Loading...
PMT14-00561 City of Menifee Permit No.: PMT14-00561 _ 29714 HAUN RD. Type: Residential New ' r'tCCEL^>. MENIFEE, CA 92586 MENIFEE Date Issued: 06/07/2014 PERMIT Site Address: 29162 NECTARINE ST, MENIFEE, CA Parcel Number: 333-621-013 92585 Construction Cost: $252,468.77 Existing Use: 1 &2 Family Residence Proposed Use: 1 &2 Family Residence Description of NSFR Work: 2033/665 LOT 147 Owner Contractor LENNAR HOMES OF CALIFORNIA, INC LENNAR HOMES OF CALIFORNIA INC 980 MONTECITO DR STE 302 25 ENTERPRISE MENIFEE, CA 92879 ALISO VIEJO, CA 92656 Applicant Phone: 9493498000 LENNAR HOMES OF CALIFORNIA, INC. License Number: 728102 MENIFEE, CA Fee Description Ott Amount l$1 GREEN FEE 1 11.00 ISM, P J2E$IP„ENTIA4r"` �13 � a�26' 0 New Construction Permit Fee 1 1,161.36 $1,225.36 The issuance of this permit shall not prevent the building official from thereafter requiring the correction of errors in the plans and specifications or from preventing building operations being carried on thereunder when in violation of the Building Code or of any other ordinance of City of Menifee.Except as otherwise stated,a permit for construction under which no work is commenced within six months after issuance,or where the work commenced is suspended or abandoned for six months,shall expire,and fees paid shall be forfeited. AA Bldg_Permit_Template.rpt Page 1 of 1 CITY OF MENIIF EE PLCK No: P 1 29714 Haun Road Date: aj / Date: Menifee, CA 92586 Phone: (951)672-6777 moun): _ mount: Fax:(951)679-3843 Ck#. Ck#; Building Combination Permit To Be Com leted By Applicant Legal Description: T31582-1 Eldorado l Meridian Penning Case: F: L: Rt: . Prop Aid esY 01? .)_ Aor's Parcel Number: ProJect/1's � ssess �✓ �� �� 'MOT-at Eldorado I Meridian Phase 1B unit#: Floor#: Name: Lennar Homes of California, Inc. Phone No.951.207.3045 Fax No. Property Address: Owner 98 Monte Drive,State 302 Corona 92879 unit Num x r Zip code Email Address:: Name:Am Williams Phone No. Fax No. Y 951.207.3045 Applicant Address: Same as above Unit Number Zip Code Email Address: amy.witliams@lennar.com Name; Phone No. Fax No. Contractor Address: Ciry Slate Zip Cade Contractor s y Bustin tense o. Contractor's Ctly Slate or Califcmia License No. Classification: 72a1oz B Number of Squares: - Square Facing• I G Description of Work: Si Famil side 1 cost of work: 5a Applicant's ignatur' ��.__• Date: To.Bo:Completed By:City Staff Only:.; Indicate As R-Recalved or N/A-Not Applicable 5 Completes sets at fully dimensioned,drawn to sale plans which include: 1 set of documents which Include ❑ Title Sheet ❑ Elevations ❑ Electdral Plan ❑ Gee Tech/Solis Report(on ad only) ❑ Plot!SRe Plan ❑ Roof Plan ❑ Mechanical Plan ❑ Title 24 Energy(on a Y:x 71) ❑ Foundation Plan ❑ Cross Section ❑ Plumbing Plan ❑ Structural Calculations ❑ Floor Plan ❑ Slruclurel Framing Plen&Details ❑ Shoring Plan El Single Line diagram❑ Sound Report-Reside for elec.services over 400 AMP ntial Class Code: Indicate New Construction Alteration' Addition' Means/Methods Work Type: Repair Retrofit' Revlsionto Exisling Permir Required? YES NO Proposed Building Use(s): Existing Building Use(s): #Buildings: #Units: N Stories: Will the Building Have a Basement? Y of N Bldg.Code Occupancy Group Indicate indicate if Indicate all Geo-tech.Ham.Zone At mplPro act Construction Sprinklared YES or NO that apply Coastal Zone Completion: PP Y� Type(s): Colo YES or NO Noise Zone Required? Listed on Histode Resources inventory CITY PLANNING STAFF ONLY APPROVALS: I Costal Commiss Arch.Review Board Landmark Comm. Planning Comm.Zoning Administrator Fee Exempt: City Project Elea.Vehicle Charger Landmark Seismic Retrofit specie sse:e Expedite P2!!!!� nmalelA royal s): Child Care Clty Project Green Building Landmark Affordable Housing For Sluff Use Only Bulltlin ISafa[ I Permit Speclalls City Plennng Civil Engineering I E WM-A inn I Transportation Mgml. I Ran[Conrol THANK YOU FOR HELPING US CREATE A BETTER COMMUNITY LEGEND CRAR MASONRY A R5 FOR MAINTENANCE SPONEIBUS MERIDIAN SCE PULLBOX 5'-6'INTERIOR VINYL FENCE ® (BELOW GROUND) ((SEE CCBR'S FOR MAINTENANCE RESPON5IBLITIE5) m 5CE hANDHOLE TUBULAR STEEL FENCE tea (� (BELOW GROUND) ' IEECC4RIBLIFOR MAINTENANCE MENIFEE HILLS ® HOU5E METER LOCATION VERIZON HANDHOLE PILA5TER (BELOW GROUND) RESPONE CC<RSIBLITIES)'S FOR MAINTENANCE SITE MAP ((SE �- 0 TIME WARNER HANDHOLE 5'-G'HIGH WOOD GATE (BELOW GROUND) O (SEE CCf1<5 FOR MAINTENANCE RESPI!KrYUTIES) STREET LIGHT PROPERtt UNE FIRE HYDRANT ® WATER METER 0 CONCRETE WAlK5 AND DRIVE5 I-• ® HOMEOWNER MAINTAINED AREA •'�'•• AIR VAC VALVE 100 •�� ® MAILBOX LOT NUMBER UNIT TYPE EXTERIOR® AIR CONDITIONING UNIT 'R D NIREVER5E PLAN . .... ... . ..... 5LOPE DIRECTION a: a,.. LOT 147 PLAN I AR it 1 a. O' 1 T NECTARINE STRE`E SKr/T ) 1 IMPORTANT NOTICE: THIS PLAN IS FOR GENERAL INFORMATION ONLY AND IS INTENDED TO SHOW APPROXIMATE RELATIONSHIPS.THIS PLAN IS NOT INTENDED TO SHOW PRECISE UTILITY OR MAILBOX LOCATIONS,EXACT FIELD CONDITIONS NOR DOES IT ACCURATELY REFLECT THE SIZE OF THE UTILITY BOXES.LENNAR HOMES MAKES NO GUARANTEE AS TO THIS PLAN'S ACCURACY NOR IS ANY LIABILITY ASSUMED FOR ANY OTHER PURPOSE THAN THAT INTENDED. FOR EXACT LOCATION,IT IS STRONGLY ADVISED TO CHECK ACTUAL FIELD CONDITIONS.PLEASE PHYSICALLY INSPECT YOUR PARTICULAR HOMESITE TO COMPARE THE INFORMATION SHOWN. BUYER: DATE: PRELIMINARY BUYER: DATE: 5cale: N.T.5. LOT 147 L E N N A R® Created:May 1. 2014 29 1 G2 Nectarine Street Remsed: Menefee, California F tjW 1LA— cx)51 l CERTIFICATE OF FIELD VERIFICATION AND DIAGNOSTIC TESTING CF-4R-ENV-20 Building Envelope Sealing (Page 1 of 1 Site Address: Enforcement Agency: Permit Number: 29162 Nectarine St 14 City of Murrieta PMT14-00561 BUILDING ENVELOPE SEALING Diagnostic Testing Results CFM50H=the measured airflow in cubic feet per minute(cfm)at 50 pascals for the dwelling with air distribution registers unsealed. SLA =3.819 x(CFM50H/Conditioned Floor Area in ft-')per Residential ACM Manual Equation R3-16 Building Envelope Leakage CFM50H as measured using a blower door diagnostic device ✓ ✓ 1 Enter the blower door leakage target CFM50H value for compliance from the CF-IR(cfm). 1703 2 Enter the blower door leakage minimum CFM50H value corresponding to 1.5 SLA 799 from the CF-IR(cfin). 3. Enter the measured CFM50Hvalue from the blower door test(cfm) 1083 The leakage test passes if the measured envelope leakage CFM50H value from row is 3 less ❑f 4. than or equal to the value required for compliance from row 1,otherwise the test fails. check/enter Pass or Fail Pass Fail If measured CFM50H from row 3 is less than the minimum CFM50H value corresponding to El ✓� 5' 1.5 SLA from row 2: check/enter <1.5 SLA,otherwise check/enter>1.5 SLA <1.5 >1.5 SLA* SLA *Advisory note to builder and enforcement agency: If row 5 indicates "< 1.5 SLA",it is critical to ensure that combustion and solid-fuel burning appliances in the dwelling are provided with adequate combustion and ventilation air and vented in accordance with manufacturers'installation instructions and all applicable codes as specified by ASHRAE Standard 62.2 Section 6.4. Additional information about compliance with this requirement is given in Section 4.6.5 of the Residential Compliance Manual under the topic of Combustion and Solid-Fuel Burning Appliances. DECLARATION STATEMENT • I certify under penalty of perjury,under the laws of the State of California,the information provided on this form is true and correct. • I am the certified HERS rater who performed the verification services identified and reported on this certificate(responsible rater). • The installed feature,material,component,or manufactured device requiring HERS verification that is identified on this certificate (the installation)complies with the applicable requirements in Reference Residential Appendices RA2 and RA3 and the requirements specified on the Certificate(s)of Compliance(CF-IR)approved by the local enforcement agency. • The information reported on applicable sections of the Installation Certificate(s)(CF-6R),signed