Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
PMT16-02178
City of Menifee Permit No.: PMT16-02178 29714 HAUN RD. Type: Residential Electrical �ACCELA> MENIFEE,CA 92586 MENIFEE Date Issued: 0 810 5/2 01 6 PERMIT Site Address: 29943 STANDREWS DR, MENIFEE, CA Parcel Number: 340-112-066 92584 Construction Cost: $13,000.00 Existing Use: Proposed Use: Description of INSTALL ROOF MOUNTED SOLAR SYSTEM, 10 PANELS, 10 MICROINVERTERS,3.15 kW Work: Owner Contractor DARYLE JACOBS GENESIS CALIFORNIA 29943 ST ANDREWS DRIVE 1904 S HORNE STREET MENIFEE,CA 92584 OCEANSIDE, CA 92054 Applicant Phone:7606590770 MIKE HOLLOWAY License Number.971122 GENESIS CALIFORNIA 1904 S HORNE STREET OCEANSIDE, CA 92054 Fee Description Qtv Amount t$1 Solar, Residential or Small Commercial 1 252.00 Building Permit Issuance 1 27.00 Additional Plan Review Electrical 158 157.50 GREEN FEE 1 1.00 SMIP RESIDENTIAL 1 2.00 General Plan Maintenance Fee-Electrical 1 12.60 $452.10 The issuance of this pernit shall not prevent the building official from thereafter requiring the correction of errors in the plans and specifications or from preventing builiding operations being carried on thereunder when in violation of the Building Code or of any other ordinance of City of Menifee.Except as otherwise stated,a permit for construction under which no work is commenced within six months after issuance,or where the work commenced is suspended or abandoned for six months,shall expire,and fees paid shall be forfeited. AA_Bldg_Permit_Template.rpt Page 1 of 1 CITY OF MENIFEE LICENSED DECLARATION property who builds or improves thereon,and who contracts for the projects I hereby affirm under penalty of perjury that I am under provisions of with a licensed contractor(s)pursuant to the Contractors State License Law). Chapter9(commencing with section 7000)of Division 3 of the Business and o 1 am exempt from licensure under the Contractor's State License Law for Professions Code and my license is in full force ia;deffe the fallowing reason: Ucense Class UcenseBY my signature below l acknowledge that,except for my personal residence Expires Signature in which l must have resided for at least one year prior to completion of improvements covered by this permit.I cannot legally sell a structure that I WORKER'S COMPENSATION DECLARATION have built as an owner-builder if it has not been constructed in its entirety by D I hereby affirm under penalty of perjury one of the following declarations:I licensed contractors.I understand that a copy of the applicable law,Section have and will maintain a certificate of consent of self-insure for worker's 7044 of the Business and Professions Cade,is available upon request when compensation,issued by the Director of Industrial Relations as provided for this application is submitted or at the following website: by Section 3700 of the Labor Code,for the performance of work for which this permit is issued. www.leginfo.ca.gov/calaw.htmi. Policy R Date PROPERTY OWNER OR AUTHORIZED AGENT ❑I have and will maintain worker's compensation insurance,as required by section 3700 of the Labor Code,for the performance of the work forwhich ❑By my signature below I certify to each of the following:I am the property this permit is issued.My worker's compensation insurance carrier and policy owner or authorized to act on the property owner's behalf.I have read this number are: / application and the information I have provided is correct I agree to comply Carrier '.7T°t�e ty with all applicable city and county ordinances and state laws relating to --� U building construction.I authorize representatives of this city or countyto Policy p '! D �—! i 3 Expires enter the above identified property for inspection purposes. (This section need not to be completed is the permit is for one-hundred Date dollars($100)or less PROPERTY OWNER OR AUTHORIZED AGENT /p I certify that in the performance of the work for which this permit is issued, I shall not emoloy any persons in any manner so as to become subject to the CITY BUSINESS LICENSE q worker's compensation laws of California,and agree that if I should become HAZARDOUS MATERIAL DECLARATION subject to the worker's��ccompensation ovisions of Section 3700 of the Labor Code,l shall for f'�cor t e provisions. / Will the applicant or future building occupant handle hazardous material or a Applicant Dale mixture containing a hazardous material equal to or greater that the amounts specified on the Hazardous Materials Information Guide? WARNING:FAILURE TO SE ORKER'S COMPENSATION COVERAGEIS oyes liftUNLAWFUL,AND SHALL S CTAN EMPLOYER TO CRIMINAL PENALTIES Will the intended use of the building by the applicant or future building AND CIVIL FINES UP TO ONE HUNDRED THOUSAND DOLLARS($100,000),IN occupant require a permit for the construction or modification from South ADDITION TO THE COST OF COMPENSATION,DAMAGES AS PROVIDED FOR Coast Air Quality Management District(SCAQMD)?See permitting checklist IN SECDON 3706 OF THE LABOR CODE,INTEREST AND ATTORNEYS FEES for guidelines CONSTRUCTION LENDING AGENCY o Yes .CNo I hereby affirm that under the penalty of perjury there is a construction Will the proposed building or modified facility be within 1000 feet of the lending agency for the performance of the work which this permit is issued outer boundary of a school? (Section 3097 Civil Code) D Yes XNo OWNER BUILDER DECLARATIONS I have read the Hazardous Material Information Guide and the SCAQMD hereby affirm under penalty of perjury that I am exempt from the permitting checklist.I understand my requirements under the State of California Health&Safety Cade,Section 25505 and 25534 concerning Contractor's License Law for the reason(s)indicated below by the hazardous mate'�n . checkmark(s)I have placed next to the applicable item(s)(Section 7031.5 ,AYes o Business and Professions Code)-Any city or county that requires a permit to Date construct,alter,improve,demolish or repair any structure,prior to its pit EITY OWNER O THORRED AGENT issuance,also requires the