant require a permit for the construction or modification from South ADDITION TO THE COST OF COMPENSATION,DAMAGES AS PROVIDED FOR Coast Air Quality Management District(SCAQMD)?See permitting checklist IN SECTION 3706 OF THE LABOR CODE,INTEREST,AND ATTORNEYS FEES for guidelines CONSTRUCTION LENDING AGENCY ❑Yes No I hereby affirm that under the penalty of perjury there is a construction Will the proposed building or modified facility be within 1000 feet of the lending agency for the performance of the work which this permit is issued outer boundary of a school? (Section 3097 Civil Code) o Yes 9No OWNER BUILDER DECLARATIONS I have read the Hazardous Material Information Guide and the SCAQMD I hereby affirm under penalty of perjury that I am exempt from the permitting checklist.I understand my requirements under the State of California Health&Safety Code,Section 25505 and 25534 concerning Contractor's License Law for the reason(s)indicated below by the aozardous material epoytan . checkmark(s)I have placed next to the applicable item(s)(Section 7031.5 yes o / Business and Professions Code).Any city or county that requires a permit to construct,alter,Improve,demolish or repair any structure,prior to its ` ; RIZED AGENT Date PRRTY OyGNERGG Issuance,also requires the applicant for the permit to file a signed statement q AU O that he or she Is licensed pursuant to the provisions of the Contractor's State EPA RENOVATIONREPAIRAND PAINTING(RRP) License Law(Chapter 9(commencing with Section 7000)of Division 3 of the The EPA Renovation,Repair and Painting(RRP)Rule requires contractors Business and Professions Code)or that he or she is exempt from fmnsure receiving compensation for most work that disturbs paint in a pre-1978 and the basis for the alleged exemption.Any violation of Section 7031.5 by residence or childcare facility to be RRP-certified firms and comply with an Applicant for a permit subjects the applicant to a civil penalty of not more required practices.This includes rental properly owners and property than($500). managers who do the paint-disturbing work themselves or through their 01,as owner of the property,or my employee with wages as their sale employees.For more information about EPA's Renovation Program visit: compensation,will do( )all of or( I portion of the work,and the structure is www.epe.gov/lead or contact the National Lead Information Center at not intended or offered for sale.(Section 7044,Business and Professions 1-800-424-LEAD(5323). Code,The Contractors State License Law does not apply to an owner of a D An EPA Lead-Safe Certified Renovator will be responsible for this project property who,through employees'or personal effort,builds or improves the property provided that the improvements are not intended or offered for Certified Firm Name: sale.If,however,the building or improvement is sold within one year of Firm Certification No.: completion,the Owner-Builder will have the burden of proving that it was not built or improved for the purpose of sale. O No EPA Lead-Safe Certified Firm is required for this project because: D I,as owner of the property am exclusively contracting with licensed contractors to construct the project(Section 7044,Business and Professions Code:The Contractors State License Law does not apply to an owner of a If your project does not comply with EPA RRP rule please fill out the RRP Acknowledgement EsGil Corporation In (Partnership with Government for Buirding Safety DATE: 08/09/2016 ❑ APPLICANT ❑ JURIS. JURISDICTION: City of Menifee ❑ PLAN REVIEWER ❑ FILE PLAN CHECK NO.: PMT16-02461 SET: I PROJECT ADDRESS: 28655 Sand Island Way PROJECT NAME: JOANNA SHEAFFER 3,800 Watts Solar Photovoltaic System ❑ The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's building Codes. ® The plans transmitted herewith will substantially comply with the jurisdiction's building codes when minor deficiencies identified below are resolved and checked by building department staff. ❑ The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. ❑ The check list transmitted herewith is for your information. The plans are being held at Esgil Corporation until corrected plans are submitted for recheck. ❑ The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant contact person. ❑ The applicant's copy of the check list has been sent to: ® Esgil Corporation staff did not advise the applicant that the plan check has been completed. ❑ Esgil Corporation staff did advise the applicant