and submitted by the person(s) responsible for the installation conforms to the requirements specified on the Certificate(s)of Compliance(CF-IR)approved by the enforcement agency. Builder or Installer information as shown on the Installation Certificate CF-6R Company Name: (Installing Subcontractor or General Contractor or Builder/Owner) Lerner Homes Responsible Person's Name: CSLB License: Ryan Combe 8-General Contractor(782108) HERS Provider Data Re ist Information Sample Group 4(if applicable): O tested/verified dwelling ❑ not-tested/verified dwelling RNC11012 in a HERS sample group HERS Rater Information HERS Rater Company Name: Energy Inspectors Corporation Responsible Raters Name Responsible Rater's Signature Eric Dodd Eric Dodd Responsible Rater's Certification Number w/this HERS Provider: Date Signed: RCN 10065 9/3/2014 4:12 PM Registration Number: 414-N0W9404A-E2W0026A-E20A Registration Date/Time: er=44:12 PM HERS Provider: CHEERS 2008 Residential Compliance Forms August 2009 CERTIFICATE OF FIELD VERIFICATION AND DIAGNOSTIC TESTING CF-4R-ENV-21 Quality Insulation Installation QII - Framing Stage Checklist Pa e 1 of 2 Site Address: Enforcement Agency: Permit Number: 29162 Nectarine St City of Murrieta PMT14-00561 Quality Insulation Installation QII)Framing Stage Checklist Air barrier installation and preparation for insulation must be done at framing stage before insulation is installed.If there are any"No"answers,rows not filled out,or a signature missing then this is not a valid form and cannot be accepted by the building department or HERS rater. SPF insulation can be considered an air barrier when the bottom and top plates of vertical framing and both ends of horizontal framing,including band and rim joists,are sprayed to completely fill the cavity adjacent to and in contact with the framing to a distance of 5.5 inches away from the framing for open cell SPF(ocSPF)or 2.0 inches away from the framing for closed cell SPF(ccSPF). SPF can be considered as an air barrier with less than the above thickness when a product data or specification sheet is provided that shows the product meets an air permeance no greater than 0.02 L/s-m2 at 75 Pa pressure differential when tested in accordance to ASTM E2178 or ASTM E283. All structural framing areas shall be insulated in a manner that resists thermal bridging of the assembly separating conditioned from unconditioned space. Structural bracing,tie-downs,and framing of steel,or specific framing used to meet structural requirements of the CBC are allowed and must be insulated. These areas shall be called out on the building plans with dia rams and/orspecific design drawings indicating the R-value of insulation and fastening method to be used. ✓FLOOR AIR BARRIER ❑ ❑ El I All gaps in the raised floor to unconditioned space or to outside larger than 1/8"filled with foam or Yes No NA I caulk.LNA if SPF meets conditions above ❑ ❑ 17 All openings in the raised floor including second floors,such as under a hub where the drain Yes No NA enetrates the floor are sealed. NA if slab ongrade) ✓WALLS AIR BARRIER El Y❑es No 0 All gaps to outside larger than 1/8"filled with foam or caulk.(NA if SPF meets conditions above) ❑ ❑ All openings in top and bottom plate to the outside in interior and exterior walls, including holes Yes No NA drilled for electrical and plumbing larger than 1/8"filled with foam or caulk(NA if SPF meets conditions above) o ❑ Yes No y�.. Rope caulk,foam gasket,or caulking bead under exterior sole plate of the home. 0 ❑ All gaps around windows and doors caulked or foamed. Low expanding foam recommended if Yes No ,r`-- "' allowed by window manufacturer.(Stuffing with fiberglass not acceptable) ATTIC INSPECTION ❑4 ❑ ❑ Attic rulers appropriate to the material installed are evenly distributed throughout attic to verify Yes No NA depth. A if SPF or batt 4❑ ❑ ❑ Number of rulers installed 9 Yes No NA Attic area(sgft) 2003.00 . 250= 9 minimum number of rulers installed. Must round up. NA if SPF or bat El ❑ Ventilation baffles installed at all eave vents to prevent air movement under or into insulation. Yes No NA A if SPF meets conditions above)(NA ifunvented attic 0 ❑ ❑ Net free-ventilation area of the eave vent maintained from eave vent,past insulation,to attic space. Yes No NA A if no eave vents or SPF ✓ CEILING AIR BARRIER © ❑ ❑ All draft stops in place to forma continuous ceiling air barrier no gaps larger than 1/8". (NA if SPF Yes No NA meets conditions above 0 ❑ ❑ All dropped ceilings/soffits covered with hard covers. Gaps around or in the hard cover larger than Yes No NA 1/8"filled with foam or caulk (NA if no drops) El ❑ ❑ Openings around flue shafts fully sealed with flashing and caulked. NA if no flue shafts Registration Number: 414-N0019404A-E2100012A-E21A Registration DatelTime: 91312014413pM HERSProvider: CHEERS 2008 Residential Compliance Forms May 2012 CERTIFICATE OF FIELD VERIFICATION AND DIAGNOSTIC TESTING CF-4R-ENV-21 Quality Insulation Installation QII) -Framing Stage Checklist (Page 2 of 2) Site Address: Enforcement Agency: Permit Number: 29162 Nectarine St City of Murrieta PMT14-00561 Yes No NA ❑ ❑ ❑ Piping shaft openings fully sealed and caulked. (NA if no pipe shafts Yes No NA P P ) El ❑ ❑ Penetrations through the ceiling air barrier from electrical boxes in the ceiling,fire alarm boxes,etc.sealed with Yes No NA caulk or foam. (NA if no penetrations) ❑✓ ❑ ❑ All duct chases,fireplace chases,and double walls sealed air tight at the ceiling level. All gaps into shafts larger Yes No NA than 1/8"filled with foam or caulk(NA if none of the above or SPF meets conditions above) ✓ GARAGE/CEILING AIR BARRIER FOR TWO STORIES no conditioned space over ara e) ❑ ❑ O Air barrier installed atjoists in garage to house transition (between floors). No gaps larger than 1/8" Yes No NA allowed. A if SPF meets conditions above) ✓ GARAGE/CEILING AIR BARRIER FOR TWO STORIES conditioned space over garage) ❑ ❑ © I£insulation is to be installed at subfloor then subfloor has no gaps over 1/8". Air barrier installed at Yes No NA joists in garage to house transition (between floors). Use of SPF meeting conditions above as the air barrier satisfies the requirement to seal the gaps. ❑ ❑ El If insulation is to be installed at ceiling of garage then ceiling and joists to the outside have no gaps Yes No NA over 1/8". (NA if SPF meets conditions above or no conditioned space over garage.) DECLARATION STATEMENT • I certify under penalty of perjury,under the laws of the State of California,the information provided on this form is true and correct. • I am the certified HERS rater who performed the verification services identified and reported on this certificate(responsible rater). • The installed feal'm'e,material,component,or manufactured device requiring HERS verification that is identified on this certificate (the installation) complies with the applicable requirements in Reference Residential Appendices RA2 and RA3 and the requirements specified on the Certificate(s) of Compliance(CFAR) approved by the local rotor cement agency. • The information reported on applicable sections of the Installation Certificate(s) (CF-BR),signed and submitted by the person(s) responsible for the installation conforms to the requirements specified on the Certificate(s) of Compliance(CFAR)approved by the enforcement agency. Builder or Installer information as shown on the Installation Certificate CF-6R) Company Name and Phone Number: (Installing Subcontractor or General Contractor or Builder/Owner) Masco Contractor Services of California, Inc. Responsible Persons Name: CSLB License: Monte Renshaw C-2 Insulation(221517) HERS Provider Data Registry Information Sample Group#(if applicable): ❑✓ tested/verified dwelling ❑ not-tested/verified dwelling RNC11012 in a HERS sample group HERS Rater Information HERS Rater Company Name and Phone Number. Energy Inspectors Corporation Responsible Ratcr's Name Responsible Rater's Signature Eric Dodd Eric Dodd Registration