Loading...
PMT15-02123 EsGil Corporation i In alartnersfiip with government for aluiffing Safety DATE: 7/29/2015 ❑ APPLICANT ❑ JURIS. JURISDICTION: Menifee ❑ PLAN REVIEWER ❑ FILE PLAN CHECK NO.: PMT15-02123.E SET: I PROJECT ADDRESS: 29103 Stonybrook Ln. PROJECT NAME: JOSE GONZALEZ 3,000 Watts Solar Photovoltaic System ® The plans transmitted herewith have been corrected where necessary and substantially comply with the jurisdiction's building codes. ❑ The plans transmitted herewith will substantially comply with the jurisdiction's codes when minor deficiencies identified below are resolved and checked by building department staff. ❑ The plans transmitted herewith have significant deficiencies identified on the enclosed check list and should be corrected and resubmitted for a complete recheck. ❑ The check list transmitted herewith is for your information. The plans are being held at Esgil Corporation until corrected plans are submitted for recheck. ❑ The applicant's copy of the check list is enclosed for the jurisdiction to forward to the applicant contact person. ❑ The applicant's copy of the check list has been sent to: ® EsGil Corporation staff did not advise the applicant that the plan check has been completed. ❑ EsGil Corporation staff did advise the applicant that the plan check has been completed. Person contacted: Telephone #: Date contacted: (by: ) Email: Fax #: Mail Telephone Fax In Person ❑ REMARKS: By: Eric Jensen (SA) Enclosures: EsGil Corporation ❑ GA ❑ EJ ❑ MI3 ❑ PC 7/24 9320 Chesapeake Drive, Suite 208 ♦ San Diego, California 92123 ♦ (858) 560-1468 ♦ Fax(858)560-1576 Version #48.2 06.5olarCity CITY OF MENIF BUILDING AND', July 24,2015 PLAN APPROVA Project/Job # 9257497 1 RE: COVER LETTER REVIEWED B1(_,. Project: Gonzalez Residence 29103 Stonybrook Ln, Menifee,CA 92584 *Approval of these plans sh approval of,any violadon o To Whom It May Concern, regulations and ordhwm A jobsite survey of the existing framing system was performed by a site survey team from SolarCity. Structural review was) 01oompledon site observations and the design criteria listed below: Design Criteria: -Applicable Codes = 2013 CBC,ASCE 7-10,and 2012 NDS -Risk Category = II -Wind Speed = 110 mph, Exposure Category C Ground/Roof Snow Load = 0 psf - MPl: Roof DL = 14 psf, Roof LL= 20 psf M On the above referenced project,the components of the structural roof framing impacted by the installation of the PV assembly have been reviewed. After this review it has been determined that the existing structure is adequate to withstand the applicable roof dead load, PV assembly load,and live/snow loads indicated in the design criteria above. The structural roof framing and the new attachments that directly support the gravity loading and wind uplift loading from PV modules have been reviewed and determined to meet or exceed structural strength requirements of the 2013 CBC. Please contact me with any questions or concerns regarding this project. _Co NO. 722 4 M inn John A. Calvert, P.E. Expires a'ib -V Professional Engineer T: 888.765.2489 x51508 Digitally signed by sT� C 1 V I Q email: jcalvert@solarcity.com John Calvert "Z CP Date:2015.07.24 11:01:21-06'00' 3055 Clearview Way San Mateo, CA 94402 1 (650)638-1028 (888)SOL-CITY r(650)638-1029 solarcity.com 07.24.2015 SolarCit PV System Structural Version #W 1° Design Software SAFETY C ,L PROJECT INFORMATION &TABLE OF CONTENTS Project Name: Gonzalez Residence AHJ: Menifee Job Number: 9257497 Building Code: 2013 CBC Customer Name: Gonzalez,Jose A Based On: IRC 2012/IBC 2012 Address: 29103 Stonybrook Ln, ASCE Code: ASCE 7-10 City/State: Menifee, CA Risk Category: II ° Zip Code 92584 Upgrades Req'd? No Latitude/ Longitude: 33.679800 -117.189480 Stamp Req'd? Yes ill tbecongr SC Office: Murrieta PV Designer: Sarah Fulmer am provisionsi This set of appi Cover Letter 1 Project Information, Table Of Contents, &Vicinity Map 2 Seismic Considerations 3 Structure Analysis (Loading Summary and Member Check) 4 Hardware Design (PV System Assembly) 5 1.711 Go •o. . • •. )2015 Google Imagery C2015 , •italGlobe, USDA Farm 96&kftAqency 29103 Stonybrook Ln„ Menifee, CA 92584 Latitude: 33.6798, Longitude: -117.18948, Exposure Category: C SEISMIC CONSIDERATIONS EPART Seismic Design Criteria (per USGS Seismic Design Code ASCE 7-10 Latitude 33.6798 Longitude -117.1895 SRA at Short Period Ss 1.S01 USGS SRA at is Period S, 0.600 USGS Soil Site Class D IBC 1613.5.2 Seismic Design