applicant for the permit to file a signed statement that he or she is licensed pursuant to the provisions of the Contractors State EPA RENOVATION,REPAIR AND PAINTING(RRP) License Law(Chapter 9(commencing with Section 7000)of Division 3 of the The EPA Renovation,Repair and Painting(RRP)Rule requires contractors Business and Professions Cade)or that he or she is exempt from licensure receiving compensation for most work that disturbs paint in a pre-1978 and the basis for the alleged exemption.Any violation of Section 7031.5 by residence or childcare facility to be RRP-certified firms and comply with an Applicant for a permit subjects the applicant to a civil penalty of not more required practices.This includes rental property owners and property than($500). managers who do the paint-disturbing work themselves or through their 01,as owner of the property,or my employee with wages as their sole employees.For more information about EPA's Renovation Program visit: compensation,will do( )all of or( )portion of the work,and the structure is www.epa.gov/lead or contact the National Lead Information Center at not intended or offered for sale.(Section 7044,Business and Professions 1-800-424-LEAD(5323). Code;The Contractor's State License Law does not apply to an owner of a o An EPA Lead-Safe Certified Renovator will be responsible for this project property who,through employees'or personal effort,builds or improves the property provided that the improvements are not intended or offered for Certified Firm Name: sale.If,however,the building or improvement is sold within one year of Firm Certification No.: completion,the Owner-Builder will have the burden of proving that it was not built or improved for the purpose of sale. o No EPA Lead-Safe Certified Firm is required for this project because: o 1,as owner of the property am exclusively contracting with licensed contractors to construct the project(Section 7044,Business and Professions Code:The Contractor's State License Law does not apply to an owner of a If your project does not comply with EPA RRP rule please fill out the RRP Acknowledgement. EsGil Corporation In Partnership with Government for Buird'ing Safety DATE: 07/15/16 ❑ APPLICANT `0r'iuF21S. JURISDICTION: City of Menifee ❑ PLAN REVIEWER ❑ FILE PLAN CHECK NO.: PMT16-02178 SET: I PROJECT ADDRESS: 29943 Saint Andrews Dr. PROJECT NAME: DARYLE JACOBS 10 @ 280 Watts Micro-inverters Solar Photovoltaic System. ® The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's building codes. ❑ The plans transmitted herewith will substantially comply with the jurisdiction's building codes when minor deficiencies identified below are resolved and checked by building department staff. ❑ The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. ❑ The check list transmitted herewith is for your information. The plans are being held at Esgil Corporation until corrected plans are,submitted for recheck. ❑ The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant contact person. ❑ The applicant's copy of the check li4 has been sent to: ® Esgil Corporation staff did not advise the applicant that the plan check has been completed. ❑ Esgil Corporation staff did advise the applicant that the plan check has been completed. Person contacted:-- Telephone #: Date contacted: (by9k) Fax #: Mail Telephone Fax In Person E-mail: ❑ REMARKS: By: Sergio Azuela Enclosures: EsGil Corporation ❑ GA ❑ EJ ❑ PC 07/13 9320 Chesapeake Drive, Suite 208 ♦ San Diego,California 92123 ♦ (858)560-1468 ♦ Fax(858) 560-1576 City of Menifee PMT16-02178 07/15/16 [DO NOT PAY— THIS IS NOT AN INVOICE] VALUATION AND PLAN CHECK FEE JURISDICTION: City of Menifee PLAN CHECK NO.: PMT16-02178 PREPARED BY: Sergio Azuela DATE: 07/15/16 BUILDING ADDRESS: 29943 Saint Andrews Dr. BUILDING OCCUPANCY: TYPE OF CONSTRUCTION: BUILDING AREA Valuation Reg. VALUE ($) PORTION ( Sq. Ft.) Multiplier Mod. Air Conditioning Fire Sprinklers TOTAL VALUE Judscliction Cade mnf IlManualinput Bldg, Permit Fee by Ordinance W Phn Check Fee by Ordinance Type of Review: ❑ Complete Review ❑ Structural Only ❑ Other ❑Repetitive Fee Repeats E--� 1.5 Hrs. @ EsGil Fee $105.00 $157.5 Based on hourlyrate Comments: 1 1/2 hours plan review. Sheet 1 of 1 macvalue.doc+ SOLAR PV STANDARD RESIDENTIAL PLANS FOR MICROINVERTER SYSTEMS _= Menifee SCOPE: Standard plan for installation of microinverter solar PV systems, not exceeding a total AC output of 10kW in a single family dwelling having a 3 wire electrical service not larger than 225 amps at a voltage of 120/240.This plan covers Crystalline and Multi-Crystalline type modules where all the modules and microinverters are mounted on the roof of a single family dwelling. For installations exceeding this scope, Electrical Plan review is required. NOTE: This plan is not intended for systems containing batteries.This document addresses only the requirements of the 2013 California rElectrical Code(CEC). PROJECT ADDRESS _ !ia ! { J Ju v, , r Av\-jf tW_5 C;r / l tin' �e A 9' i SL INSTALLER INFORMATION NAME //ce 5-ne15 LA PHONE 76a VtE' � 7S2 ADDRESS__/1 7 S NlOt-rl-e S1` �� // CITY 06ectji Ic, E STATE ZIP CODE z05H EMAIL /V�tk_ L�'' (Vto iS Vir L© V�,X to HOMEOWNER: CONTRACTOR: ® CONTRACTOR LICENCE# % ,/ i 4 6 17 TYPE NOTE: Calculate the total AC output of the system. i0 #of microinverters /t 7S x Inverter AC Output Current 1�_' 5 amps x 240 volts= c-"- atts 30CC watts divided by 1,000= J kW r MODULE INFORMATION City of Menifee ) Building & Safety Dept. 1. Manufacturer I_ L JUL 12 2016 2. Model number L_ 6- -;I- ✓ i 6 _ Gti 3.Total number of modules being installed 10 /, Received 4. Maximum DC output voltage (Voc) "/ty, Volts U 5. Maximum DC current output (Isc) ( D<- Amps IMPORTANT: Not all modules are suitable for use with microinverter systems. Review the microinverter Installation manual prior to beginning any installation to avoid costly errors. W a City of Men ifee Building & Safety Department 29714 Houn Rd. Menifee, CA 92586 951-672-6777 www.citycfmeni(ee.us REVISED 9/2015 s. F&I wpm MICROINVERTER SYSTEMS JIF PROJECT ADDRESS 1+ 4vtJ� v_s dA/ TEMPERATURE COMPENSATION FOR ROOF MOUNTED CABLES UNDER THE ARRAY Temperatures under the array may be higher than the surrounding ambient air. Where cables are installed close to the roof surface or to the modules, local jurisdictions may require the ambient air temperature to be higher based on local conditions.Some local enforcing agencies use ASHRAE to determine the local ambient temperature. 