Loading...
PMT14-00555 City of Menifee Permit No.: PMT14-00555 29714 HAUN RD. CIEL. ?"` MENIFEE, CA 92586 Type: Residential New MENIFEE Date Issued: 06/07/2014 PERMIT Site Address: 29165 NECTARINE ST, MENIFEE, CA Parcel Number: 333-622-002 92585 Construction Cost: $252,468.77 Existing Use: 1 &2 Family Residence Proposed Use: 1 &2 Family Residence Description of NSFR Work: 2033/665 LOT 12 Owner Contractor LENNAR HOMES OF CALIFORNIA, INC. LENNAR HOMES OF CALIFORNIA INC 980 MONTECITO DR STE 302 25 ENTERPRISE MENIFEE, CA 92879 ALISO VIEJO, CA 92656 Applicant Phone: 9493498000 LENNAR HOMES OF CALIFORNIA, INC. License Number: 728102 I�I MENIFEE, CA Fee Description ,Q_yt Amount($1 Buj din Perm sSuaji ,: ;�k m (Q0� M M.-.m$ GREEN FEE 1 11.00 §P FtE&IDE is, New Construction Permit Fee 1 1,161.36 $1,225.36 The issuance of this permit shall not prevent the building official from thereafter requiring the correction of errors in the plans and specifications or from preventing builiding operations being carried on thereunder when in violation of the Building Code or of any other ordinance of City of Menifee.Except as otherwise stated,a permit for construction under which no work is commenced within six months after issuance,or where the work commenced is suspended or abandoned for six months,shall expire,and fees paid shall be forfeited. AA_eldg_Permit Template.rpt Page 1 of 1 CITY OF ME IIFEE PLCK No: 29714 Haun Road Dale: / Date: Menifee, CA 92586 Phone: (951)672-6777 A : A: �� Amount: Fax:(951)679-3843 Ck#: ck#: Building Combination Permit C 5� To Be Completed ByApplicant Legal Description: T31582-1 Eldorado I Meridian I Planning Case: F: L: Rt: R: Prope vQd sF: ,..* Assessor's Parcel Number. 062 Proec ea1enthSJ T-of Eldorado IMeridian Phase 1B tmu#: Floor NOSS�AAei: Lennar Homes of California, Inc. Phone No.951.207.3045 lFax No. Property Address: Owner 980 Montecito Drive,Suite 302 Corona 92879 Unit Number Zip code Email Address: Name:Am Williams Phone No. Fax No. y 951.207.3045 Applicant Address: Same as above Unit Number Zip Code Email Address: amy,wllliams@lennar.com Name: Phone No. Fax No. Contractor Address: City Slate Zip Code on ac or a ty Business License No. Contractor's taty State of California License No. Ctassirication: 728102 B Number of Squares: Square Footage I G Description of work: Singl mil denti Cost of Work:;25p 4b i /, ,' ! Applicant's Signature Date: _ To:Ba Complr;ted,.BylClty Stott Only`- ✓ Indicate As R-Received or NIA-Not Applicable 5 Completes sale of fully dimensioned,drawn la sale plans which inrludw 1 set of documents which Include ❑ Title Sheet ❑ Elevations ❑ Electrical Plan ❑ Gas TechlSolls Report(on cd only) ❑ Plot f Sfte Plan ❑ Roof Plan ❑ Mechanical Plan ❑ Title 24 Energy(on 814 x 11) ❑ Foundation Plan ❑ Plumbing Plan ❑ Structural Calculations ❑ Cross Section ❑ Single Line diagram for elec.services over 400 AMP ❑ Floor Plan ❑ Structural Framing Plan&Details ❑ Shoring Plan ❑ Sound Report-Residential Class Code: Indicate New Construction Alteration' Addition` MeanslMethods Work Type: Repair• Relroflt• R8V151sn to Ext111ng PermA' Requtred7 YES NO Proposed Building Use(s): Existing Building Use(s): #Buildings: If Units: If Stories: Will the Building Have a Basement? Y of N Bldg.Code Occupancy Group Indicate Indicate If Indicate all Geo-tech.Haz.Zone At Protect S tinkle if YES or NO Completion: Construction p that apply: Coastal Zone Type(s): C of o YES or NO Noise Zone Required? Listed on Historic Resources inventory CITY PLANNING STAFF ONLY APPROVALS: cooled Commiss Arch.Review Board Landmark Comm. Planning Comm.Toning Administrator Fee Exempt: City Protect Elec.Vehicle Charger Landmark Seismic Retrofit Pedal Casa:aidp. CRdaIA naval Expedite Project(s): Chlkl Care City Project Green BuildingI Landmark I Affordable Housing For Staff Use Only 130ding/Safe( I Permit Specialist I City Plann ng Civil Engineering I EPWM-Admin Transportation MgmL Rom control THANK YOU FOR HELPING US CREATE BETTER COMMUNITY LEGEND (ABOVE GROUND)D)TRAN5fQRMER (6('MASONRY BLOCK WALL MERIDIAN RE5PON51 LITIIE5)MAINTENANCE SCE PULLBOX 5'-G"INTERIOR VINYL PENCE ® (BELOW GROUND) ((SEE CCGR'S FOR MAINTENANCE RESPON518 MEE) @ 5CE HANDHOLE TUBULAR STEEL PENCE m (BELOW GROUND) (5EECCER'5 POP,MAINTENANCE MENIFEE HILLS ® HOUSE METER LOCATION RE5PON51BLITIE5) VERIZON HANDHOLE PIIA5TER ® (BELOW GROUND) (SEE CCCR'S FOR MAINTENANCE SITE MAP SPONSIBLITIES) —p,TT-- TIME WARNER HANDHOLE 5'G'HIGH WOOD GATE ® (BELOW GROUND) O (5EE CC€R'5 FOR MAINTENANCE STREET UGH7 A RESPON518LITIE5) �-- PROPERTY LINE i FIRE HYDRANT ' © WATER METER 0 CONCRETE WALC5 AND DRIVES ••I_ ® AIR VAC VALVE HOMEOWNER MAINTAINED AREA •'I••• MAILBOX 100 LOT NUMBER UNIT TYPE ® EXTERIOR ELEVATION Q AIR CONDITIONING UNIT PAR'R"DENOTES REVERSE PLAN �— . .... ... . ..... SLOPE DIRECTION 6 '. 