Category SDC D USGS Seismic Check Required(Ss>_ Yes IBC1613.1 dtobeap 0.4 &SDC > D the federdl oved plans n ALTERATION LATERAL DESIGN 10% EXCEPTION CHECK Weight of Proposed PV System Area Dead Load Weight PV System Weight 159 sf 3 psf 478 Ibs Total Weight of PV System W(PV) 478 Ibs Weight of Roof on Existing Building Sum Area of MPs with PV 392 sf Portion of Roof Weight Area I Dead Load Wei ht Roof 392 sf 14.0 psf 5 485 Ibs Ceiling 392 sf 5.0 psf 1,959 Ibs Interior Walls (Top Half) 317 sf 5.0 Psf 1,583 Ibs Exterior Walls Mop Half 317 sf 8.5 psf 2,692 Ibs Net Weight of Roof Under PV W(exist) 11,719 Ibs Check% Increase of Roof Weight / Seismic Shear Load Increase of DCR of Lateral 4.1"/0 Force Resisting System I W(PV)1 W(exist) Increase Seismic Shear Load < 10%, -> [OK] IBC Sect. 3404.4 Note: Seismic base shear is directly proportional to roof weight. STRUCTURE ANALYSIS - LOADING SUMMARY AND MEMBER CHECK - MP1 Member Properties Summary NT MPI Horizontal Member Spans Rafter Properties Overhang 1.16 ft Actual W 1.50" Roof System Properties San 1 6.97 ft Actual D 3,50" Number of Spans w/o Overhang) 4 Span 2 5.06 ft Nominal Yes Roofing Material Flat Tile Roof Span 3 2.28 ft A 5.25 in.-2 Re-Roof No Span 4 2.3-ft S, _3 �Lq Plywood Sheathing Yes San 5 I 5.36 in.^4 Board Sheathing None Total Span 17.83 ft TL DefPn Limit 120 Vaulted Ceiling No PV 1 Start 1.33 ft Wood Species DF It for,orii Ceiling Finish 1/2"Gypsum Board PV 1 End 10.83 ft Wood Grade #2 Rafter Slope 180 PV 2 Start Fb 900 psi gate or City Rafter Spacing 24"O.C. PV 2 End F„ 180 psi , stbe kept Top Lat Bracing Full PV 3 Start E 1600000 psi Sot Lat Bracing At Supports PV 3 End Em;" 580000 psi Member Loading Summary Roof Pitch 4112 Initial I Pitch Adjust I Non-PV Areas PV Areas Roof Dead Load DL 14.0 psf x 1.05 14.7 psf 14.7 psf PV Dead Load PV-DL 9.0 psf x 1.05 9.5 psf Roof Live Load RLL 20.0 psf x 1.00 20.0 psf Live/Snow Load LL/SL"2 Total Load (Governing LC TL 14.7 psf 24.2 psf Notes: 1. ps = Cs*pf;Cs-roof, Cs-pv per ASCE 7 [Figure 7-2] 2. pf=0.7(Ce)(C[)(Is)py; Ce=0.9, 4=1.1,I,=1.0 Member Design Summary (per NDS) Governing Load Comb CD CL + CL - CF Cr D 0.9 1.00 0.96 1.5 1.15 Member Analysis Results Summary Maximum Max Demand @ Location Capacity DCR Load Combo Shear Stress 43 psi 1.2 ft. 162 psi 0.27 D Bending (+)Stress 715 psi 4.1 ft. 1397 psi 0.51 D Bending (-) Stress -845 psi 8.1 ft. -1340 psi 0.63 D Total Load Deflection 0.17 in. I L/512 4.3 ft. 0.73 in. I L/120 0.23 D CALCULATION OF DESIGN WIND LOADS - MP1 Mounting Plane Information Roofing Material Flat Tile Roof PV System Type SolarCity SleekMountT" Spanning Vents No Standoff Attachment Hardware Mighty Hook HDG FT Roof Slope Rafter Spacing 24"O.C. Framing Type L Direction Y-Y Rafters ,TE Purlin Spacing X-X Purlins Only NA Tile Reveal Tile Roofs Only 15" Tile Attachment System Tile Roofs Only SM Span n Standin Seam/Trap Seam/Trap Spacing SM Seam Only NA 'n the Wind Design Criteria Wind Design Code ASCE 7-10 Wind Design Method Partially/Fully Enclosed Method Basic Wind Speed V 110 moh Fig. 26.5-1A Exposure Category C Section 26.7 Roof Style Gable Roof Fig.30.4-2A/B/C-SA/B Mean Roof Height h 25 ft Section 26.2 Wind Pressure Calculation Coefficients Wind Pressure Exposure K� 0.95 Table 30.3-1 Topographic Factor Kn 1.00 Section 26.8 Wind Directionality Factor Kd 0.85 Section 26.6-1 Importance Factor I NA Velocity qh = 0.00256 (Kz) (Kzt) (Kd) (VA2) tY Pressure qh 24.9 psf Equation 30.3-1 Wind Pressure Ext. Pressure Coefficient U GC D -0.88 Fig.30.4-2A/B/C-SA/B Ext. Pressure Coefficient Down G Down 0.45 Fig.30.4-2A/B/C-5A/B Design Wind Pressure p p - qh (G ) Equation 30.4-1 Wind Pressure Up p„ -21.8 psf Wind Pressure Down P(d.wnl 16.0 psf ALLOWABLE STANDOFF SPACINGS X-Direction Y-Direction Max Allowable Standoff Spacing Landscape 72" 60" Max Allowable Cantilever Landscape 24" 24° Standoff Configuration Landscape Not-Staggered Max Standoff Tributary Area Trib 30 sf PV Assembly Dead Load W-PV 3.0 psf Net Wind Uplift at Standoff T-actual -341 Its Uplift Capacity of Standoff T-allow 500 Ibs Standoff Demand/Capacity DCR 68.1% X-Direction Y-Direction Max Allowable Standoff Spacing Portrait 48" 60" Max Allowable Cantilever Portrait 20" 24rr Standoff Configuration Portrait Not-Staggered Max Standoff Tributary Area Trib 20 sf PV Assembly Dead Load W-PV 3.0 psf Net Wind Uplift at Standoff T-actual -227 Ibs Uplift Capacity of Standoff T-allow 500 Ibs Standoff Demand/Capacity DCR 45.4%