that the plan check has been completed. Person contacted: Telephone #: Date contacted: (by: ) Fax #: Mail Telephone Fax In Person E-mail: ® REMARKS: All sheets of plans must be signed by the person responsible for their preparation. Sheets PV-2, PVA PV-5, PV-7, and PV-8 are missing the required signature. By: Sergio Azuela Enclosures: EsGil Corporation ❑ GA ❑ EJ ❑ PC 08/03 9320 Chesapeake Drive, Suite 208 ♦ San Diego, Califomia 92123 ♦ (858)560-1468 ♦ Fax(858) 560-1576 City of Menifee PMT16-02461 Os3/09/2016 [DO NOT PAY— THIS IS NOT AN INVOICE] VALUATION AND PLAN CHECK FEE JURISDICTION: City of Menifee PLAN CHECK NO.: PMT16-02461 PREPARED BY: Sergio Azuela DATE: 08/09/2016 BUILDING ADDRESS: 28655 Sand Island Way TYPE OF CONSTRUCTION: BUILDING OCCUPANCY: Valuation Reg. VALUE ($) BUILDING AREA Mod. PORTION ( Sq. Ft.) Multiplier Air Conditioning Fire Sprinklers TOTAL VALUE Manualtnput Jurisdiction code mnf Bldg. Permit Fee by Ordinance plan Check Fee by ordinance Structural Only Type of Review: ❑ complete Review ❑ ❑ Other Hourl EEO Firs. @ ❑Repetitive Fee $157.50Repeats � EsGil Fee Based on hourly rate Sheet 1 of 1 Comments: 1 112 hours plan review. macvalue.doc+ - I .. ill_7 SCOPE;Stan -- dard plan fo at aovo!atal C o r utput of l Ok latlon of ' win solarpVs ysterns Oun is requi tided o°he roof ofrs Plan covers ov rs ClY d yelling utilizing hay. a 3 e multi le rystalline wire electricarlseCentraltnverters, a single family dwelling. and nd Multi-C rvice not exa This tilling, For rystalline t not larger than 225 Plan is Intended installations din modules where�' inte nded for exceeding this sco all the mod the intended to use with standardto Pe Electrical Plan r, POWe opt.em Voltagesdo with M,.cro-inv DC AC Inverters Atimizers" This dos not Herstra rters containin g an PROJECTgppRESS tx / current ad exceed 6ep volts. Th s plar�er-less Inverters a isolation ttransformer. This plan dyes rs not intended for mited to onfY the re installations wl INSTAILER ttl 4uirements of systems containin Nq INIFpeMATlOIy ,he 2013 California Electrical Code ME VVWW Code �a✓1e /Lle,1, ,�' c 9�sg011 ADDRESS STATE C � p / PHONE(sq�le C"", l� let NOIV/EOWNER: 2IP CODE CITY NAIL. MAIL RE UIREDINFORMATIONF CON TRACTOR Qgg E eQ �Yt^(G 1 Total number of solar OR DC WIRING 7 r f9® 7 TYPE Total 3 To numbef ar modules being installed ofstrings � t S4Arre any strings wired in Para /� 2 Numbe r-Of modules Per string e You installi 1J Yes ng a combiner NO If�� 86 Module Vic (from module nor box with fuses?��Yes Yes"; h4w many are Paralleled together? meplate) If`'Yes" Module maximum - include calculation 9 Tem fuse or circuit br _� ?. Module Iron in Item#13. er Perature correction factor from Table size(from f ro mod ule nameplate) Isc �rom�module nameplate)- the 2013 CEC(varies gg � by Jo cation) 7= W PROJECT ADDRESS Ot CQ(1 �av�c� �S�Gtr�G �/✓q�( 10. Calculate the maximum DC system voltage (shall not exceed the inverter maximum DC input voltage and shall not exceed 600volts): J c�ufA Maximum#of modules per string �� x Voc 7 x temperature correction factor volts gove� p4eh op),M,'LPr; NOTE: This formula is intended to provide a close approximation of the maximum DC system voltage possible at thejob location underthe lowest ambient temperature condition.This result will always be slightly higherthan when using the module manufacturer supplied temperature coefficient.The intent is to alert the installer that the 600 volt limit is close to being exceeded and is not intended to provide as accurate a result as the calculation employing the manufacturer supplied coefficient. Where the installer chooses to use the manufacturer's supplied coefficient, approval by the local enforcing agency is required. 11. Calculate the maximum DC current per string to allow for peak sunlight conditions and continuous operation in excess of three hours: Module Isc x 1.56 , Max amps carried by the conductor 12. Choosing a conductor size for the DC source circuits and output circuit Where Type USE-2 or other listed PV conductors are run in free air from the module locations to a junction box or combiner box,the minimum size permitted shall be#12 AWG per the module manufacturers' installation instructions and the conductor material shall be copper. If any part of the wiring from the modules to the combiner box or inverter is to be installed in a raceway,reductions in the amount of current the conductors can carry may have to be made. Conductors to be installed