3 2g LOT 12 PLAN 2CR N � i— If j o s r. 1 ////'�]'��//�,, NECTARINE STREET IMPORTANT NOTICE: OA17'f�— j70 r rj G(Jj THIS PLAN IS FOR GENERAL INFORMATION ONLY AND IS INTENDED TO SHOW APPROXIMATE RELATIONSHIPS.THIS PLAN IS NOT INTENDED TO SHOW PRECISE UTILITY OR MAILBOX LOCATIONS,EXACT FIELD CONDITIONS NOR DOES IT ACCURATELY REFLECT THE SIZE OF THE UTILITY BOXES.LENNAR HOMES MAKES NO GUARANTEE AS TO THIS PLAN'S ACCURACY NOR IS ANY LIABILITY ASSUMED FOR ANY OTHER PURPOSE THAN THAT INTENDED. FOR EXACT LOCATION,IT IS STRONGLY ADVISED TO CHECK ACTUAL FIELD CONDITIONS.PLEASE PHYSICALLY INSPECT YOUR PARTICULAR HOMESITE TO COMPARE THE INFORMATION SHOWN. BUYER: DATE: PRELIMINARY BUYER: DATE: Scale: N.T.S. LOT 12 created:May 1, 2014 291 G5 Nectarine Street L E N N A R° Revsed: Menefee, California iILA - 00 CERTIFICATE OF FIELD VERIFICATION AND DIAGNOSTIC TESTING CF-4R-ENV-20 Building Envelope Sealing (Page 1 of 1 Site Address: Enforcement Agency: Permit Number: 29165 Nectarine St City of Murrieta PMT14-00555 BUILDING ENVELOPE SEALING Diagnostic Testing Results CFM50H=the measured airflow in cubic feet per minute(cfm)at 50 pascals for the dwelling with air distribution registers unsealed. SLA =3,819 s(CFM50H/Conditioned Floor Area in f 2)per Residential ACM Manual Equation R3-16 Building Envelope Leakage CFM50H as measured using a blower door diagnostic device ✓ ✓ 1 Enter the blower door leakage target CFM50H value for compliance from the CF-1R(cfm). 2 Enter the blower door leakage minimum CFM50H value corresponding to 1.5 SLA from the CF-1R(cfm). 3. Enter the measured CFM50H value from the blower door test(cfm) The leakage test passes if the measured envelope leakage CFM50,value from row is 3 less 4. than or equal to the value required for compliance from row 1,otherwise the test fails. El 0 check/enter Pass or Fail Pass Fail 5 If measured CFM50H from row 3 is less than the minimum CFM50H value corresponding to El ❑ 1.5 SLA from row 2: check/enter < 1.5 SLA,otherwise check/enter>1.5 SLA < 1.5 >1.5 SLA* SLA *Advisory note to builder and enforcement agency: If row 5 indicates"< 1.5 SLA",it is critical to ensure that combustion and solid-fuel burning appliances in the dwelling are provided with adequate combustion and ventilation air and vented in accordance with manufacturers'installation instructions and all applicable codes as specified by ASHRAE Standard 62.2 Section 6.4. Additional information about compliance with this requirement is given in Section 4.6.5 of the Residential Compliance Manual under the topic of Combustion and Solid-Fuel Burning Appliances. DECLARATION STATEMENT • I certify under penalty of perjury,under the laws of the State of California,the information provided on this form is true and correct. • I am the certified HERS rater who performed the verification services identified and reported on this certificate(responsible rater). • The installed feature,material,component,or manufactured device requiring HERS verification that is identified on this certificate (the installation)complies with the applicable requirements in Reference Residential Appendices RA2 and RA3 and the requirements specified on the Certificate(s)of Compliance(CF-1R)approved by the local enforcement agency. • The information reported on applicable sections of the Installation Certificate(s)(CF-6R),signed and submitted by the person(s) responsible for the installation conforms to the requirements specified on the Certificate(s)of Compliance(CF-1R)approved by the enforcement agency. Builder or Installer information as shown on the Installation Certificate CF-6R Company Name: (Installing Subcontractor or General Contractor or Builder/Owner) Lerner Homes Responsible Person's Name: CSLB License: Ryan Combe B-General Contractor(782108) HERS Provider Data Registry Information Sample Group#(if applicable): ❑ tested/verifieddwelling m not-tested/verified dwelling RNC11012 in a HERS sample group HERS Rater Information HERS Rater Company Name: Energy Inspectors Corporation Responsible Rater's Name Responsible Raters Signature Eric Dodd Eric Dodd Responsible Rater's Certification Number w/this HERS