Number:414-Noo1 9404A-E2100012A-E21A Registration DatelTimc: 9i3120144:13 PM 1-IERSProvider: CHEERS 2008 Residential Compliance Forms May 2012 CERTIFICATE OF FIELD VERIFICATION AND DIAGNOSTIC TESTING CF-4R-ENV-22 Quality Insulation Installation QII -Insulation Stage Checklist (Page I of 3 Site Address: I'rnforcement Agency: Permit Number: 29162 Nectarine St City of Murrieta PMT14-00561 All structural framing areas shall be insulated in a manner that resists thermal bridging of the assembly separating conditioned from unconditioned space. Structural bracing,tie-downs,and framing of steel,or specialized'framing used to meet structural requirements of the CBC are allowed and must be insulated. These areas shall be called out on the building plans with diagrams and/or specific design drawings indicating the R-value of insulation and fastening method to be used. SPF insulation can be considered an air barrier when the bottom and top plates of vertical framing and both ends of horizontal framing, including band mud rim joists,are sprayed to completely fill the cavity adjacent to and in contact with the'framing to a distance of 5.5 inches away from the framing for open cell SPF(ocSPF)or 2.0 inches away from the framing for closed cell SPF(ccSPT. SPF can be considered as an air barrier with less than the above thielaness when a product data or specification sheet is provided that shows the product meets an air penneanee no greater than 0.02 L/s-m2 at 75 Pa pressure differential when tested in accordance to ASTM E2178 or ASTM E283. Closed cell and open cell manufacturers claim various R-values per inch. In California the maximmn R-value that can be claimed for ccSPF is an R-value of 5.8 per inch and for ocSPF is an R-value of 3.6 per inch. IIigher R-values per inch cannot be claimed even with manufacturer data. Insulation Stage Checklist ✓FLOOR INSULATION ❑ ❑ O All floorjoist cavity insulation installed to uniformly fill the cavity side-to-side mud end-to-end,NO gaps. (NA if Yes No NA slab ongrade) ❑ ❑ ID Yes No NA Insulation in full contact with the subfloor,NO gaps. (NA if slab on grade) ❑ ❑ © Batts:cut to'fit around wiring and plumbing,or split delaminated . Yes No NA g P g p ( ) (NA if loose fill,SPF,or slab on grade) ❑ ❑ © y PP e properly supported to avoid Yes No NA Batts: shall b P p gaps,voids,and compression. (NA for other forms of insulation) ❑ ❑ E1 Yes No NA Insulation R-value same or greaterthan listed on CF-IR.(NA for slab on grade) ❑ ❑ © Gaps between studs larger than 1/9"the cavity must be filled with insulation or foam. (NA for slab on grade) Yes No NA © SPF: list the required floor cavity R-value from CF-IR,R- Determine required thickness for ccSPF NA (required R-value_/MR)=_inches),or required thickness for ocSPF(required R-value_/3.6= inches). NA for other'forms of insulation) ❑ ❑ © SPF: measure thielaress of floor insulation in 6 random areas. Minimum thickness for ocSPF shall be no more Yes No NA than''/z inch less than the required thickness listed above. Minimum thickness for ocSPF shall be no more than 1 inch less than the required thickness listed above. (NA for other forms of insulation) ✓WALL INSULATION Batts,loose fill mineral fiber,mineral wool,and cellulose: fills cavity and is in contact with air barrier. 0 ❑ ❑ ocSPF: shall completely fill cavities of 2x4 inch framing or less. Cavities greater than 2x4 inch framing Yes No NA dimensions must be filled to the thickness calculated above. ccSPF: insulation is not required to fill the cavities of trained assemblies provided the installed thickness of insulation conforms to the thickness calculated above. ❑ ❑ ❑ Double walls and bump-outs-insulation fills the cavity or additional air barrier i11st'alled in the cavity so that the Yes No NA insulation fills the cavity and in contact with the air barrier.(NA if SPF meets conditions above and meets the to tune R-value 0 ❑ ❑ Insulation installed in exterior walls adjacent to tub/shower,walls under stairs,and fireplace. Insulation required Yes No NA to fill wall cavity. Cavity required to be air tight. A if none of the above Yes No All gaps around windows and doors filled with insulation or filled with low expanding foam. ❑s No NA❑ ° Batts:no voids/depressions greater than 3/4"in ANY stud bay.(NA for other forms of insulation) ❑ ❑ ❑✓ Batts: voids/depressions less than 3/4"allowed as long as the area is not greater than 10%of the surface area for Yes No NA each stud ba .24A for other forms of insulation) ❑s No NA❑ ❑ Loose Fill: no gaps or voids. Insulation completely fills the cavity.(NA for other forms of insulation) ❑✓Yes No r,❑ � 'T' s. Gaps between studs larger than I/8"the cavity must be filled with insulation or foam. ,>„-".t Registration Number: 414-N0019404A-E2200013A-E22A Registration Date/7Fme: 913/20144ASPM HERSProvider: CHEERS 2008 Residential Compliance Forms May 2012 CERTIFICATE OF FIELD VERIFICATION AND DIAGNOSTIC TESTING CF-4R-ENV-22 Quality Insulation Installation II) -Insulation Sta a Checklist (Page 2 of 3) Site Address: Enforcement Agency: Permit Number: 29162 Nectarine St City of Murrieta PMT14-00561 Ell All Rim-joistsh El El to the outside insulated. Yes No NA (NA if no Rim-joists) 0 ❑ ❑ Insulation Installed at corner channels,wall intersections,and adjacent to tub/shower enclosures insulated to Yes No NA proper R-Value. 0 ❑ ❑ All skylight shafts and attic kneewalls insulated with minimum R-19. (NA if no skylights,kneewalls or In Yes No NA conditioned attic 0 ❑ ❑ Insulation in full contact with air barrier or wall finish for skylight shafts and attic kneewalls. (NA if no skylight or Yes No NA kneewalls) o ❑ Yes Noi012,yT,�y Installed wall insulation R-value equal to or greater than what is listed on the CF-1R. ❑ ❑ 0 SPF: insulation installed without gaps and to provide an air seal when specified as an air barrier. (NA for other Yes No NA forms of insulation 0 SPF: list the required wall cavity R-value from CF-1R,R-_. Determine required thickness for ccSPF NA (required R-value_/5.8R)=_inches),or required thickness for ocSPF (required R-value_/3.6= inches). (NA for other forms of insulation) ❑ ❑ 0 SPF: measure thickness of wall insulation in 6 random areas. Minimum thickness for ccSPF shall be no more Yes No NA than Y2 inch less than the required thickness listed above. Minimum thickness for ocSPF shall be no more than 1 inch less than the re uired thickness listed above. (NA for other forms of insulation ✓ CEILING/ROOF INSULATION PI 0 Yes No „, ; „ Gaps between studs larger than 1/8"the cavity must be filled with insulation or foam. Ye No NA ❑s 0 El Batts: no gaps/voids/depressions greater than 3/4". (NA for other farms of insulation) ❑ ❑ 0 Batts: voids/depressions less than 3/4"allowed as long as the area is not greater than 10%of the surface area for Yes No NA each stud ba . (NA for other forms of insulation) Yes No NA El ❑ ❑ Loose Fill: NO gaps or voids allowed. (NA for other forms of insulation) YES No v'a All coiling/roof insulation installed to uniformly fit the cavity side-to-side and end-to-end. ©s t Insulation in full contact with the ceiling/roof,NO gaps. Yes No❑ Insulation in contact with air barrier. ,,,,; .,„. 