in a raceway shall be Type THWN-2 or equivalent and the conductor material shall be copper. To select the correct conductor size for the PV source circuits from the modules to the combiner box or to the inverter,go to Table A on page 4. Select how many conductors you will have in the raceway and how high above the roof surface the raceway will be mounted. Using the appropriate "Ambient Temperature"section for the job location,select the number from the column in Table A that matches the result you entered in Item#11.The number in Table A may be the same or larger than the number in Item#11,but it shall not be less. Move to the top of the column to see the minimum size conductor needed for this part of the installation. Enter the number here for the Source Circuit Conductor Size: # 18 AWG, NOTE: Per Section 336.12(B)(1), USE-2 shall not be used for interior wiring. PROJECT ADDRESS ���� JU{d� ��lg✓+d WL}L� 13. If a combiner box is to be installed to connect the string circuits together,then the size of the "Output Circuit" conductors from the combiner to the inverter must be determined.To do this, multiply the number of strings that are to be combined (from Item#3)with the "Max amps" (from Item#11): x = Amps Using Table A, repeat the process used to select the conductor size for the source circuits and enter the number her for . Output Circuit Conductor size:# MV AWG (If no combiner box,enter N/A) 14. Where a combiner box is installed,or where more than two strings of modules are electrically connected together in "parallel", each individual string shall be protected by its own overcurrent protection or feeders to be sized for sum of all short circuit current of all strings.The fuse or breaker shall be listed as being suitable for use in a DC circuit and shall meet or exceed the maximum voltage of the circuit.The rating of the fuse or circuit breaker shall not be larger than the maximum size specified on the lowest rated module in the string.All combiner boxes shall be listed by a recognized listing agency and labeled as such. Max fuse/breaker size permitted (from Item#8) Amps Fuse/breaker size installed Amps NOTE: Where the module specifies "Max fuse size", a circuit breaker shall not be substituted.Where the module specifies"Max overcurrent protective devise" (Max OCPD),then either a fuse or DC rated circuit breaker may be used. NOTE: Per Section 69031(E), DC wiring can only be run inside of the house if it is installed in a listed metallic raceway or enclosure. PROJECT ADDRESS GROUNDING THE DC SIDE OF THE INVERTER: A minimum#8 copper Grounding Electrode conductor must be run un-spliced from the factory identified system grounding terminal of the inverter to the grounding electrode system of the house.The grounding electrode system may consist of one or more of the following:Ground rod(s), Ufer ground, or metallic water pipe with a minimum of 10 feet in the ground(Section 690.47). AC WIRING INFORMATION 15.The inverter shall be listed and labeled by a recognized testing agency and be identified as "Utility Interactive'. Ground fault protection (GFP)shall comply with Section 690.5 of the 2013 CEC. Specify inverter: Make Gf FJ e Model# SQ3 QQ A'u5 Elec rating 3. kW 16. Per Section 690.9, each inverter shall be protected by an overcurrent devise on the AC output side of the inverter. This can be a fuse or a circuit breaker.To correctly size the overcurrent devise, locate the maximum AC output of the inverter(in amps)on the inverter nameplate, and multiply by 1.25(this is required because the unit will be in continuous use for more than three hours). This number will also be used to size the inverter output circuit conductors. Maximum AC output current x 1.25 = �® Amps Where the"Maximum AC output' is shown only in watts,divide that number by 240,then multiply by 1.25 to get the correct size breaker or fuse. If the maximum AC output is between standard breaker or fuse sizes,the next higher size can be used so long as the inverter output conductors are sized sufficiently large enough for the amount of current produced by the inverter. NOTE: Where a fused disconnect switch is installed,the output conductors from the inverter will connect to the "Load" side (bottom)terminals of the switch and the wiring from the utility will connect to the "Line"side(top) terminals.This meets the requirement of Section 404.6(C) and will reduce the risk of electrical shock hazards when changing a fuse with the system still energized by the utility electrical supply. 