17.Ambient Air Temperature for this jurisdiction is bey A,12,rAl z � ,ST NOTE: Some local jurisdictions may require this temperature to be increased when sizing conductors beneath the array. SIZING THE CONDUCTORS FOR THE MICROINVERTER BRANCH CIRCUIT The amount the current that will be carried by the conductors shall be calculated as follows: 18. Maximum#of inverters installed per branch circuit x 1.25 (for long continuous load = x Maximum inverter AC output(Item#11) S d'-A � '��r Amps Where the manufacturer supplied cable transitions to regular building wire installed inside of a raceway, a reduction in the amount of current these conductors can carry may be required based on the exposed ambient air temperature and number of conductors in the raceway. Note how many conductors will be in the raceway and how high above the roof surface the raceway will be mounted. Using Table A on page 4,select the appropriate "Ambient Temperature" section for your project location from Item 17 and choose a conductor size that will meet or exceed the result from Item 18. Your selected conductor size is permitted to have a higher ampacity that the number in Item 18 but it shall not be less. Selected conductor size for branch circuit wiring in raceway 10 AWG City of Menifee Building& Safety.Department 29714 Haun Rd. Menifee, CA 92586 951-672-6777 www.cityofinenifee.us L l Jq h J- i, 11 E•a- _ Z _- PROJECT ADDRESS / 3 S",✓i t ✓w d f''Li+/ D Q ✓I/ie e (H 72 MICROINVERTER INFORMATION Each microinverter shall be listed by a recognized listing agency, have factory installed Ground Fault protection and be identified as"Utility-Interactive". Provide the following information from the microinverter installation manual. If any information is not provided by the manufacturer,write "Not Given" in the appropriate box. 6. Manufacturer rv)f k0. 5 c 7. Model number S 2 S() — 6 0 ' 11 L it rj 8. Minimum mounting height above the roof surface 0- IS- Inches 9. Maximum DC input voltage y g Volts 10. Maximum DC input current 15- Amps 11. Maximum AC output current L 13 Amps 12. Maximum size branch circuit breaker permitted Z D Amps 13. Maximum number of inverters permitted per branch circuit f NOTE: The number of microinverters installed per branch circuit maybe less than the maximum number permitted by the manufacturer,but it shall not be more. MANUFACTURER"TRUNK"CABLE(if supplied) Some microinverter manufacturers include as part of their installation kit a "Trunk"cable that each microinverter of the branch circuit plugs into.These cables must be listed by a recognized listing agency, have a wet insulation temperature rating of at least 90 degrees Celsius, be provided with an equipment grounding conductor inside of the overall cable sheath and contain no more than three current carrying conductors. Cables that will be exposed to sunlight must be listed as such.This cable will typically be run underneath the array where it will not be subject to physical damage.This cable, if provided, must be used. Non-manufacturer supplied cables or installer fabricated assemblies are not approved. Where the cable is exposed to physical damage,the cable shall be protected. 14. Provide the conductor size of the manufacturer supplied "Trunk"cable 12 AWG (from cable jacket) 15. Provide the minimum installation spacing above the roof surface to the bottom of the"Trunk" cable per the installation instructions (if no dimension is specified, write "None Given") Movie (;iv Lr'J Inches 16. Provide the minimum installation spacing below the array modules to the tope of the 'Trunk" cable per the installation instructions(if no dimension is specified,write"None Given") /Ihvie 6i V[n Inches City of Menifee Building& Safety Department 29714 Haun Rd. Menifee, CA 92586 951-672-6777 www.cityofinenifee.us REVISED 9/2015 SOLAR PV STANDARD RESIDENTIAL PLANS PROJECT ADDRESS 6ctc -ii- Anc�v'GwS D p- MLA )"cc le � A' SOLAR LOAD CENTER AND CIRCUIT BREAKERS SIZING AND INFORMATION Many utility providers require a performance meter and a safety disconnect switch to be installed between the PV power source and their equipment.This means that the microinverter branch circuits may not connect directly into the electrical panel of the house.They may go first to a solar load center.This is just a standard circuit breaker panel that collects together the individual branch circuits from the microinverters. Each branch circuit shall have its own dedicated circuit breaker. From this panel one feeder will go to the performance meter(if required),then to the safety disconnect switch (if required),and finally to the point of interconnection at the house electrical panel. Only PV system monitoring equipment/devices are permitted to the connected between the output of the inverter and the house electrical panel. Contact your local utilities for performance meter and AC utility disconnect switch requirements. 19.Total number of microinverter branch circuits installed in the solar load center 20. List the current in Amps(from Item 18)for each individual branch circuit in the solar load center. Circuit#1 output—�L Amps,Circuit#2 output Amps,Circuit#3 output & Amps,Circuit#4 output—z5k Amps 21.Total PV current in Amps connected to the panel(sum of the individual branch circuits from Item 20)_A—Amps 22. Panel bus bar rating(from panel label) io Amps.This figure must be larger than the number in Item 21 or the panel will be undersized. 