0 ❑ 0 Batts: cut to fit around whin or NA for other forms of insulation) Yes No NA g and plumbing, split (delaminated) ❑ ❑ 0 Bans taller than bottom chord must expand over the bottom chord or additional insulation installed so bottom Yes No NA chord not visible. (NA for other forms of insulation) ❑ ❑ 0 Batts cut to fit around ALL webbing. No gaps allowed between webbing and baits. (NA for other forms of Yes No NA insulation 0 SPF: list the required ceiling R-value from CF-1R,R-_ Required depth of insulation for ccSPF(required NA R-value—/5.8R=_inches), or required depth of ocSPF (required R-value_/3.6= inches), (NA for other farms of insulation ❑ ❑ 0 SPF: measure thickness of ceiling insulation in 6 random areas. Minimum thickness for ccSPF shall be,no Yes No NA more than inch less than the required thickness listed above. Minimum thickness for ocSPF shall be no more than 1 inch less than the required thickness listed above. (NA for other forms of insulation) 0 ❑ ❑ IIVAC Platform and Catwalks—insulated to R-value equal to ceiling R-value listed on CF-1R. If less Yes No NA I insulation installed then called out on CF-1R. (NA if no platform or catwalks) O ❑ ❑ Yes No NA Attic access gasketed. (NA of no attic access) 0 ❑ 0 Attic access insulated with rigid foam or Batt insulation using adhesive or mechanical fastener. Attic access door Yes No NA R-value equal to ceiling R-value listed on CF-1R. If less insulation installed then called out on CF-1R. (NA if no antic access) 0 ❑ 0 Recessed light fixtures covered full depth with insulation. If SPF used then other forms of insulation used to Yes No NA cover or enclose fixture in a box fabricated from Yx-inch plywood, 18 ga.sheet metal, 1/4-inch hard board or drywall. SPF or other insulation then covers light fixture to full depth. (NA is no recessed light fixtures) O ❑ ❑ All recessed light fixtures in non conditioned space are IC rated and air tight(AT). (NA if no recessed light Yes No I NA fixtures) Registration Number. 414-N00194o4A-E2200013A-E22A Registration Date/Time: 9/3120144'.18 PM HERSPI'ovlder. CHEERS 2008 Residential Compliance Forms May 2012 CERTIFICATE OF FIELD VERIFICATION AND DIAGNOSTIC TESTING CF-4R-ENV-22 Quality Insulation Installation QII) - Insulation Stage Checklist (Page 3 of 3 Site Address: Enforcement Agency: Permit Number: 29162 Nectarine St City of Murrieta PMT14-00561 ❑ ❑ ❑ All recessed light fixtures are sealed with a gasket or caulk between the housing and the ceiling. (NA if no Yes No NA recessed light fixtures) © ❑ u Ceiling insulation equal to or greater than what is listed on the CF-1R. Yes No ;.#u<11 v-;I El ❑ ❑ Loose Fill: Minimum thickness required to meet the stated R-value listed on CF-IR,Insulation rulers visible for Yes No NA verif ing the installed R-value for blown in insulation. (NA for other forms of insulation) ❑✓ ❑ ❑ Loose Fill: insulation uniformly covers the entire ceiling(or rool) area from outside of all exterior walls. (NA Yes No NA for other forms of insulation) Weight of Mineral-Fiber Loose-fill(Fiberglass,Rock wool)-Target R-value (from CF-1R)4s .Minimum O ❑ ❑ weight from insulation bag label to meet target R-value 0.75 (1b./fiz) . Weight of insulation from coring tool Yes No NA 0.75 (lb).Area of coring tool tee (ft2). Sample weight= o.7e (lb./ft�).Is sample weight(lb./ft2) the same as or realer than required weight(lb./W) (NA for other forms of insulation Thickness-ALL Loose-Fill Insulation-Target R-value (from CF-1R)49 .Required thickness from O ❑ ❑ insulation bag label to meet Target R-value for(Installed Thickness 1625 (in)),and(Settled Thickness 1e 25 Yes No NA (in)). Average Installed thickness lase in). Is Installed Thickness the same as or greater than Required Thickness? (NA for other forms of insulation) ✓ GARAGE ROOF/CEILING INSULATION FOR TWO STORIES(no conditioned space over garage) ❑ ❑No O Insulation installed at rimjoists against the air barrier in the garage to house transition (between floors). (NA if Yes NA conditioned space over garage or sin le story). ✓ GARAGE ROOF/CEILING INSULATION FOR TWO STORIES conditioned space over garage) ❑ ❑ © If insulation is installed at subBoor above garage-then insulation must also be installed at joists against the air Yes No NA barrier in the garage to house transition(between floors) and to R-value as specified on CF-lR. (NA if no conditioned space over garage or single sto ) ❑ ❑ ❑ If insulation is installed on ceiling of garage then thejoists to the outside(front,and both sides)must be Yes No NA insulated to the R-valuespecified on CF-IR..NA if no conditioned space over garaRe or single,story) DECLARATION STATEMENT • I certify undor penalty of perjury,under the laws of the State of California,the information provided on this form is true and correct. • I am the certified HERS rater who performed the verification services identified and reported on this certificate(responsible rater). • The installed feature,miter lot,component,or manufactured device requiring HERS verification that is identified on this certificate (the installation) complies with the applicable requirements in Reference Residential Appendices RA2 and RA3 and the requirements specified on the Certificate(s)of Compliance(CF-IR)approved by the local enforcement agency. • The information reported on applicable sections of the Installation Certificate(s) (CF-6R),signed and submitted by the person(s) responsible for the installation conforms to the requirements specified on the Certificate(s) of Compliance (CF-1R)approved by the enforcement agency. Builder or Installer information as shown on the Installation Certificate CF-GR - Company Name and Phone Number: (Installing Subcontractor or General Contractor or Builder/Owner) Masco Contractor Services of California, Inc. Responsible Person's Name: CSLB License: Monte Renshaw C-2 Insulation(221517) HERS Provider Data Registry Information Sample Group#(if applicable): 0 tested/verified dwelling ❑ not-tested/verified dwelling RNC11012 in a HERS sample group HERS Rater Information HERS Rater Company Name and Phone Number: Energy Inspectors Corporation Responsible Rater's Name Responsible Rater's Signature Eric Dodd Eric Dodd Responsible Rater's Certification Number w/this HERS Provider: Date Signed: RCN 10065 9/3/2014 4:18 PM Registration Number: 4+4-No019404A-e220ee13A-E22A Registration DatdTime: 91320144:18 PNI HGRSProviderr CHEERS 2008 Residential Compliance Forms May 2012 CERTIFICATE OF FIELD VERIFICATION AND DIAGNOSTIC TESTING CF-4R-MECH-20 Duct Leakage Test—Completely New or Replacement Duct S3 stem (Page 1 of 2 Site Address: Enforcement Agency: Permit Number: 29162 Nectarine St City of Murrieta PMT14-00561 Enter the Duct System Name or Identification/Tag: HVAC System:System 1 Enter the Duct System Location or Area Served: Whale House Note: Submit one Installation Certificate for each duct system that must demonstrate compliance in the dwelling. This certificate is reguiredfor compliance for completely new duct systems installed in new dwelling construction, and also for completely new or replacement duct systems in existing dwellings. For existing dwellings, a completely new or replacement duct system can also include existingparts of the original duct system (e.g., register boots, air handler, coil, plenums, etc.)if those parts are accessible and they can be sealed Duct Leakage Diagnostic Test—completely new or replacement ducts stem Enter a value for the Allowed Leakage(CFM)for the duct system leakage verification. The value entered must be the Verified Low Leakage Ducts in Conditioned Space criteria or one of the three calculated leakage rates described below. Verified Low Leakage Ducts in Conditioned Space(VLLDCS)Compliance Credit. If compliance credit Allowed for verified low leakage ducts in conditioned space is shown in the special features section of the CF-IR,the Leakage leakage to outside test method must be used to verify duct leakage(refer to RA3.1.4.3.4),and 25 CFM must be entered for Allowed Leakage. (CFM) Allowed leakage calculation—(select one calculation method from this section), Use 6%(leakage factor= 0,06)for calculations. When utilizing Low Leakage Air Handler(LLAH)credit,the allowed duct leakage may be specified by the CF-1R to be less than 6%,in which case the user-specified leakage rate must be used in the calculations below. For example,if the user-specified leakage(specified as a percentage of fan airflow)is reported on the CF-1R as 3%,then use a leakage factor of 0.03 in the calculations below. ❑ Cooling system method: Nominal capacity of condenser in Tons 4.0 x 400 x lealmge factor = 96 (CFM) 96 ❑ Heating system method: 21.7 x Output Capacity in Thousands of Btu/hr.x leakage factor= (CFM) ❑ Measured airflow method(RA3.3): . Enter measured fan flow in CFM here x leakage factor = (CFM) Enter value for Actual leakage(CFM)in the right