17. Many utility providers require a performance meter and a safety disconnect switch to be installed between the PV power source and their equipment.This means that the AC power output from the inverter(s)may not connect directly to the electrical panel of the house. For a single inverter,the output from the inverter disconnect switch will connect to the performance meter(if required).Where multiple central inverters are installed,they will usually go first to a solar load center.This is just a standard circuit breaker panel that collects together the output circuits from the individual inverters. Each inverter will have its own circuit breaker.The size of each circuit breaker will be determined from item#16. From this panel one feeder will go to the performance meter,then to the safety disconnect switch and lastly to the point of interconnection at the house electrical panel. No electrical loads shall be connected between the output of the inverter and the connection to the house electrical panel. Contact the local utilities for performance meter and AC utility disconnect switch requirements. PROJECTADDRESS (/�" ��• "A��" p� 18. Where a performance meter is required by the local utility to record the power produced by the PV system,the output wiring from the inverter shall always connect to the"Line'side terminals of the meter. 19. Where disconnect switches(with or without fuses) are installed in the circuit from the inverter output terminals to the house electrical panel,the wiring originating at the inverter(s)shall always connect to the"Load"side terminals of ANY disconnect that has been installed. 20. The connection to the breaker panel shall be through a dedicated circuit breaker that connects to the panel bus bars in an approved manner."Load Side Taps"where the inverter AC wiring does not terminate using a dedicated breaker or set of fuses are prohibited under ANY condition by Section 705.12(D)(1). 21. Per Section 705.12(D)(1),the sum of all overcurrent protective devices supplying power to the bus bar or conductor shall not exceed 120%of their rating. In most PV installations,the breakers feeding the bulbar are the main breaker and the backfed PV breaker. Per Section 705.12(D)(2),to utilize the 120%rule,the PV backfed breaker must be at the opposite end of the main breaker location. For a 100 amp rated bus,this means that the main breaker and the PV backfed breaker shall not add up to more than 120 amps. For a 200 amp rated bus,the combined ampacity of the two breakers (the main breaker and the PV breaker)shall not exceed 240 amps and so on.The location of the PV backfed breaker must be identified per Section 705.12(D)(7)with the following verbiage: "WARNING:INVERTER OUTPUT CONNECTION. DO NOT RELOCATE THE OVERCURRENT DEVISE' NOTE: Where it is not possible to locate the breakers at the opposite ends of the panel bus,the sum of the two breakers is not permitted to exceed 100%of the bus rating. NOTE: In some cases it may be possible to reduce the size of the main circuit breaker to accommodate the addition of a PV breaker and still not exceed the bus bar rating.This requires that a"load calculation" of the house electrical power consumption be made in order to see if this is an acceptable solution. 22. Per Section 690.53,a permanent label for the DC power source shall be installed at the PV DC disconnecting means. This label shall show the following:(a) Rated maximum power-point current, (b) Rated maximum power-point voltage,(c) Maximum system voltage, (d)Short circuit current of the PV system. (a) Rated maximum power-point current(mppA):This is the actual current in amps produced by the PV system. Multiply the Imax value from the module nameplate by the number of strings in the system. Imax x#of strings = )a. 3 Amps (b) Rated maximum power-point voltage(mpp ):This is the highest operating voltage of the PV system. Multiply the Vmax value from the module nameplate by the number of modules in the largest string. Vmax x#of modules = 3 6'0 volts ,}y,Q eSu k� (c) Maximum system voltage (see Item#10) S-CJ® Volts R Re�ui'xf et J bV�oQ}.` _r1fr' (d) Short circuit current of the PV system (module Isc from Item#7 x 1.25) Isc x 1.25= /0'r,A�mpps d NOTE: A phenolic plaque with contrasting colors between the text and background would meet the intent of the co7e ' � 'A ., for permanency. No type size is specified, but 20 pt(3/8")should be considered the minimum.