23.Size of Main breaker if installed (if no main wire,write "None") 200 Amps 24.To size the feeder conductors leaving the solar load center use the result from Item 21 and to Table 310.16,using the 750C column,to select the correct size of conductor for your installation. UTILITY"PERFORMANCE" METER(if reguiredl Where an additional meter is required by the local Utility to record the power produced by the PV system the output wiring from the microinverters shall always connect to the"Line"side terminals at the top of the meter. ewiring have the meter to the electrical panel will connect to the "Load"side terminals at the bottom. Not all utility providers the same requirements for connecting solar power systems to their electrical systems. Contact the Southern California Edison for specific requirements in the City of Menifee. UTILITY"SAFETY DISCONNECT SWITCH" (if required) Where disconnect switches(with or without fuses) are installed in the circuit(s)from the microinverters to the house electrical panel,the wiring originating at the microinverters shall always conned to the "Load" side (bottom)terminals of ANY disconnect switch that has been installed.The wiring originating at the electric service panel shall always conned to the"Line" side (top)terminals. Contact Southern California Edison for specific requirements. city of Met,ifee Building&Safety Department 29714 Noun Rd. Memfee, CA 92586 951-672-6777 www.cityofmemfee.us REVISED 9/2015 CONNECTION TO THE HOUSE ELECTRICAL PANEL The connection to the service panel shall be through a dedicated circuit breaker that connects to the panel bus bars in an approved manner. "Load Side Taps"where the inverter AC wiring does not terminate using a dedicated breaker or set of fuses are prohibited under ANY condition by Section 705.12(D)(1). Where the main breaker of the electrical panel that the PV system will interconnect to is located at either the top or bottom of the panel distribution bus bars and the PV interconnect breaker is located at the opposite end,the code permits the sum of the ratings of the main breaker and the PV breaker to exceed the rating of the panel bus bars. Per Section 705.12(D)(1),the sum of the electrical panel main breaker and the microinverter PV interconnect breaker shall not add up to more than 120%of the rating of the panel bus bars. For a 100 amp rated bus this means that both breakers together shall not add up to more than 120 amps. For 200 amp rated bus, not more than 240 amps, and for 225 amps, not more than 270 amps. In order to qualify for this additional allowance,the PV breaker must be located at the opposite end of the breaker panel from the main breaker and shall have the warning label installed next to it per Section 705.12 (D)(7)with the following verbiage: WARNING: INVERTER OUTPUT CONNECTION. DO NOT RELOCATE THIS OVERCURRENT DEVISE. NOTE: Certain "All-in-One"service panels have the factory installed main breaker in the center of the distribution section. Because of the possibility of overloading the bus bars,this type of service is not able to take advantage of the 120%overage permitted for top or bottom fed bussing. For this type of installation the sum of the main circuit breaker and the PV breaker may not exceed 100%of the rating of the factory bussing. For example, if the service panel label states that the bus bars are rated for 200 amps you cannot exceed that figure. In some cases it may be possible to reduce the size of the main circuit breaker to accommodate the addition of a PV breaker and still not exceed the bus bar rating.This requires that a `load calculation"of the house electrical power consumption be made in order to see if this is an acceptable solution. Where it is necessary to install the PV interconnection as a "Line Side Tap"and where the electrical service panel at the dwelling is an"All-in-One" type,the service shall be provided with factory installed terminals designed specifically to accommodate this type of connection.Where these terminals are not provided there shall be NO PV connection between the load side of the meter and line side of the main circuit breaker. GROUNDING THE PHOTOVOLTAIC SYSTEM A Grounding Electrode Conductor sized per the manufacturer's installation instructions(minimum#8 AWG solid copper) shall be run UNSPLICED from the factory identified grounding terminal of each microinverter to the grounding electrode system of the house(i.e.ground rod, Ufer ground, or metallic water pipe with a minimum of 10 feet in the ground). NOTE: The Grounding Electrode Conductor is permitted to be spliced per Section 250.64(C) using an irreversible means or by the installation of a "Ground Plate".A Ground Plate is defined as a copper bus%"thick by 2"wide by whatever length is needed to terminate the conductors.This conductor may also be used as the required equipment grounding conductor for the modules and the frame rails of the array. Equipment grounding conductors may be connected to the Grounding Electrode Conductor by non-irreversible means such as listed split bolts. City of Menifee Building& Safety Department 29714 Noun Rd. Menifee, CA 92586 951-672-6777 www.cityofinenifee.us REVISED 9/2015 SOLAR PV STANDARD RESIDENTIAL PLANS FOR MICROINVERTER SYSTEMS DISCONNECTION OF PHOTOVOLTAIC EQUIPMENT Section 690.15 requires that means are provided to disconnect equipment from all ungrounded conductors of all sources.Such disconnecting means shall comply with Sections 690.16 and 690.17. NOTE: Section 690.17 contains an exception which states"A connector shall be permitted to be used as an AC or a DC disconnecting means, provided that it complies with the requirements of Section 690.33 and is listed and identified for that use." SIGNAGE Per Section 690.54, a permanent label for the microinverter AC power source shall be installed at the point of interconnection at an accessible location.This label shall show that it is a PV source and additionally,the rated AC output current and the nominal operating AC voltage. City of Menifee Building& Safety Deportment 29714 Houn Rd. Ivlenifee, CA 92586 951-672-6777 www.cityofmenifee.us REVISED 9/2015 _ _ _ �TANDARD RESIDENTIAL PLANS FOR MICROINVERTER SYSTEMS NOTE: Italicized text shown inside the boxes is not required to be part of the sign. It is only for reference. NOTE: Install a permanent plaque or directory providing the location of the service disconnecting means,and photovoltaic system disconnecting means if not installed at the same location.The plaque shall be mounted on the exterior of the building. City of Menifee Building& Safety Department 29714 Houn Rd. Nlenifee, CA 92586 951-672-6777 www.cityofmenifee.us REVISED 9/2015 GENESIS S Or 1904 SOUTH HORNE STREET OCEANSIDE, CA 92054 PHONE (760) 659-0770 r LIC: 971122C SHEET INDEX: CyPress Point Or 00: COVER AND PLOT MAP ~' - PV-1: SITE PLAN DRAWING PV-2: SINGLE LINE DIAGRAM O rJ `` PV-3: RACKING PLAN /DETAILS U a -- - PV-4: SYSTEM LABELS/PLACARDS W ATTACHED SPEC. SHEETS/ ETC.