column,from measurement using applicable duct leakage Actual pressurization test procedure from Reference Residential A Leakage P P Appendix RA3.1(CFM @ 25 Pa). CFM List Actual Leakage from duct leakage test(CFM) 55 Pass if Actual Leakage is less than Allowed Leakage RI Pass❑Fail For complete replacement of duct systems only,if the 6 percent leakage rate criteria cannot be met,a smoke test should be performed to verify that the excess leakage is coming only from a pre-existing furnace cabinet (air handler cabinet),and not from other accessible portions of the duct system. A HERS rater must verify the installation o sam ling allowed). List Actual Leakage from smoke test CFM Pass if all accessible leaks(except for existing air handler)are sealed using smoke ❑Pass❑Fail Registration Number: 414-NO019404A-M2000019A-M20A _Registration Date/Time: et3t20144:25 PM HERS Provider: CHEERS 2008 Residential Compliance Forms August 2009 CERTIFICATE OF FIELD VERIFICATION AND DIAGNOSTIC TESTING CF-4R-MECH-20 Duct Leakage Test- Completely New or Replacement Duct System (Pa e 2 of 2) Site Address: Enforcement Agency: Permit Number: 29162 Nectarine St City of Murrieta PMT14-00561 El Outside air (OA) ducts for Central Fan Integrated (CFI) ventilation systems,shall not be sealed/taped off during duct leakage testing. CFI CA ducts that utilize controlled motorized dampers,that open only when CA ventilation is required to meet ASHRAE Standard 62.2, and close when CA ventilation is not required,may be configured to the closed position during duct leakage testing. El All supply and return register boots must be sealed to the drywall O New duct installations cannot utilize building cavities as plenums or platform returns in lieu of ducts. El Mastic and draw bands must be used in combination with Cloth backed,rubber adhesive duct tape to seal leaks at duct connections. DECLARATION STATEMENT • I certify under penalty of perjury,under the laws of the State of California,the information provided on this form is consent correct. • I am the certified HERS rater who performed the verification services identified and reported on this certificate(responsible rater). • The installed feature,material,component,or manufactured device requiring HERS verification that is identified on this certificate (the installation)complies with the applicable requirements in Reference Residential Appendices RA2 and RA3 and the requirements specified on the Certificate(s) of Compliance(CF-1R)approved by the local enforcement agency. • The information reported on applicable sections of the Installation Certificate(s) (CF-6R),signed and submitted by the person(s) responsible for the installation conforms to the requirements specified on the Certificate(s) of Compliance(CF-1R) approved by the enforcement agency. Builder or Installer information as shown on the Installation Certificate(CF-6R) Company Natne: (Installing Subcontractor or General Contractor or Builder/Owner) True Air Mechanical, Inc. Responsible Person's Name: CSLB License: Sergio Samuyo C20 HVAC(956171) HERS Provider Data Registry Information Sample Group#(if applicable): l7 tested/verified dwelling ❑ not-tested/verified dwelling RNG11012 in a HERS sample group HERS Rater Information HERS Rater Company Name: Energy Inspectors Corporation Responsible Raters Name Responsible Rater's Signature Eric Dodd Eric Dodd Responsible Raters Certification Number w/this HERS Provider: Date Signed: RCN10066 9/3/2014 4:25 PM RegISIratiOn NU1nb r1 414-NO019404A-M2000018A-M20A RcRistrat%on Date/Tirne. 9/3120144'.25 PM $ERSPiovider: CHEERS 2008 Residential Compliance Forms August 2009 CERTIFICATE OF FIELD VERIFICATION AND DIAGNOSTIC TESTING CF-411-MECH-22 HSPP/PSPP Installation; Cooling Coil Airflow& Fan Watt Draw Test (Page I of 2 Site Address: Enforcement Agency: Permit Number: 29162 Nectarine St City of Murrieta PMT14-00561 As many as 4 systems in the dwelling can be documented for compliance using this form. Attach an additional form(s)for any additional systems in the dwelling as applicable. Hole for the placement of a Static Pressure Probe (HSPP), and Permanently installed Static Pressure Probe (PSPP) in the supply plenum When the Certificate of Compliance (CFIR)indicates Cooling Coil Airflow, or Fan Watt Draw verification are required, HSPP or PSPP are required to be installed in each air handler in the dwelling. Procedures for installing HSPP and PSPP are described in Reference Residential Appendix RA3.3. This measure requires verification by a HERS rater. Select one method from the two choices below for compliance with the HSPP/PSPP requirement for this dwelling. 0 HSPP 1/4 inch(6 ruin)hole labeled and located downstream of the evaporator coil in the supply plenum as shown in the figure in Section RA3.3.1.1, I/4 inch(6 rum)hole equipped with a permanently installed pressure probe,labeled and ❑ PSPP located downstream of the evaporator coil in the supply plenum as shown in the figure in Section RA3.3.1.1. System Name or Identification/Tag IVAC System:System System Location or Area Served Whole House Confirm that a HSPP or PSPP has been installed on the air handler per the requirements of RA3.3.1.1. Enter Pass or Fail Pass' Cooling Coil Airflow Verification When the Certificate of Compliance indicates Cooling Coil Airflow verification is required, the procedures for measuring the cooling coil airflow must be performed as specified in Reference Residential Appendix RA3.3. Results of the cooling coil airflow diagnostic test must be entered in the table below. This measure requires verification by a HERS rater. Select one method from the three choices below for compliance with the Cooling Coil Airflow test requirement for this dwelling. ❑ Diagnostic Fan Flow Using Plenum Pressure Matching according to the procedures in RA33.3.1.1 ❑ Diagnostic Fan Flow Using Flow Grid Measurement according to the procedures in RA3.3.3.1.2 O Diagnostic Fan Flow Using Flow Ca tureHood accordin to the rocedures in RA3.3.3.1.3 System Name or Identification/Tag VAC System:System System,Location or Area Served Whole House Nominal Cooling Capacity(ton)of the q,0o outdoor unit. Enter the minimum airflow requirement 350 from the CF-1R(CFWton). Calculate the target minimum airflow for the test by multiplying the CFM/ton criteria specified on the CF-1R by the nominal cooling capacity of the outdoor unit(ton). Target CFM 1400 Enter the diagnostically tested airflow (CFM). Tested(CFM) 1520 The system complies if Tested(CFM)is equal or greater than Target(CFM). Enter Pass or Fail Pass Registration Number: 414-Ne919494A-M2299926A-M22A Registration Dateffitne: 9/312 014 4 2 6PM RERSProvider: CHEERS 2008 Residential Compliance Forms March 2010 CERTIFICATE OF FIELD VERIFICATION AND DIAGNOSTIC TESTING CF-4R-MECH-22 HSPP/PSPP Installation; Cooling Coil Airflow & Fan Watt Draw Test (Page 2 of 2) Site Address: Enforcement Agency: Permit Number: 29162 Nectarine St City of Murrieta PMT14-00561 Fan Watt Draw Verification When the Certificate of Compliance indicates Fan Watt Draw verification is required, the procedures for measuring the Fan Watt Draw must be performed as specified in Reference Residential Appendix RA3.3. Results of the Fan Watt Draw diagnostic test must be entered in the table below. This measure requires verification by a PIERS rater. Note: Fan watt draw must be measured simultaneously with cooling coil turflow. The fan watt draw measurement and cooling coil airflow measurement must slmilmneouslymeet or exceed their target criteria specified by the CF-IR for the dwelling. Select one method from the two choices below for compliance with the Fan Watt Draw test requirement for this dwelling. ❑ Portable Watt Meter Measurement according to the procedures in RA3.3.3.3.1 ❑ Utility Revenue Meter Measurement accordin to the rocedures in RA3.3.3.3.2 System Name or Identification/Tag VAC System:System System Location or Area Served Whole House Enter the air handler Tested (CFM) from the 1520 coolingcoil airflow test table above. Enter the fan watt draw requirement from the CF-1R att/CFM). 