Provider: Date Signed: RCN10065 9/3/2014 412 PM Registration Number: 414-N001a404A-E2cc002SA-E20A Registration Date/Time: 902014412 PM HERS Provider: CHEERS 2008 Residential Compliance Forms August 2009 CERTIFICATE OF FIELD VERIFICATION AND DIAGNOSTIC TESTING CF-4R-ENV-21 Quality Insulation Installation QII)-Framing Stage Checklist (Page 1 of 2 Site Address: Enforcement Agency: Permit Number: 29165 Nectarine St City of Murriela PMT14-00555 Quality Insulation Installation QII)Framing Stage Checklist Air barrier installation and preparation for insulation must be done at framing stage before insulation is installed.If there are any"No"answers,rows not filled out,or a signature missing then this is not a valid form and cannot be accepted by the building department or HERS rater. SPF insulation can be considered an air barrier when the bottom and top plates of vertical framing and both ends of horizontal framing,including band and rim joists,are sprayed to completely fill the cavity adjacent to and in contact with the framing to a distance of 5.5 inches away from the framing for open cell SPF(ocSPF)or 2.0 inches away from the framing for closed cell SPF(ccSPF). SPF can be considered as an air barrier with less than the above thickness when a product data or specification sheet is provided that shows the product meets an air permeance no greater than 0.02 L/s-m2 at 75 Pa pressure differential when tested in accordance to ASTM E2178 or ASTM E283. All structural framing areas shall be insulated in a manner that resists thermal bridging of the assembly separating conditioned from unconditioned space. Structural bracing,tie-downs, and framing of steel,or specific framing used to meet structural requirements of the CBC are allowed and must be insulated. These areas shall be called out on the building plans with diagrams and/or specific design drawings indicating the R-value of insulation and fastening method to be used. ✓ FLOOR AIR BARRIER ❑ ❑ ❑ All gaps in the raised floor to unconditioned space or to outside larger than 1/8"filled with foam or Yes No NA caulk.(NA if SPF meets conditions above ❑ ❑ ❑ All openings in the raised floor including second floors,such as under a tub where the drain Yes No NA penetrates the floor are sealed. A if slab ongrade) ✓WALLS AIR BARRIER ❑ ❑ ❑ All gaps to outside larger than 1/8"filled with foam or caulk. (NA if SPF meets conditions above) Yes No NA ❑ ❑ ❑ All openings in top and bottom plate to the outside in interior and exterior walls,including holes Yes No NA drilled for electrical and plumbing larger than 1/8"filled with foam or caulk(NA if SPIT meets conditions above �'If i4 ❑ ❑ ,•$' Rope caulk,foam gasket,or caulking bead under exterior sole plate of the home. Yes No ❑ ❑ v' All gaps around windows and doors caulked or foamed. Low expanding foam recommended if Yes No R allowed by window manufacturer. (Stuffing with fiberglass not acceptable) ✓ ATTIC INSPECTION ❑ ❑ ❑ Attic rulers appropriate to the material installed are evenly distributed throughout attic to verify Yes No NA depth. A if SPF or bait ❑ ❑ ❑ Number of rulers installed Yes No NA Attic area(sqft) +250= minimum number of rulers installed. Must round up. A if SPF or batt) ❑ ❑ ❑ Ventilation baffles installed at all eave vents to prevent air movement under or into insulation. Yes No NA A if SPF meets conditions above)(NA if Lu vented attic) ❑ ❑ ❑ Net free-ventilation area of the eave vent maintained from eave vent,past insulation,to attic space. Yes No NA A if no eave vents or SPF ✓ CEILING AIR BARRIER ❑ ❑ ❑ All draft stops in place to form a continuous ceiling air barrier no gaps larger than 1/8". (NA if SPF Yes No NA meets conditions above ❑ ❑ ❑ All dropped ceilings/soffits covered with hard covers. Gaps around or in the hard cover larger than Yes No NA 1/8"filled with foam or caulk. (NA if no drops) ❑ ❑ ❑ Openings around flue shafts fully sealed with flashin and caulked. A if no flue shafts) Registration Number: 414-NO019404A-R2100012A-E21A Registration Date/Time: 913120144,13PM HERSProvider: CHaaRs 2008 Residential Compliance Forms May 2012 CERTIFICATE OF FIELD VERIFICATION AND DIAGNOSTIC TESTING CF-4R-ENV-21 Quality Insulation Installation QII) -Framing Stage Checklist (Page 2 of 2 Site Address: Enforcement Agency: Permit Number: 29165 Nectarine St City of Murrieta PMT14-00555 Yes No NA ❑ ❑ ❑ Piping shaft openings fully sealed and caulked. (NA if no pipe shafts) Yes No NA ❑ ❑ ❑ Penetrations through the ceiling air