- LL groadstorye may — _ o," o -- INVERTER SPECIFICATIONS LL {r — - I MODULE SPECIFICATIONS Q _ Y• N i J Ca n/ o CI GROUNDING LUG SPECIFICATIONS o - - — m MOUNTING SYSTEM Newport Rd City of Menifee p Newport Rd RACKING SYSTEM Building Af8atety Dept. coo o JUA-2 20°°°Qo A GENERAL NOTES: Via Amante rbe �,r a Ila 1. THIS PROJECT SHALL COMPLY WITH THh 2St CALIF ELECTRICAL CODE(CEC),THE 2013 CALIFORNIA BUILDING CODE QC n 't (CBC),THE 2013 CALIFORP IA R°SIDENTIAL OOE(CRC7 2UST ` NATIONAL ELECTRIC CO. (NEC).THE LTA 3 CALIFORNIA CODE \ OF REGULATIONS(CCP.)T T E.24 WHICH ADOPTS AND AMEND to THE 2012 INTERNATIONAL RESIDENTIAL CODE(IRC),2012 M \ \ a y� INTERNATIONAL BUILDING WUE(IBC)'2012(JTERNATIONAU MECHANICAL CODE(IMC),2012 UNIFOPM PLUMBING CQO5 , A (UPC),TO THE 2013 CALIFORNIA PLUMBING CODE,AND 2013 CALIFORNIA ENERGY EFFICIENCY STA,NDA4b.. m Via Palermo A 2. DESIGN COMPLYING WITH THE LATEST EDITION OF THE _ RIVERSIDE AREA ELECTRICAL NEWSLETTERS,ALL LOCAL DO 0 150 300 450 600- 75.Om % �., ORDINANCES AND POLICIES,AND THE COUNTY OF RIVERSID S CONSOLIDATED FIRE CODE �oQ�tOFESS/p491 3. THIS INSTALLATION SHALL COMPLY WITH THE 2 MIT11FORNIA NI. RESIDENTIAL CODE SECTIONS R331.4,2.1 THROUGH 1.4.2.3. 10 AZIMUTH: 10 MODULES @ 162° T THE"CAL-FIRE SOLAR PHOTOVOLTAIC INSTALLL T y GUIDELINE"AND ARTICLE 690 OF THE NATION L r�! No. C58724 CA^ CODE(NEC NFPA 70). SYSTEM INFORMATION ROOF PITCH: 28° 4. THIS SYSTEMSTORAGE BATTERIES. INTERACTI SYSTEM SIZE 3.15 kW QTY � Exp.3-31-17 * STORAGE BATTERIES. LG MODULE LG315NiC-G4 10 SUBDIVISION NAME: MENIFEE �Tql CiV0, \P 5. THIS SYSTEM WILL NOT BE INTI MCTED N A AL ENPHASE MICRO-INVERTER S280-60-LL-5-US 10 FOF C A\, FROM THE LOCAL JURISDICTION AND THE UTILITY COMPAN LOT#: 66 ARE OBTAINED. July 06,2016 6. PROPER ACCESS AND WORKING CLEARANCE WILL BE YEAR BUILT: 1989 www. Loyd W Martin .corn PROVIDED AS PER SECTION 110.26 CEC. Solar Structures Engineering 7, A LADDER SHALL BE IN PLACE FOR INSPECTION IN COMPLIANCE #2016-2204 Structural Only WITH CAL-OSHA REGULATIONS. Daryle Jacobs RESIDENCE ASSESSORS PARCEL NUMBER: ISSUE: DRAWN BY: EMAIL: PROJECT NO: 29943 Saint Andrews Drive, Menifee, CA 92584 340 � )2=066 06/30/2016 I ND I NIA pit( ,p1 0 6 _ CONSTRUCTION NOTES: 1. SOLAR PHOTOVOLTAIC SYSTEM TO BE INSTALLED ON LA RESIDENTIAL STRUCTURE. to 2. THIS PROJECT HAS BEEN DESIGNED IN COMPLIANCE LU WITH THE CBC SECTION 1609 TO WITHSTAND A BASIC WIND SPEED OF 110 MPH(3 SECOND GUST),WIND EXPOSURE C. W 3. THE HOUSE IS A TWO STORY STRUCTURE. 4. THE ROOF MEMBERS ARE 2a4 TRUSSES ON 24" O CENTERS. CONNECTION TO STRUCTURE SHALL NOT BE WITHIN 6"TRUSS OF NAILING PLATES. 6. THE SOLAR PHOTOVOLTAIC INSTALLATION SHALL NOT OBSTRUCT ANY PLUMBING,MECHANICAL OR BUILDING LIC:971122 ROOF MOUNTED SOLAR MODULES ROOF VENTS. AND MICRO-INVERTERS 6. ALL CONDUCTORS AND CONDUITS MOUNTED ON ROOF (SEE SHEET 3 FOR MOUNTING DETAILS) SHALL BE MINIMUM 314"ABOVE ROOF SURFACE PROPOSED EXISTING 200A SERVICE ENTRANCE (INCLUDING CABLES UNDERNEATH MODULES AND CONDUIT RUN WITH NEW 15A BREAKER RACKING). 3'CAL-FIRE SMOKE VENTILATION ACCESS AS PV DISCONNECT 7, ROOF ACCESS POINTS SHALL BE PROVIDED PER THE SEE SHEET 3 FOR DIMENSIONS FOLLOWING(CRC R331.4.1.CBC 3111AA): U -LOCATED IN AREAS NOT REQUIRING PLACEMENT OF _ GROUND LADDERS OVER OPENINGS SUCH AS DOORS Quj N V OR WINDOWS. — Q LOCATED AT STRONG POINTS OF BUILDING -J V) CONSTRUCTION IN LOCATIONS WHERE ACCESS POINT O DOES NOT CONFLICT WITH OVERHEAD OBSTRUCTIONS > W W I SUCH AS:TREE LIMBS,WIRES,OR SIGNS O U) Z 0 I (7 1— cf) r ' o o CU O >1 M S. S (q 4i 4 ° n Z. LU to WEATHERPROOF(NEMA 3R) z 3'CAL-FIRE ACCESS PATHWAY AC DISCONNECT W , '3 LID SEE SHEET 3 FOR DIMENSIONS ON ROOF WITH A RATING OF 20A LLI � 4 c a� CAL-FIRE ROOF ACCESS POINT y N C: PER CRC 2013 SEC. R331.4.1 TYP. �OQROFESS/p V I W !3 rn o y N m No. C58724 * Exp.3-31-17 ,,11 �T9rF ( �\P REVISIONS: OF C AL E /f July 06,2016 N www. Loyd W Martin .com DRAYM BY: No Solar Structures Engineering JOB NO: S209 SITE PLAN #2016-2204 Structural Only DAM: 07/05/2016 SCALE: 1" = 20'-0" SITE PLAN DRAWING SHEET: PV-1 ELECTRICAL NOTES: ^ 1. THE PHOTOVOLTAIC CONNECTION IN THE PANEL BOARD SHALL BE POSITIONED AT THE OPPOSITE(LOAD)END (J! EXIST.OUTLET LOCATED FROM THE INPUT FEEDER LOCATION OR MAIN CIRCUIT LOCATION PER CEC ART.690.64 WHEN USING THE 120%OF — AT ACONVENIENT LOCATION ENVOY CUAMUNIC-ATIONS GATEWAY RATING ALLOWANCE FOR DETERMINING THE TOTAL RATING OF OVER CURRENT DEVICE(CEC 690.64.) IF THE INPUT LO FOR METERING FEEDER IS LOCATED IN THE CENTER OF THE MAIN SERVICE PANEL(CENTER FED)THE 120%RULE DOES NOT APPLY w ETHERNET CABLE AND THE MAXIMUM ALLOWABLE PV AMPERAGE WILL BE LIMITED TO 100%OF THE MAIN BREAKER MINUS THE 7 n� /TO BROADBAND ROUTER RATING OF THE MAIN SERVICE PANEL, L W 2. SOLAR CIRCUIT BREAKERS SHALL BE SUITABLE FOR BACKFEED. (CIRCUIT BREAKERS THAT ARE MARKED"LINE" LIJ AND"LOAD'ARE NOT SUITABLE FOR BACKFEED.) ENPHASE MC-4 CONNECTOR 3. LABELS ARE REQUIRED ON ALL INTERIORAND EXTERIOR PHOTOVOLTAIC DC CONDUIT,RACEWAYS,ENCLOSURES O AS MEANS OF DC DISCONNECT PER MANUF. AND CABLE ASSEMBLIES.LABEL SHALL READ WARNING:PHOTOVOLTAIC POWER SOURCE" OR EQUIVALENT. SIGN INSTRUCTIONS AND NEC 690.33(E)(1) SHALL HAVE A RED BACKGROUND,WHITE LETTERING,MINIMUM 3/8'LETTER HEIGHT,ALL CAPITAL LETTERS,ARIAL �' 600 VDC, 30A RATING OR SIMILAR FONT,NON-BOLD,AND ON ARED BACKGROUND.THE MATERIALS USED SHALL BE REFLECTIVE, NOTE:MC-4 CONNECTOR PART OF INVERTERS CSA WEATHER RESISTANT AND SUITABLE FOR THE ENVIRONMENT. LABEL SHALL BE LOCATED AT EVERY 10 FEET OF CERTIFICATION APPROVED FOR LOAD BREAK CONDUIT,WITHIN V OF TURNS OR BENDS,WITHIN V ABOVE AND BELOW PENETRATIONS OF ROOF/CEILING Ili wjj ISO® ® OPERATION LIC:971122 ASSEMBLIES,WALLS,OR BARRIERS AND AT ALL PV COMBINER AND JUNCTION BOXES.IN THE CASE OFMICRO- 01*1 UK a INVERTERS NO LABELS ARE REQUIRED AS THERE ARE NO DC CONDUITS. 