0.58 Calculate the target maximum Watt draw for the test by multiplying the Watt/CFM criteria specified on the CF-1R by the air handler Tested (CFM). Target(Watt) 882 Enter the diagnostically tested Watt draw Watt). Tested (Watt) 530 The system complies if Tested (Watt) is less than or equal to Target(Watt) Enter pass or Fail Pass DECLARATION STATEMENT • I certify under penalty of perjury,under the laws of the State of California,the information provided on this form is true and correct. • I am the certified HERS rater who performed the verification services identified and reported on this certificate (responsible rater). • The installed feature,material,component,or manufactured device requiring HERS verification that is identified on this certificate (the installation)complies with the applicable requirements in Reference Residential Appendices RA2 and RA3 and the requirements specified on the Certificate(s) of Compliance (CF-I.R) approved by the local enforcement agency. • The information reported on applicable sections of the Installation Certificate(s) (CF-GR),signed and submitted by the person(s) responsible for the installation conforms to the requirements specified on the Certificate(s) of Compliance(CF-1R)approved by the enforcement agency. Builder or Installer information as shown on the Installation Certificate(CF-6R) Company Name: (Installing Subcontractor or General Contractor or Builder/Owner) True Air Mechanical, Inc. Responsible Person's Name: CSLB License: Sergio Samuyo C20 HVAC(956171) IIERS Provider Data Registry Information Sample Group# (if applicable): 0 tested/verified dwelling ❑ not dwelling RNC11012 in a HERS sample group HERS Rater Information HERS Rater Company Name: Energy Inspectors Corporation Responsible Rater's Name Responsible Rater's Signature Eric Dodd Eric Dodd Responsible Rater's Certification Number w/this HERS Provider: Date Signed: RCNIO066 9/3/2014 4:26 PM Registration Number.' 414-Ne019494A-M2200026A-M22A Registratlon Date/lime: 913/20144:26 PM PERSProvider: CHEERS 2008 Residential Compliance Forms March 2010 CERTIFICATE OF FIELD VERIFICATION AND DIAGNOSTIC TESTING CF-4R-MECH-23 Verification of High EER Equipment Pa e 1 of 1 Site Address; Enforcement Agency: Permit Number: 29162 Nectarine St City of Mutilate PMT14-00561 Verification of High EER Equipment Procedures for verification of High EER Equipment are described in Reference Residential Appendix RA3.4. For dwelling units with multiple systems, the procedures must be applied to each system separately. As many as 4 systems in the dwelling can be documented for tom (fence usin this orm. Attach an additional form s for an additional systems in the dwel[in as ap ldcabde. 1 System Name or Identification/Tag HVAC system:System 1 2 System Location or Area Served whole Huse 3 Certified EER Rating of the installed 11,90 equipment(Btu/Watt-hr) 4 Make and Model Number of the installed AiRE FLo Outdoor Unit 4AC13L48P-7A 5 Make and Model Number of the installed ALLStvLE Inside Coil ASFM48-22A34cvs 6 Make and Model Number of the installed AIRE FLo Furnace or Air Handler. BOAFIUH09OP16BL 7 Minimum Equipment EER required for 11.00 compliance as reported on the CF-IR © When a high TER system specification includes a time delay relay,the installation of the time delay relay must be verified for compliance credit. Refer to Reference Residential Appendix RA3.4.3.for the Time Delay Relay Verification Procedure. 0 When installation of specific matched equipment is necessary to achieve a high PER,installation of the specific equipment must be verified for compliance credit. Refer to Reference Residential Appendix RA3.4.3 for the Matched Equipment Verification Procedure. If the Certified EER Rating in row 3 is - equal or greater than the required 8 minimum EER in row 7,the unit complies. If the unit complies enter Pass Pass DECLARATION STATEMENT • I certify alder penalty of perjury,under the laws of the State of California,the information provided on this form is true and correct. • I am the certified HERS rater who performed the verification services identified and reported on this certificate(responsible rater). • The installed feature,material,component,or manufactured device requiring HERS verification that is identified on this certificate (the installation)complies with the applicable requirements in Reference Residential Appendices RA2 and RA3 and the requirements specified on the Certificate(s)of Compliance(CF-1R)approved by the local enforcement agency. • The information reported on applicable sections of the Installation Certificate(s)(CF-6R),signed and submitted by the person(s) responsible for the installation conforms to the requirements specified on the Certificam(s)of Compliance(CF-1R)approved by the enforcement agency. Builder or Installer information as shown on the Installation Certificate CF-6R) Company Name: (Installing Subcontractor or General Contractor or Builder/Owner) True Air Mechanical, Inc. Responsible Person's Name: CSLB License: Sergio Samuyo C20 HVAC(956171) HERS Provider Data Registry Information Sample Group'&(i'f applicable): 0 tested/verified dwelling ❑ not-tested/verified dwelling RNC11012 in a HERS sample group HERS Rater Information HERS Rater Company Name: Energy Inspectors Corporation Responsible Rater's Name Responsible Rater's Signature Eric Dodd Eric Dodd Responsible Rater's Certification Number w/this HERS Provider: Date Signed: RCNIO065 9/3/20144:31 PM Registration Numbei^. 414-N0019494A-M2300019A-M23A Registration Date/%'line: 9/3/2014 4:31 PM FIERSProvider. CHEERS 2008 Residential Compliance Forms August 2009 CERTIFICATE OF FIELD VERIFICATION AND DIAGNOTIC TESTING CF-4R-MECH-25 Refrigerant Charge Verification- Standard Measurement Procedure (Page 1 of 5 Site Address: Enforcement Agency: Permit Number: 29162 Nectarine St City of Murrieta PMT14-00561 Note:If installation of a Charge Indicator Display(CID) is utilized as an alternative to refrigerant charge verification for compliance, a MECH-24 Cert ficate (instead of this MECH-25 Certificate)should be used to demonstrate compliance with the refrigerant charge verification requirement. TMAH and STMS are not requiredfor compliance, when a CID is utilized for compliance. As many as 4 systems in the dwelling can be documentedfor compliance using this form. Attach an additional form(s)for any additional systems in the dwelling as applicable. Temperature Measurement Access Holes(TMAH)and Saturation Temperature Measurement Sensors(STMS) Procedures for installing TMAH are specified in Reference Residential Appendix RA3.2. If,eftigerant charge verification is requiredfor compliance, TMAH are also requiredfor compliance. STMS are only requiredfor completely new or replacement space-conditioning systems that utilize prescriptive compliance method TMAH-Access Holes in Supply and Return Plenums of Air Handler System Name or Identification/Tag IVAC System:System System Location or Area Served Whole House 1 ❑O Yes []No 5116 inch(8 mm)access hole upstream of evaporative coil in the return plenum and labeled according to Figure in Section RA3.2.2.2.2. 