barrier from electrical boxes in the ceiling,fire alarm boxes,etc,sealed with Yes No NA caulk or foam. (NA if no penetrations) ❑ ❑ ❑ All duct chases,fireplace chases,and double walls sealed air tight at the ceiling level. All gaps into shafts larger Yes No NA than 1/8"filled with foam or caulk(NA if none of the above or SPF meets conditions above) ✓ GARAGE/CEILING AIR BARRIER FOR TWO STORIES (no conditioned space over ara e ❑ ❑ ElAir barrier installed atjoists in garage to house transition (between floors). No gaps larger than 1/8" Yes No NA allowed. (NA if SPF meets conditions above) ✓ GARAGE/CEILING AIR BARRIER FOR TWO STORIES(conditioned space over arm e ❑ ❑ ❑ If insulation is to be installed at subfloor then subfloor has no gaps over 1/8". Air barrier installed at Yes No NA joists in garage to house transition (between floors).Use of SPF meeting conditions above as the air barrier satisfies the requirement to seal the gaps. ❑ ❑ ❑ If insulation is to he installed at ceiling of garage then ceiling andjofsts to the outside have no gaps Yes No NA over 1/8". NA if SPF meets conditions above or no conditioned space over garage.) DECLARATION STATEMENT • I certify under penalty of perjury,under the laws of the State of California,the information provided on this form is true and correct. • I am the certified HERS rater who performed the verification services identified and reported on this certificate(responsible rater). • The installed feature,material,component,or manufactured device requiring HERS verification that is identified on this certificate (the installation) complies with the applicable requirements in Reference Residential Appendices RA2 and RA3 and the requirements specified on the Certificate(s) of Compliance(CUIR) approved by the local enforcement agency. • The information reported on applicable sections of the Installation Certificate(s) (CB-6R),signed and submitted by the person(s) responsible for the installation conforms to the requirements specified on the Certificate(s) of Compliance(CF-1R)approved by the enforcement agency. Builder or Installer information as shown on the Installation Certificate(CF-6R Company Name and Phone Number: (Installing Subcontractor or General Contractor or Builder/Owner) Masco Contractor Services of California, Inc. Responsible Person's Name: CSLB License: Monte Renshaw C-2 Insulation(221517) HERS Provider Data Registry Information Sample Group#(if applicable): ❑ tested/verified dwelling ® not-tested/verified dwelling RNG11012 in a HERS sample group HERS Rater Information HERS Rater Company Name and Phone Number: Energy Inspectors Corporation Responsible Rater's Name Responsible Rater's Signature Eric Dodd Eric Dodd Registration Number. 414-N0019404A-E2100012A-E21A Registration Date/Time. 9/32014413PM f1E+12SP,,V1du,. CHEERS 2008 Residential Compliance Forms May 2012 CERTIFICATE OF FIELD VERIFICATION AND DIAGNOSTIC TESTING CF-4R-ENV-22 Quality Insulation Installation (QII)-Insulation Stage Checklist (Page I of 3 Site Address: Enforcement Agency: Permit Number: 29165 Nectarine St City of Murrieta PMT14-00555 All structural framing areas shall be insulated in a manner that resists thermal bridging of the assembly separating conditioned from unconditioned space. Structural bracing,tie-downs,and framing of steel,or specialized framing used to meet structural requirements of the CBC are allowed and must be insulated. These areas shall be called out on the building plans with diagrams and/or specific design drawings indicating the R-value of insulation and fastening method to be used. SPF insulation can be considered an air barrier when the bottom and top plates of vertical framing and both ends of horizontal framing, including band and finjoists,are sprayed to completely fill the cavity adjacent to and in contact with the framing to a distance of 5.5 inches away from the framing for open cell SPF(ocSPF)or 2.0 inches away from the framing for closed cell SPF(ccSPF). SPF can be considered as an air barrier with less than the above thickness when a product data or specification sheet is provided that shows the product meets an air permeanee no greater than 0.02 L/s-m2 at 75 Pa pressure differential when tested in accordance to ASTM E2178 or ASTM E283. Closed cell and open cell manufacturers claim various R-values per inch. In California the maximum R-value that can be claimed for ccSPF is an R-value of 5.8 per inch and for ocSPF is an R-value of 3.6 per inch. Aigher R-values per inch cannot be claimed even with manufacturer data. Insulation Stage Checklist ✓FLOOR INSULATION ❑ ❑ ❑ All floor joist cavity insulation installed to uniformly fill the cavity side-to-side mud end-to-end,NO gaps, (NA if Yes No NA slab on grade) ❑ ❑ ❑Yes No NA Insulation in full contact with the subfloor,NO gaps. (NA if slab on grade) ❑ ❑ ❑Yes No NA Batts: cut to fit around wiring and plumbing,or split(delaminated). (NA if loose fill,SPF,or slab on grade) ❑ ❑ ❑ Batts: shall be properly supported to avoid gaps,voids,and compression. (NA for other forms of insulation) Yes No NA ❑ ❑ ❑ Insulation R-value same or greater than listed on CF-IR.