9 --,,ENPHASE S280-60-LL-5-US INVERTER 4. EXPOSED NON-CURRENT CARRYING METAL PARTS OF PHOTOVOLTAIC RACKING,EQUIPMENT,AND CONDUCTOR LOCATED UNDER EACH MODULE ENCLOSURES SHALL BE GROUNDED IN ACCORDANCE TO NEC 690.47(C)(3),250.64(C),260.66.&250.134 OR 250.136(A). END CAP INSTALLED ON LAST INVERTER FOR UNGROUNDED SYSTEMS,THE CONDUCTOR SHALL BE SIZED IN ACCORDANCE WITH 250.122 AND SHALL NOT BE CABLE OF BRANCH CIRCUIT REQUIRED TO BE LARGER THAN THE LARGEST UNGOUNDED PHASE CONDUCTOR. ENPHASE / ENVOY DETAIL 5. THE DC CIRCUIT OF ENPHASE MICRO-INVERTERS WITH INTEGRATED GROUND MEETS THE REQUIREMENTS.NO GEC PHOTOVOLTAIC MODULE IS REQUIRED,ONLY EGC SHALL BE REQUIRED AND BE IN ACCORDANCE WITH THE TABLE INNEC250.122 U_ 6. THE DEC/EGC SHALL BE CONTINUOUS,OR WHEN SPLICED,THE SPLICE SHALL BE MADE BY IRREVERSIBLE CRIMP Q N U PER NEC 250.64(C). _ j (Q 7. MODULE FRAME GROUNDING METHOD WILL BE BONDED TO RACKING EQUIPMENT THROUGH MID CLAMPS AND IS O LLI LISTED TO UL2703.ALL METHODS SHALL COMPLY PER MANUFACTURERS SPECIFICATION SHEETS AND O 1.- Ln INSTRUCTIONS,AND BE IN ACCORDANCE WITH CEC 250. F-- CO r 8. WHEN CIRCUITS ARE TO BE RAN THROUGH ATTIC OR IN WALLS,AWG#10-3 ROMEX(ONE PER CIRCUIT)IS Q >- m ACCEPTABLE AS THERE ARE NO DC CONDUCTORS AND EQUIPMENT GROUNDING MEET THE REQUIREMENTS FOR d UNGROUNDED PV ARRAYS IN NEC 690.35. 3/4" EMT (3x)AWG#10(THWN-2) 9. IF THE EXISTING GROUNDING ELECTRODE SYSTEM CAN NOT BE VERIFIED,OR IS ONLY METALLIC WATER PIPING,OR PER CIRCUIT IT HAS A RESISTANCE GREATER THAN 25 OHMS,IT IS THE CONTRACTORS RESPONSIBILITY TO INSTALL A I ° 000000 WITH&(1x)#8 GROUND SUPPLEMENTAL GROUNDING ELECTRODE AT LEAST V FROM THE EXISTING GROUNDING ELECTRODE. I 0 0 ° o0 00 (EGC-SEE NOTE#5) 10. ELECTRICAL EQUIPMENT INSTALLED SHALL BE LISTED,LABELED,OR CERTIFIED FOR ITS USE BY A NATIONR LLY ` °< LG MODULES RECOGNIZED TESTING LABORATORY(NRTL). ` ' W LG 315-N1C-G4 MODULE(S) , (10x)MODULES IN SERIES (FOR GROUNDING SEE NOTE#5) <M LU °Co Lo o °Z a- ENPHASE S280-60-LL-5-US PROVIDE J-BOX EXISTING 200A MICRO-INVERTER(S) WEATHERPROOF AS EXISTING 200A METER&PANEL (10x)PER BRANCH CIRCUIT AC DISCONNECT REQUIRED MAIN BREAKER (NOT CENTER FED) ON ROOF(NEMA INTEGRATED DO ISOLATED GROUND o +.+ 3R)WITH RATING _ (SEE NOTE#5) OF 20A) ITV/I N c C .Q Cf) N V m2 K 3/4"EMT Q(LOPESS (3x)AWG#10(THWN-2) PER CIRCUIT 5 o r WITH&(1x)#8 GROUND c3 m (EGC-SEE NOTE#5) `� No. C58724 po REVISIONS: ENPHASE ENGAGE AC INTERCONNECT 15A PV BREAKER * Exp.3-31-17 FACTORY CABLING WITH AWG#8 SOLID (S FOR BREAKER EE NOTE#1 P�q p/V(` ��P DRAW COPPER GROUND TO RACKING SYSTEM LOCATION) pF DRAWN BY. ND JOB CAL\F0� NO: S209 EXISTING LIFER IDENTIFIED July 06,201E DATE: 07/05/2016 NGLE PER NEC SECTION 250.52(A)(3) www. Loyd W Martin .com SID AGRAME (SEE ELECTRICAL NOTE#8) Solar Structures Engineering SHEET: #2016-2204 Structural Only PV-2 INSTALLATION NOTES: 1. DISTANCE BETWEEN PENETRATIONS NOT TO EXCEED 4'-D" L I VENTILATION AOKESS �oQWDFESS/0,I,, 2. RAIL OVERHANG FROM PENETRATIONS NOT TO EXCEED w 6 8 6:12 ROOF PITCH o l y 3. LAG SCREWS SHALL BE AT LEAST 6-FROM ANY NAILING W c3 � R No. C58724 PATES. V SUPPORT RAIL * Exp.3-31-17 4. LAGS MUST HAVE A MINIMUM OF 2.5"THREAD DEPTH INTO 01 V 0- RAIL SPLICE AS REQ- STRUCTURAL BEAM. O `��' �Q- \ 9TF OF F 5. ADJUSTMENTS MAY BE REQUIRED DUE TO EXISTING ROOF 5'-5" II i~o CAL\ CONDITIONS. i I 2 x 4 TRUSS July 06,2016 CENTERLINE 6. THE COMBINATION OF MOUNTING SYSTEM AND PV i -a www. Loyd W Martin .com MODULES ACHIEVE THE CLASS"A"FIRE RATING PER UL LIC:971122 T CAL-FIRE /� 1 1783 FIRE CLASSIFICATION STANDARDS. Solar Structures Engineering LG SOLAR PV MODULE #2016-2204 Structural Only ACCESS — - ®I� 39.37"x 64.57"37.0 LBS PATHWAY j j li *— TYPICAL ATTACHMENT POINT 4 W/5/16"S.S. LAG LAG CENTERED C.) IN STRUCTURAL MEMBER. LL1 13' 4' LAGS MUST HAVE A MINIMUM Q OF 2.5"THREAD DEPTH INTO H STRUCTURAL BEAM 0 :E � 0 FW-- N ° U M 1 ENLARGED PARTIAL ROOF/RACKING PLAN SCALE: 1/8" = 1'-0" I. , QUICK MOUNT ` PRIMARY FLASHING � 4�� TYP WITH THREE COURSE ,>_ METHOD JACOBS - S209 DEAD LOAD SOLAR MODULE w( LO Module LG315N1C-G4 W N N Weight 37-48 Ibs U O Area (Module) 17.7 sq.ft. Quantity Lbs.I Unit Lbs. I City. SEAL W/ Module STANDARD APPROPRIATE WATERTIGHT N to C 1Q 37.5 375 ROOFING MASTIC 21/2"SOLAR RAIL TO COMPLY WITH SECT. M Inverter(Micro) 10 4.4 44 Midclamp 14 0.1 1 OF THEOCRC.E IBC&R401.3 0, Endclamp 12 0.1 0.7 N L-Foot 16 0.2 3 Rail 92eA' M650 87 QUICK MOUNT BASE T1 Le 0 TYP.ATTACHMENT POINT 9 QUICK MOUNT 4 EXISTING TILE HOOK QUICK MOUNT PV"SYST. REVISIONS: Splice bars ROOF DECKING W/5/16"x 3 1/2"S.S. LAG. Footings 36 MATERIAL WITH 21/2"THREAD EMBEDMENT INTO RAFTER Lbs EXISTING ROOF LAG CENTERED IN ROOF oarea I Array 177 Sq.ft- MEMBER MEMBER DRAWN ev: ND JOB N0: S209 Lbs. per SQFT 3.1 Lbs/sq.ft. DATE: 07/05/2016 Lbs. per Standoff 34.4 Lbs. RACKING PLAN/ DETAILS OSOLAR MODULE MOUNTING DETAIL -SHEET: SCALE: NTS PV-3 PERMANENT SIGNAGE NOTES: 1. MARKINGS WILL BE PROVIDED IN ACCORDANCE WITH THE y l CAL-FIRE SOLAR PHOTOVOLTAIC INSTALLATION GUIDELINE. (n 2. MATERIALS USED FOR MARKING MUST BE WEATHER w RESISTANT.IT IS RECOMMENDED THAT UNDERWRITERS Z LABORATORIES MARKING AND LABELING SYSTEM 969(ILL 969)BE USED AS STANDARD TO DETERMINE WEATHER W RATING. 3. AT THE"CAUTION:SERVICE DISCONNECT. SYSTEM CONNECTED" O AT THE MAIN SERVICE DISCONNECT. / 4 MARK"CAUTION SOLAR CIRCUIT, FOR THE DIRECT CAUTION CURRENT CONDUIT,RACEWAYS,ENCLOSURES,CABLE ASSEMBLIES AND JUNCTION BOXES. 