2 ©Yes ❑No 5/16 inch(8 mm)access hale downstream of evaporative coil in the supply plenum and labeled according to Figure in Section RA3.2.2.2.2. Yes to 1. and 2 is a pass. Enter Pass or Fail ✓ 0 Pass ✓ ❑Fail STMS-Sensor on the Evaporator Coil System Name or Identification/Tag IVAC System: System The sensor is factory installed,or field installed according to manufacturer's 3 ❑Yes ONo specifications,or is installed by methods/specifications approved by the Executive Director. The sensor wire is terminated with a standard mini plug suitable for connection to a 4 ❑Yes ❑No digital thermometer. The sensor mini plug is accessible to the installing technician and the HERS rater without changing the airflow through the condenser coil 5 Dyes []No The sensor measures the saturation temperature of the coil within 1.3 degrees F Yes to 3,4,and 5 is a pass, Enter ✓ pp N/A ✓ ❑Pass ✓ ❑Pail N/A if STMS are not applicable. Otherwise enter Pass or Fail STMS-Sensor on the Condenser Coil System Name or Identification/Tag IVAC System:System The sensor is factory installed,or field installed according to manufacturer's 6 ❑Yes []No specifications,or is installed by methods/specifications approved by the Executive Director. The sensor wire is terminated with a standard mini plug suitable for convection to a 7 ❑Yes ❑No digital thermometer. The sensor mini plug is accessible to the installing technician and the HERS rater without changing the airflow through the condenser coil 8 []Yes ❑No The sensor measures the saturation temperature of the coil within 1.3 degrees F Yes to 6,7,and 8 is a pass. Enter ,i p N/A ✓ ❑Pass ✓ N/A if STMS are not applicable. Otherwise enter Pass c r Fail []Fail Registration Number: 414-N0019404A-M2600027A-M26A Registration Date/Time: 9/3120144:32 PM HFRSProvider: CHEERS 2008 Residential Compliance Forms July 2010 CERTIFICATE OF FIELD VERIFICATION AND DIAGNOSTIC TESTING CF-4R-MECH-25 Refrigerant Charge Verification- Standard Measurement Procedure (Page 2 of 5) Site Address: Enforcement Agency: Permit Number: - 29162 Nectarine St City of Murrieta PMT14-00561 Standard Charge Measurement Procedure(for use if outdoor air dry-bulb is above 55°F) Procedures for determining Refrigerant Charge using the Standard Charge Measurement Procedure are available in Reference Residential Appendix RA3.2. As many as 4 systems in the dwelling can be documented for compliance using this form. Attach an additional forms)for any additional systems in the dwelling as applicable. • The system should be installed and charged in accordance with the manufacturer's specifications before starting this procedure. • The system must meet minimum airflow requirements as prerequisite for a valid refrigerant charge test. • If outdoor air dry-bulb is 55 OF or below, the installer must use the Alternate Charge Measurement Procedure. Space Conditioning Systems System Name or Identification/Tag VAC System:System System Location or Area Served Whole House Outdoor Unit Serial# 1914E57163 Outdoor Unit Make AIRE FLO Outdoor Unit Model 4AC13L48P-7A Nominal Cooling Capacity Btu/hr 4.0 Date of Verification 09/02/2014 Calibration of Diagnostic Instruments Date of Refrigerant Gauge Calibration 09/01/2014 (must be re-calibrated monthly) Date of Thermocouple Calibration 09/01/2014 (must be re-calibrated monthly) Measured Temperatures °F System Name or Identification/Tag IVAC System:System Supply(evaporator leaving)air dry-bulb temperature(Tsu Iv,db) 0.0 Return(evaporator entering)air dry-bulb rTemrne db) temperature 0.0 P ( Return(evaporator entering)air wet-bulb temperature T 0.0 Evaporator saturation temperature (Teva orator sat) 37.0 Condensor saturation temperature (Tcoudensor,sat) 04.0 Suction line temperature(TsucCioli) 49.0 Liquid Line Temperature(Tliquid) 95.0 Condenser(entering)air dry-bulb T 91.0 temperature p ( condenser db) Registration Number: 414-N0019404A-M2500027A-M25A Registration Date/Tome: WM0144:32PM HERS Provider: CHEERS 2008 Residential Compliance Forms July 2010 CERTIFICATE OF FIELD VERIFICATION AND DIAGNOSTIC TESTING CF-411-MECH-25 Refrigerant Charge Verification- Standard Measurement Procedure (Page 3 of 5 Site Address: Enforcement Agency: Permit Number: 29162 Nectarine St City of Murneta PMT14-00561 Minimum Airflow Requirement Temperature Split Method Calculations for determining Minimum Airflow Requirement for Refrigerant Charge Verification. The temperature split method is specified in Reference Residential Appendix RA3.2. System Name or Identification/Tag Calculate: Actual Temperature Split= Tretum,db-Tsupply,db Target Temperature Split from Table RA3.2-3 using Tretum,wb and Treturn,db Calculate difference: Actual Temperature Split—Target Temperature Split— Passes if difference is between-4eF and +40F or,upon remeasurement, if between +40F and-100OF Enter Pass or Fail Note: Temperature Split Method Calculation is not necessary If actual Cooling Coil Airflow,is verified using one of the airflow,measurement procedures specified in Reference Residential Appendix RA3.3. If actual cooling coil airflow,is measured, the value must be equal to or greater than the Calculated Minimum Airflow Requirement in the table below. Calculated Minimum Airflow Requirement(CFM) = Nominal Cooling Capacity(ton) X 300(cfm/ton) System Name or Identification/Tag IVAC System:System Calculated Minimum Airflow Requirement(CFM) 1200.0 Measured Airflow using RA33 procedures(CFM) 1520 Passes if measured airflow is greater than or equal to the calculated minimum airflow requirement. Enter Pass or Fail Pass Superheat Charge Method Calculations for Refrigerant Charge Verification. This procedure is required to be used for fixed orifice metering device systems System Name or Identification/Tag Calculate: Actual Superheat= Tsuction—Teva orator,sat Target Superheat from Table RA3.2-2 using Treturn,wb and Tcondensen db Calculate difference: Actual Superheat—Target Superheat— System passes if difference is between -60F and+60F Enter Pass or Fail Registration Number: 4144d0019404A-M2500029A-M25A Registration Date/Time: 913/20144:32PM HERS Provider: CHEERS 2008 Residential Compliance Forms . July 2010 CERTIFICATE OF FIELD VERIFICATION AND DIAGNOSTIC TESTING CF-411-MECH-25 Refrigerant Charge Verification- Standard Measurement Procedure (Page 4 of 5 Site Address: Enforcement Agency: Permit Number: 29162 Nectarine St City of Murrieta PMT14-00561 Subcooling Charge Method Calculations for Refrigerant Charge Verification. This procedure is required to be used for thermostatic expansion valve(TXV)and electronic expansion valve(EXV)systems. System Name or Identification/Tag IVAC System:System Calculate: Actual Subcooling= Tcondenseq sat—Tli uid 9.0 Target Subcooling specified by manufacturer 7.0 Calculate difference: Actual Subcooling—Target Subcootin = 2.0 System passes if difference is between -4°F and+4°F Enter Pass or Fail Pass Metering Device Calculations for Refrigerant Charge Verification. This procedure is required to be used for thermostatic expansion valve(TXV)and electronic expansion valve(EXV)systems. System Name or Identification/Tag IVAC System:System Calculate: Actual Superheat = 12.0 TsuEnter — orator,sat Enter allowable superheat range from manufacturer's specifications(or use range between YF and 267 if manufacturer's 3.0-2s.0. specification is not available) System passes if actual superheat is within the allowable superheat range Enter Pass or Fail Pass Registration Number: 414-N0019404A-M260002AA-M26A RegistratiOnDa16lTlme; 9/3120144:32 PM HERSPpovider: CHEERS 2008 Residential Compliance Forms July 2010 i ' I I CERTIFICATE OF FIELD VERIFICATION AND DIAGNOSTIC TESTING CF-4R-MECH-25 Refrigerant Charge Verification- Standard Measurement Procedure (Page 5 of 5) Site Address: Enforcement Agency: Permit Number: 29162 Nectarine St City of Mandate PMT14-00561 Standard Charge Measurement Summary: System shall pass both refrigerant charge criteria,metering device criteria(if applicable),and minimum cooling coil airflow criteria based on measurements taken concurrently during system operation. If corrective actions were taken, all applicable verification criteria must be re-measured and/or recalculated. System Name or Identification/Tag IVAC System:System System meets all refrigerant charge and airflow requirements. Enter Pass or Fail Pass 0 Residential Appendix RA3.2.2 requires that if the outdoor temperature is between 55OF and 65°F the return air dry brdb temperature shall be maintained above 70OF during the Standard Charge Measurement Procedure. The signature of the Responsible Rater in the declaration statement below certifies this requirement has been met for all applicable system verifications reported on this certificate. DECLARATION STATEMENT • I certify under penalty of perjury,under the laws of the State of California,the information provided on this form