(NA for slab on grade) Yes No NA ❑ ❑ ❑ Gaps between studs larger than 1/8"the cavity must be filled with insulation or foam. (NA for slab on grade) Yes No NA ❑ SPF: list the required floor cavity R-value from CF-1R,R- Determine required thickness for ceSPF NA (required R-value_/5.8R)=_inches),or required thickness for ocSPF(required R value_/3.6= inches). A for other forms of insulation ❑ ❑ ❑ SPF: measure thickness of floor insulation in 6 random areas. Minimum thickness for ceSPF shall be no more Yes No NA than Va inch less than the required thickness listed above. Minimum thickness for ocSPF shall be no more than 1 inch less than the required thickness listed above. (NA for other forms of insulation) ✓WALL INSULATION Batts,loose fill mineral fiber,mineral wool,and cellulose: fills cavity and is in contact with air barrier. ❑ ❑ ❑ ocSPF: shall completely fill cavities of 2x4 inch framing or less. Cavities greater than 2x4 inch framing Yes No NA dimensions must be filled to the thickness calculated above. ceSPF: insulation is not required to fill the cavities of framed assemblies provided the installed thickness of insulation conforms to the thickness calculated above. ❑ ❑ ❑ Double walls and bump-outs-insulation fills the cavity or additional air barrier installed in the cavity so that the Yes No NA insulation fills tire cavity and in contact with the air barrier.(NA if SPF meets conditions above and meets the required R-value) ❑ ❑ ❑ Insulation installed in exterior walls adjacent to tub/shower,walls under stairs,and fireplace. Insulation required Yes No NA to fill wall cavity. Cavity required to be air light.(NA if none of the above ❑ ❑ e All gaps around windows and doors filled with insulation or filled with low expanding foam. Yes No WI 114,lr-, ❑ ❑ ❑ Batts:no voids/depressions greater than 3/4"in ANY stud bay.(NA for other forms of insulation) Yes No NA ❑ ❑ ❑ Batts: voids/depressions less than 3/4"allowed as long as the area is not greater than 10%of the surface area for Yes No NA each stud bay. A for other forms of insulation ❑ ❑ ❑ Loose Fill: no or voids. Insulation completely fills the cavity. Yes No NA gaps P Y ty•(NA for other forms of insulation) ❑ ❑ W ` � Yes No Gaps between studs larger than 1/8"the cavity must be filled with insulation or foam. ,���;�y'�12 Registration Number: 414-No919494A-E220001eA-E22A Registration Date/Time: 913120144.18PM HERS Provider: CHEERS 2008 Residential Compliance Forms May 2012 CERTIFICATE OF FIELD VERIFICATION AND DIAGNOSTIC TESTING CF-4R-ENV-22 Quality Insulation Installation (QII) -Insulation Stage Checklist (Page 2 of 3) Site Address: Enforcement Agency: Permit Number: 29165 Nectarine St City of Murrieta PMT14-00555 ❑ ❑ ❑ All Rim-joists to the outside insulated. (NA if no Rim-joists) Yes No NA ❑ ❑ ❑ Insulation installed a[corner channels,wall intersections,and adjacent to tub/shower enclosures insulated to Yes No NA proper R-Value. ❑ ❑ ❑ All skylight shafts and attic kneewalls insulated with minimum R-19. (NA if no skylights,kneewalls or in Yes No NA conditioned attic) ❑ ❑ ❑ Insulation in full contact with air barrier or wall finish for skylight shafts and attic kneewalls. (NA if no skylight or Yes No NA kneewalls ❑ ❑ n s'( Installed wall insulation R-value equal to or greater than what is listed on the CF-1R. Yes No ,v..fil"„"a; 4 ❑ ❑ ❑ SPF:insulation installed without gaps and to provide an air seal when specified as an air barrier. (NA for other Yes No NA farms of insulation ❑ SPF: list the required wall cavity R-value from CF-1R,R- Determine required thickness for ccSPF NA (required R-value_/5.8R)__inches),of required thickness for ocSPF(required R-value_/3.6= inches). (NA for other forms of insulation) ❑ ❑ ❑ SPF: measure thickness of wall insulation in 6 random areas. Minimum thickness for ccSPF shall be