5. MARKING SHALL BE RED BACKGROUND,WHITE LETTERING,MINIMUM 3/8-LETTER HEIGHT,ALL CAPITAL LIC:971122 D)AND POWER TO THIS BUILDING IS LETTERS,ARIELATHER OR LARSTANT FONT MATERIAL REFLECTIVE,WEATHER RESISTANT MATERIAL SUITABLE FOR THE ENVIRONMENT.(DURABLE ADHESIVE MATERIALS / "\ ALSO SUPPLIED FROM THE MAY MEET THIS REQUIREMENT). 6.FOLLOWING SOURCES WITH PV SOLAR MARKING IT,RACEWAYS,ENCLOSURES, ENCLOSULL RIORES,AND EXTERIOR DC CONDUIT,RACEWAYS,ENCLOSURES,AND CABLE ASSEMBLIES,AND JUNCTION BOXES TO ALERT THE FIRE DISCONNECTS AS SHOWN SERVICE TO AVOID CUTTING THEM. DISCONNECT LU aN o AC DISCONNECTS BREAKER IS BACKFED LOCATED ON ROOF PV SOLAR ARRAY WITH DO NOT RELOCATE O w MICRO INVERTERS F- U O >- M a_ In 3 m m ILU U) , t iL t� � t� W^^ j� 04 y Z,O: SERVICE POINT, UTILITY METERING, & DISCONNECT BREAKER `� , ,L W �t a) y m c N �oQROFESS/pNgl � W t6 0) AC OUTPUT CURRENT: 11 AMPS No. C58724 N NOMINAL AC VOLTAGE: 240 VOLTS � Exp.3-31-17 � CIVIV lF pF C AIIF REVISIONS: SERVICE DIRECTORY: July 06,2016 www. Loyd W Martin .com Solar Structures Engineering JOB NO BY: No JOB NO: S209 #2016-2204 Structural Only DATE: 07/05/2016 PLACARDS SHEET: PV-4 �oQR0WESS/49` Enphase S280 Microinverter//DATA 5 O T 2 INPUT DATA(DC) ~� 5280-60-LL-2-US,5280-60-LL-5-US Enphase M icroinverte rs rn rT No. C58724 9n Recommended input power(STC) Up to 360 W Enphase * Exp.3-31-17 * Maximum input DC voltage 48 V `r�' C f y)v \P Peak power tracking voltage 27 V-37 V 9TF pF c Ao Operating range 16 V-48 V July 06,2016 Min/Max start voltage 22 V/48 V www. Loyd W Martin .coin Max DC short circuit current 15A _ Solar Structures Engineering OUTPUT DATA(AC) 208 VAC 240 VAC #2016-2204 Structural Only Output power rated/peak 270/280 VA 270/280 VA - _--. Nominal voltage/range' 208 V/183-229 V 240 V/211-264 V [e] enpl L,lase Contmous output current 1.30A 1.13A E N E R G Y Nominal frequency/range 60/57-61 Hz 60/57-61 Hz At Extended frequency range 57-63 Hz 57-63 Hz -^- Power factor at rated power 1.0 1.0 Maximum units per 20 A branch circuit 21 (three phase,balanced) 14(single phase) -- Maximum output fault current 663 mA rms,100 ms 663 mA,100 ms Power factor(adjustable) 1 /0.7 leading...0.7 lagging 110.7 leading...0.7 lagging - EFFICIENCY 208 Vac 240 Vac CEC weighted efficiency 96.5% 97.0% Peak inverter efficiency 96.8% 97.3% o 0 0 0 MECHANICAL DATA o 0 Ambient temperature range -40°C to+65°C Designed for high-powered, 60-cell modules, the advanced grid-ready Enphase®S280 Microinverter is built o 6 Connector type S280-60-LL-2-US:MC4 0 0 0 on the fifth-generation platform and achieves the highest efficiency for module-level power electronics along S280-60-LL-5-US:AmphenolH4 with cost per watt reduction. With its all-AC approach,the S280 simplifies design and installation for 280 VA Dimensions(WxHxD) 172 mm x 175 mm x35 mm(without bracket) installations, and delivers optimal energy harvest.The S280 is compatible with storage systems, including weight 1.8 kg(4 lbs) ° 00 ° Do " „ c o °°000 battery management systems. Cooling Natural convection-No fans L °° 00000 Enclosure environmental rating Outdoor-NEMA6 000000 The Enphase S280 integrates seamlessly with Engage Cable, the Envoy-S, and Enlighten®, Enphase's FEATURES °4°O °°°°° monitoring and analysis software. compatibility 60-cell PV modules Communication Power line Integrated ground The DC circuit meets the requirements for ungrounded PV arrays in PRODUCTIVE SIMPLE AND RELIABLE ADVANCED GRID READY NEC 690.35.Equipment ground is provided in the Engage Cable.No additional Optimized for higher-power, No GEC needed for microinverter - Complies with fixed power factor, GEC or ground is required.Ground fault protection(GFP)is integrated into the - pp P microinverter. 60-cell modules No DC design or string calculation voltage and frequency ride-through Monitoring Enlighten Manager and MyEnlighten monitoring options -Maximizes energy required requirements compliance UL1741/IEEE1547,FCC Part 15 Class 6, production More than 1 million hours of testing -Remote updating to respond to CAN/CSA-C22.2 NO.0-M91,0.4-04,and 107.1-01 - Minimizes impact of shading, Industry-leading warranty, changing grid requirements dust,and debris up to 25 years -Configurable for Variable grid profiles 'Nominal voltage range can be extended beyond nominal if required by the utility. like Hawaiian Electric Company (HECO) Rule 14H, California Rule 21, and others enphase° SA® To learn more about Enphase Microinverter technology, Le] enphasee E N E R G Y C us visit enphase.com t. E N E R G Y 0 2015 Enphase Energy.All rights reserved.All trademarks or brands in this document are registered by their respective owner. MKT-00107 Rev 1.1 �� LG NeON"2 � Innovation for 1 Lifes Good Better Mechanical Properties Electrical Properties(STC*) Calls 6x 10 Module Type —.......— 315 W _ Cell Vendor � LG MPP Voltage(Vmpp) __—.,.,,_ 33.2 -----®®®® Cell Type .. _MonocrYstalline/N type MPPC n[(J Pp) 9.00 .. Cell Dimensions 15675 x 156/5 mm/6 nches_ - Open Circuit Voltage(Voc) 6 Diof mensions 12( 1640x100xne 40 in Sort Ciawt Current(Isc)Mutt 1002 Oimensions(L x W x H) 1640x 1000 x 40 mm ModuleEfficiency(Y) ------® Q(✓,OF ESS/� _ 6457x3937 x157 inch---- Operating system Voltage 9 Temper ure 40 9 Front load 6000 Pa/126 p5f Q Maximum System Voltage(tl) 1000 --®--® C Rear Load 0 Pa{113 Q aximum Se ries Fuse Rating(A) 20 . 17. 37 M __ ..... l y Weight 170305kg/37 48 3 1.1 16s Power Taleranre(Y) 0 3 -----®® NG. C58724 Isna n" Connector Type MC4 MC4 Cpmass Diodes — •Src($vMaNT cmau dry taoowmr Mduii 1 uu xscnrd 5 IP6/wth3 ass Oiodez •1^e d I>un'rr°utpurumeasundana mu mineagLGnmw tasmieew ausdure dnrreuon. 