is true and correct. • I am the certified HERS rater who performed the verification services identified and reported on this certificate(responsible rater). • The installed feature,material,component,or manufactured device requiring HERS verification that is identified on this certificate (the installation)complies with the applicable requirement's in Reference Residential Appendices RA2 and RA3 and the requirements specified on the Certificate(s)of Compliance(CF-IR)approved by the local enforcement agency. • The information reported on applicable sections of the Installation Cerdficate(s)(CF-611),signed and submitted by the person(s) responsible for the installation conforms to the requirements specified on the Certilleate(s)of Compliance(CF-lR)approved by the enforcement agency. Builder or Installer information as shown on the Installation Certificate CF-6R) Company Name: (Installing Subcontractor or General Contractor or Builder/Owner) True Air Mechanical,Inc. Responsible Person's Name: CSLB License: Sergio Samuyo C20 HVAC(956171) HERS Provider Data Registry Information Sample Group#(if applicable): El tested/verified dwelling ❑ not-tested/verified dwelling RNC11012 inaHERS sample group IIERS Rater Information HERS Rater Company Name: Energy Inspectors Corporation Responsible Rater's Name Responsible Rater's Signature Eric Dodd Eric Dodd Responsible Rater's Certification Number w/this HERS Provider: Date Signed: RCN10065 9/3/2014 4:32 PM Registration Number: 414-No01e404A-M2500027A-M25A Registration Date/Tune: ei3t2014432 PM HERSProvider.: CHEERS 2008 Residential Compliance Forms July 2010 City of Menifee BLUDING & SAFETY DEPARTMENT NIF t 29714 Haun Road Menifee, CA 92586 Phone: (951)672-6777—Fax(951)679-3843 www cityofinenifee us Request for Certificate of Occupancy Residential — Custom Homes/Tracts/Condo's/Apts. After all final inspections have been completed by all involved agencies/departments you must obtain authorized signatures from all the involved agencies/departments on this form. When the form is completed, return it with the entire final package to the Building and Safety Department for release of utility meters and issuance of Certificate of Occupancy. All signatures on the forms in this package must be original signatures (copies or faxes will not be accepted).Project Name: i�/jd/qn Permit#: Tract: L Lot#:. Z!�Z Bldg. #: Unit#: Address:_ / �� A)ecZ rJ t° �Z Custom Home: Yes ( ) No ( ) Model Home: Yes ( ) No ( ) Condo/Apartment: Yes ( ) No ( ) Tract Repetitive: Yes ( ) No ( ) Date Approval Si ature 1. Engineering (951) 672-6777 f¢ Q 7/4e /r/ 2. E.M.W.D (951) 928-3777 VLIT 3. Fire Prevention (951) 955-4777 8 �' I(y 4. Planning (951) 672-6777 5. Health Department (Septic Only) 6. Finance (951-672-6777 7. Building & Safety (951) 672-6777 ct C1 / (Final release of utilities) 0 EASTERN MUNICIPAL WATER DISTRICT SINCE 1950" Board of Directors August 29, 2014 President Philip E.Paule Tract: 31582-1 C.O.: 67195/67197 Vice President Lot(s): 11,13, 14, 147 Randy A.Record xx Water Reclaimed xx Sewer Joseph J.Koehler,CPA Model Homes DavRonald W. Sullivan Landscaping only Ronald W.Sullivan General Manager xx Occupancy Paul D.Jones II,P.E. Treasurer City of Menifee Joseph 1,Kuchler,CPA Building & Safety Department Director of The 29714 Haun Road Metropolitan water Menifea, CA 92586 District of So. Calif. Randy A.Record Board Secretary and To Whom It May Concern: Assistant to the General Manager You are advised that interruptible domestic service is granted to the partial tract Rosemarie v.Howard as indicated by the lots enumerated above. The water and/or sewer systems will Legal Counsel be acceptable by Eastern Municipal Water District for operation and maintenance Lemieux&O'Neill upon completion of all tract street improvements, at which time you will be notified. Sincere , Clar L on for Ouckniel Director of Field Engineering CD/cl Cc: Records Management File Engineering Tract File Developer Mailing Address: Post Office Box 8300 Perris,CA 92572-8300 Telephone:(951)928-3777 Pax:(951)928-6177 Location: 2270 Trumble Road Perlis,CA 92570 Internet :www eemwLgJg rEASTE N MUNICIPAL D I S T R I C TNCE 1950 Board of Directors September 10, 2014 President Philip E.Pain® Tract: 31582-1 C.O.: 67195/67197 rice President Lot(s): -12, 144-146 Randy A.Record Water xx Reclaimed Sewer xx Joseph J.Koehler,CPA Model Homes David J.Slawson Ronald W.Sullivan Landscaping only xx Occupancy General Manager Paul D.Jones 11,P.H. Treasurer City of Menifee Joseph J,Kuebler,CPA Building & Safety Department Chairman of The 29714 Haun Road Metropolitan)Pater Menifee, CA 92586 Disalet ofSa.Calif. Randy A.Record Board Secretary and To Whom It May Concern: Assistant to the General Manager You are advised that interruptible domestic service is granted to the partial tract Rosemarie V.Howard as indicated by the lots enumerated above. The water and/or sewer systems will Legal Counsel be acceptable by Eastern Municipal Water District for operation and maintenance Lemieux&O'Neill upon completion of all tract street improvements, at which time you will be notified. Sincerer Clara Lofton for Chuck Daniel Director of Field Engineering CD/cl Cc: Records Management File Engineering Tract File Developer Mailing Address: Post Office Box 8300 Penis,CA 92572-8300 Telephone: (951)928-3777 Fax: (951)928-6177 Location: 2270 Tremble Road Perris,CA 92570 Internet:www.emwd.ora i I Riverside County Fire Department Fire Protection Planning Section i Riverside Off.:2300 Market 5l.,Ste.150,Rlverslde,CA 92501 Ph.(951)955-4777 Fm(951)955-4886 Palm Oesert Ofice: 77-933 Las Montanas Rd.,*201 Palm Desert,CA 92211 4131 Ph.(760)863-8886 Fax(760)863 7072 Fire Department Clearance/Release Date: 09/16/14 To: ccarlson(a4citvofinenifee,us; brivera(a cityofinenifee.us; mbinnall(c)citvofinenifee us Permit/Lot#: 14-MENI-00554: 29153 NECTARINE ST, LOT 11 14-MENI-00556: 29189 NECTARINE ST, LOT 13 14-MENI-00558; 29198 NECTARINE ST, LOT 144. 14-MENI-00559: 29186 NECTARINE ST, LOT 145 , 14-MENI-00560: 29174 NECTARINE ST, LOT 146 . Job Site Address: MERIDIAN (EL DORADO-1)TR 31582-1 ❑ Final For Recordation ❑ Release For Building Permit(s) ❑ Shell Final Only(No Tenant) Final For Occupancy ❑ Release For Residential Sprinkler Installation ❑ Building Plan Check Fees Paid,Water Requirement Met-if water applicable ❑ Building Plan Check Fees Not Paid ❑ Residential Sprinkler Plan Check Fees Paid ❑ Residential Sprinkler Plan Check Fees Not Paid _ Other Fees ❑ Fees Not Required If you should have any questions, please contact the appropriate Riverside County Fire Protection Planning office for further assistance. PHILLIP JONES. FSI Print Name of Plan Reviewer/Inspector Approved Release JAMES WAREN Sent By:Print Name Form C—Revised 3/01/2012 Riverside County Fire Department Fire Protection Planning Section Riverside Office:2300 Market St.,Ste.150,Riverside,CA 92501 Ph.(951)9554777 Fax(951)9554886 Palm Desert Office: 77 933 Las Montanas Rd.,R 201 Palm Desert,CA 92211 4131 Ph.(760)863 8886 Fax(760)863 7072 Fire Department Clearance/Release Date: 08/22/14 To: ccarlson @citvofinenifee.us: brivera(a)cityofmanifee,us; mbinnallpcityofinenifee us Permit/Lot#: 14-MENI-00555: 29165 NECTARINE ST LOT 12• 14-MENI-00557; 29201 NECTARINE ST LOT 14 14-MENI-00561; 29162 NECTARINE ST, LOT 147 Job Site Address: MERIDIAN (EL DORADO-1)TR 31582-1 Final For Recordation ❑ Release For Building Permit(s) El Shell Final Only(No Tenant) ® Final For Occupancy ❑ Release For Residential Sprinkler Installation ❑ Building Plan Check Fees Paid, Water Requirement Met-if water applicable Building Plan Check Fees Not Paid ❑ Residential Sprinkler Plan Check Fees Paid El Residential Sprinkler Plan Check Fees Not Paid ❑ Other Fees ❑ Fees Not Required If you should have any questions, please contact the appropriate Riverside County Fire Protection Planning office for further assistance. PHILLIP JONES, FSI Print Name of Plan Reviewer/Inspector Approved Release JAMES WARE Sent By: Print Name Form C—Revised 3/01/2012