no more Yes No NA than inch less than the required thickness listed above, Minimum thickness for ocSPF shall be no more than 1 inch less than the required thickness listed above. (NA for other forms of insulation ✓ CEILING/ROOF INSULATION ❑ ❑ Yes No 't kt `t Gaps between studs larger than 1/8"the cavity must be filled with insulation or foam. ❑ ❑ ❑Yes No NA Batts: no gaps/voids/depressions greater than 3/4 (NA for other forms of insulation) ❑ ❑ ❑ Batts: voids/depressions less than 3/4"allowed as long as the area is not greater than 10%of the surface area for Yes No NA each stud bay. (NA for other forms of insulation ❑ ❑ ❑ Loose Fill: NO gaps or voids allowed. (NA for other forms of insulal ion) Yes No NA ❑ ❑ "d" h1 F4 Yes All ceiling/roof insulation installed to uniformly fit the cavity side-to-side and end-to-end. ❑ El `" "' " ❑ Insu1 Bonin full contact with[he.ceiling/roof,NO gaps. Yes No rqv%¢ice"a ❑ ❑ 6°lanvs Yes No 'fk.4,gr�" Insulation in contact with air barrier. ❑ ❑ ❑ Batts: cut to fit around wit ing and plumbing,or split(delaminated). (NA for other forms of insulation) Yes No NA ❑ ❑ ❑ Batts taller than bottom chord must expand over the bottom chord or additional insulation installed so bottom Yes No NA chord not visible. NA for other forms of insulation ❑ ❑ ❑ Batts cut to fit around ALL webbing. No gaps allowed between webbing and batty (NA for other forms of Yes No NA insulation ❑ SPF: list the required ceiling R-value from CF-1R,R-_. Required depth of insulation for ccSPF(required NA R-value_/5.81Z=_inches),or required depth of ocSPF (required R-value_/3.6=_inches). (NA for other forms of insulation) ❑ ❑ ❑ SPF: measure thickness of ceiling insulation in 6 random areas. Minimum thickness for ccSPF shall be no Yes No NA more than'h inch less than the required thickness listed above. Minimum thickness for ocSPP'shall be no more than 1 inch less than the required thickness listed above. (NA for other forms of insulation) ❑ ❑ ❑ HVAC Platform and Catwalks-insulated to R-value equal to ceiling R-value listed on CF-1R. If less Yes No NA insulation installed then called out on CF-1R. (NA if no platform or catwalks) ❑ ❑ ❑ Yes No NA Attic access gasketed. (NA of no attic access) ❑ ❑ ❑ Attic access insulated with rigid foam or halt insulation using adhesive of mechanical fastener. Attic access door Yes No NA R-value equal to ceiling R-value listed on CF-1R. If less insulation installed[hen called out on CF-lR. (NA if no attic access) ❑ ❑ ❑ Recessed light fixtures covered full depth with insulation. If SPF used then other forms of insulation used to Yes No NA cover or enclose fixture in a box fabricated from'/2-inch plywood, 18 ga.sheet metal, 1/4-inch hard hoard or drywall. SPF or other insulation then covers light fixture to Lull de th, (NA is no recessed light fixtures) ❑ ❑ ❑ All recessed light fixtures in non conditioned space are IC rated and air tight(AT , (NA if no recessed light Yes I No NA fixtures) Registration Number: 414-No019404A-e2e00013A-e22A Reglstration Date/Ti�70, 913l20144:1eaM HERSProvider: CHEERS 2008 Residential Compliance Forms May 2012 CERTIFICATE OF FIELD VERIFICATION AND DIAGNOSTIC TESTING CF-4R-ENV-22 Quality Insulation Installation (QII) - Insulation Stage Checklist (Page 3 of 3) Site Address: Enforcement Agency: Permit Number: 29165 Nectarine St City of Murrieta PMT14-00555 ❑ ❑ ❑ All recessed light fixtures are sealed with a gasket or caulk between the housing and the ceiling, (NA if no Yes No NA recessed light fixtures) ❑ ❑ ip f.e'f. Yes No r(a,t, �I! Ceiling insulation equal to or greater than what is listed an the CF-IR. ❑ ❑ ❑ Loose Fill: Miuirnum thickness required to meet the stated R-value listed on CF-IR.Insulation rulers visible for Yes No NA verifying the installed R-value for blown in insulation. (NA for other forms of insulation) ❑ ❑ ❑ Loose Fill: insulation uniformly covers the entire ceiling(or roof) area from outside of all exterior walls. (NA Yes No NA for other forms of insulation) Weight of Mineral-Fiber Loose-fill(Fiberglass,Rock wool)-Target R-value (from CF-IR) .Minimum ❑ ❑ ❑ weight from insulation bag label to meet target R-value (Ib./ft2) . Weight of insulation from coring tool Yes No NA _(Ib),Area of coring tool (ft2). Sample weight= (lb./W).Is sample weight(lb,/ft2) the same as or greater than required weight(Ib./ft2) (NA for other forms of insulation) Thickness-ALL Loose-Fill Insulation-Target R-value (from CF-1R) .Required thickness from ❑ ❑ ❑ insulation bag label to meet Target R-value for(Installed Thickness_(in)),and (Settled Thickness_ Yes No NA (in)). Average Installed thickness_(fn). Is Installed Thickness the same as or greater than Required Thickness? (NA for other forms of insulation) ✓ GARAGE ROOF/CEILING INSULATION FOR TWO STORIES(no conditioned space over garage) ❑ ❑No ❑NA Insulation installed at rim joists against the air barrier in the garage to house transition (between floors). (NA if Yes conditioned space over garage or single story). ✓ GARAGE ROOF/CEILING INSULATION FOR TWO STORIES conditioned space over garage) ❑ ❑ ❑ If insulation is installed at subfloor above garage-then insulation must also be installed atjoists against the air Yes No NA barrier in the garage to house transition (between floors) and to R-value as specified on CF-I R. (NA if no conditioned space over garage or single story) ) ❑ ❑ ElIf insulation is installed on ceiling of garage-then thejoists to the outside (front,and both sides)must be Yes No NA insulated to the R-valuespecified on CF-1R. (NA if no conditioned space over garage or single story) DECLARATION STATEMENT • I certify under penalty of perjury,under the laws of the State of California,the information provided on this form is true and correct. • I am the certified HERS rater who performed the verification services identified and reported on this certificate(responsible rater). • The installed feature,material,component,or manufactured device requiring HERS verification that is identified on this certificate (the installation) complies with the applicable requirements in Reference Residential Appendices RA2 and RA3 and the requirements specified on the Certificate(s) of Compliance(CF-1R)approved by the local enforcement agency. • The information reported on applicable sections of the Installation Certificate(s) (CF-6R),signed and submitted by the person(s) responsible for the installation conforms to the requirements specified on the Certificate(a) of Compliance(CF-1R) approved by the enforcement agency. Builder or Installer information as shown on the Installation Certificate(CF-611) Company Name and Phone Number: (Installing Subcontractor or General Contractor or Builder/Owner) Masco Contractor Services of California, Inc. Responsible Persons Name: CSLB License: Monte Renshaw C-2 Insulation(221517) HERS Provider Data Registry Information Sample Group# (if applicable): ❑ tested/verified dwelling ® not-tested/verified dwelling RNC11012 in a HERS sample group HERS Rater Information HERS Rater Company Name and Phone Number: Energy Inspectors Corporation Responsible Rater's Name Responsible Rater's Signature Eric Dodd Eric Dodd Responsible Ratei's Certification Number w/this HERS Provider: Date Signed: RCN 10065 9/3/2014 4:18 PM Registration N11Mb r: 414-N0019404A-E2200013A-E22A RCgISira11011 Dffie/IL➢e: 9/3120144:18 PM 1$ERSProvidor: CHEERS 2008 Residential Compliance Forms May 2012 CERTIFICATE OF FIELD VERIFICATION AND DIAGNOSTIC TESTING CF-4R-MECH-20 Duct Leakage Test—Completely New or Replacement net S stem (Page 1 Of IL Site Address: Enforcement Agency: Permit Number: 29165 Nectarine St City of Murrieta PMT14-00555 Enter the Duct System Name or Identification/Tag: Enter the Duct System Location or Area Served: Note: Submit one Installation Cert fcate for each duct system that must demonstrate compliance in the dwelling. This certificate is required for compliance for completely new duct systems installed in new dwelling construction, and also for completely new or replacement duct systems in existing dwellings. For existing dwellings, a completely new or replacement duct system can also include existing parts of the original duct system(e.g., register boots, air handler, coil, plenums, etc.)if those parts are accessible and they can be sealed. Duct Leakage Diagnostic Test—completely new or replacement ducts stem Enter a value for the Allowed Leakage(CFM)for the duct system leakage verification. The value entered must be the Verified Low Leakage Ducts in Conditioned Space criteria or one of the three calculated leakage rates described below. Verified Low Leakage Ducts in Conditioned Space(VLLDCS)Compliance Credit. If compliance credit Allowed for verified low leakage ducts in conditioned space is shown in the special features section of the CF-IR,the Leakage leakage to outside test method must be used to verify duct leakage(refer to RA3.1.4.3.4),and 25 CFM must be (CFM) entered for Allowed