1 lunenon Box eYP •rn tydw M ,mxum ef6a..ryxxoo w{m°.awo°r°l Due w{m s x.os Exp.3-31-07 7C Length of Cables 2x 1000 mm/2x3937inch Glass High TimmunissionTempere_d Glass ��,9 CIV(� ��\P pipe --- ��� ��� Modrzed Aluminum — Electrical Properties(NOCT ) OF C Al\F� Module Type 315 W__..,._., Certifications and Warranty Maximum Power(Pmaxr) 230 July 06,2016 —.._------- Certifications IEC61215,1EC61730-1/-2 MPPVoltage www. Loyd W Martin .eom iE C62716(Ammama Ties) -- MPPCu a t(Impp) 758 LG Ne®N'2 ICI Solar Structures Engineering EC 61701(Sat Min[onosionTest) Open Circ kVolGge Noc) ___ _ 3/6_ 9 g ISOg001 short Circuit current(Isc) &OB #2016-2204 Structural Only _ UL1703 ___--- N�M�maiop xn,t .cop ww:imda reaoowm°. mbmt�p t� 20z Wsp eal,M= Madole Fire Performance(USA) _ Type 2(UL 1703) Fire Rating(for LANAOA) CIassC(ULC/0RO C1703) Dimensions(mm/in) Product Warranty t 2 years Q '°°'°' '°°'°" LG's new module,LG NeON-2,adopts Cello technology ! Output Warranty of Pmax Unearwarranty`Q Cello technology replaces 3 busbarswith 12 thinwires AIMOAp Paooucr •t1ln Xar96V 2)Afterx ,ynu afi%pamwd xgamtian 3)a36%(tc25y�s �� 60 cell to enhance power output and reliability.LG NeONTM 2 V E� D E l C aQl� urs, �ti/" Temperature Characteristics " demonstrates LG's efforts to increase customers values °°"°� beyond efficiency.It features enhanced warranty,durability, lnlertek wauxsra sse96,as Mocr 4fi x 3°[ es ,m it performance under real environment.and aesthetic =^^ .omK pmpp .0.38%rC0 �•+•'�•• design suitable for roofs. 0.2 vac - 8%r[ ... Yd ------ Isc 0.03%/'C err Characteristic Curves Enhanced Performance Warranty \-.-i High Power Output C 1• LG NeCINTM 2 has an enhanced performance warranty. r. Compared with previous models,the LG NeONTM'2 amI mvw ...w.. I •..r r The annual degradation has fallen from-0.7%/yr to s has been designed to significantly enhance its outputs a n oo ry woI doo'.a vn�<a -0.6%/yr.Even after 25 years,the cell guarantees 2.4%p efficiency,thereby making it efficient even in limited space. ,+ more output than the previous LG NeON-modules. d9^ .aow f� t re xml aoow !J Aesthetic Roof ® Outstanding Durability m --- m om iow rsm mm as.ro xim ssm. w um aAre•m 3 11 f�f )j LG NeON-2 has been designed with aesthetics in mind; With its newly reinforced frame design"LG has extended thinner wires that appear all black at a distance. the warranty of the LG NeON-2 for an additional _ .........__&I ____...._ The product may help increase the value of 2 years.Additionally,LG NeONna 2 can endure a front a a property with its modem design. load up to 6000 Pa,and a rear load up to 5400 Pa W'i Better Performance on a Sunny Day Double-Sided Cell Structure The rear of the cell used in LG NeC)N° LG NeON-2 now performs better on sunny days thanks a ra 2 will contribute to m a - to its improved temperature coefficienry. generation,just:like rite front;the light beam reflected from >o! R ? e il� III III' the rear of the module is reabsorbed to generate a great ^'--------- -----T—' rim amount of additional power. 5° to m •txeebram.6emem u+e rmurdvw mwmayl9nmaet9hda. ct ® LG LG Secawn Ave, Inc Englewood Odfs.Nl O]632 OS N2.60.CGF-EN-50427 mrlun9e withau[narirc About LG Electronics Lifds Geed I Copyright 02015 LG EleamnimAt rights reserved inmvadon fara0etterufe Comamlgsolar@Ige.mm i Ot{04/2015 rr LG Elecuvnim Is a global player who has been commued to expanding Its capacity,based on solar energy besneas as its future growth engine.We embarked on a solar energy saurm research pmgrmn in www m -+— lgsolamsaca n 1985,supported by W Gesup's rich experience in semi-conductor.LCq chemistry,and matem hi industry.We surcessfollly released the first Mono X®series to the market in 2010,which were exported to 32 + munoles in the fallowing 2years,thereafter In 2013,W NeON"(inewn.ly known as Mono X-NeON)won 9mersalar Awnd1 which proved LG Is the leader of innowtion in the industry. Quick Hook' SS & LS 4 Instructions for Installing Standard and Low Height Hooks for Side Mount Rails Quick Hook" SS & LS Installation Tools Required: stud finder, tape measure, utility knife, drill with 7/32" bit, impact drill with 1/2" socket, Standard and Low Hei ht Hooks for Side Mount Rails caulking gun, appropriate sealant compatible with roofing materials,roofing bar,hand broom,stapler,18"wide piece of g underlayment or materials for 3-course method during deck flashing installation. r _ 4 i - CCCRemove the tile at selected location of the mount. Rest the base plate over center of rafter and mark Connect hook to base plate and drive lag screws Locate and mark the center of the rafter. center of holes.Drill two 7/32"pilot holes and fill into rafterthrough the two hotesto a solid,snug fit. . . with sealant compatible with roofing materials. DO NOT over tighten lag screws,this may compro- mise their holding strength. 25. MM Slide hook into desired position within valley of the Carefully clean the undertayment then apply bead of Flashing must be sealed to deck using three-course - tile.The hook must not overhang the side edges of sealant compatible with roofing materials in the shape method with mastic and mesh,see page 2,or under- the base plate. Drive self-tapping screw to secure of an upside down U on the backside of the sub-flash- layment bibbing.When bibbing,the upper edge of the hook to base using a R3 Phillips drive bit. Do not ing,see example on page 2,and install flashing over bib should extend 3" under the course of underlay- . mount.Fasten sub`fiashing to deck with one roofing ment above the flashingand the bib should be wide use impact gun on screw, me o overlap ses a as . nail in each topmmer.Do not nail bottom comers. nought dapthe flashing by 3" act u e o d o f r Follow all the directions of the rack --/ manufacturer.manufacturer as weU as the module Ali roofing manufacturers' written o00ESS/pyq ,' instructions must also be followed W lby anyone modifying .. Please consult the f manufactur- Installation Instructions y 2 "' •� �; C587 touching the roof. Exp.3-31-17 * 4 : sj9� C I y 1\ Cut a clearance notch in the weather guard lug Bolt the side-mounted mil of your choice to the OFCjA using a grinder with tuck point blade.Make sure the hook,using therail manufacturer's hardware. C��u i c k Mount the seats back down in it's original position.Leave , July 06,2016 at least'h"of tile to prevent breaking through. RESPECT THE ROOF www. Loyd W Martin .corn B17.2.3-34 Jun-2015,Rev Solar Structures Engineering ' #2016-2204 Structural Only