Leakage. Allowed leakage calculation—(select one calculation method from this section). Use 6%(leakage factor= 0,06)for calculations. When utilizing Low Leakage Air Handler(LLAH)credit,the allowed duct leakage may be specified by the CF-1R to be less than 6%,in which case the user-specified leakage rate must be used in the calculations below. For example,if the user-specified leakage(specified as a percentage of fair airflow)is reported on the CF-IR as 3%,then use a leakage factor of 0.03 in the calculations below. ❑ Cooling system method: Nominal capacity of condenser in Tons x 400 x leakage factor = (CFM) ❑ Heating system method: 21.7 x Output Capacity in Thousands of Btu/hr x leakage factor= (CFM) ❑ Measured airflow method(RA3.3): - Enter measured fan flow in CFM here x leakage factor = (CFM) Enter value for Actual leakage(CFM)in the right column,from measurement using applicable duct leakage Actual Leakage pressurization test procedure from Reference Residential Appendix RA3.1(CFM @ 25 Pa). (CFM) List Actual Leakage from duct leakage test(CFM) Pass if Actual Leakage is less than Allowed Leakage ❑Pass❑Fail For complete replacement of duct systems only,if the 6 percent leakage rate criteria cannot be met,a smoke test should be performed to verify that the excess leakage is coming only from a pre-existing furnace cabinet (air handler cabinet),and not from other accessible portions of the duct system. A HERS rater must verify the installation o sampling allowed). List Actual Leakage from smoke test(CFM) Pass if all accessible leaks(except for existing air handler)are sealed using smoke ❑Pass❑Fail Registration Number: 414-NO019404A-M200001RA-M20A Registration Date/Time: 9/3120144:25 PM HRRSProvider: CHEERS 2008 Residential Compliance Forms August 2009 CERTIFICATE OF FIELD VERIFICATION AND DIAGNOSTIC TESTING CF-4R-MECH-20 Duct Leakage Test—Completely New or Replacement Duct S stem (Page 2 of 2) Site Address: Enforcement Agency: Permit Number: 29165 Nectarine St City of Murrieta PMT14-00555 ❑ Outside air (OA) ducts for Central Fan Integrated (CFI) ventilation systems,shall not be sealed/taped off during duct leakage testing. CFI CA ducts that utilize controlled motorized dampers,that open only when CA ventilation is required to meet ASHRAE Standard 62.2, and close when CA ventilation is not required,may be configured to the closed position during duct leakage testing, ❑ All supply and return register boots must be sealed to the drywall ❑ New duct installations cannot utilize building cavities as plenums or platform returns in lieu of ducts. ❑ Mastic and draw bands must be used in combination with Cloth backed,rubber adhesive duct tape to seal leaks at duct connections. DECLARATION STATEMENT • I certify under penalty of perjury,under the laws of the State of California,the information provided on this form is true and correct. • I am the certified HERS rater who performed the verification services identified and reported on this certificate(responsible rater). • The installed feature,material,component,or manufactured device requiring HERS verification that is identified on this certificate (the installation) complies with the applicable requirements in Reference Residential Appendices RA2 and RA3 and the requirements specified on the Certificate(s) of Compliance(CF-1R)approved by the local enforcement agency. • The information reported on applicable sections of the Installation Certificatc(s) (CF-6R),signed and submitted by the person(s) responsible for the installation conforms to the requirements specified on the Certificate(s) of Compliance(CF-1R)approved by the enforcement agency. Builder or Installer information as shown on the Installation Certificate(CF-6R) Company Name: (Installing Subcontractor or General Connector or Builder/Owner) True Air Mechanical, Inc. Responsible Person's Name: CSLB License: Sergio Samuyo C20 HVAC(956171) HERS Provider Data Registry Information Sample Group# (if applicable): ❑ tested/verified dwelling m not-tested/verified dwelling RNC11012 in a HERS sample group HERS Rater Information HERS Rater Company Name: Energy Inspectors Corporation Responsible Rater's Name Responsible Rater's Signature Eric Dodd Eric Dodd Responsible Rater's Certification Number w/this HERS Provider: Date Signed: RCN10065 9/3/2014 4:25 PM Registration Number' 414-Ne919404A-M2009018A-M20A Registration Datall7nre. 0/3/20144o6PM 11ERSProVider. CHEERS 2008Residential Compliance Farms August 2009 i CERTIFICATE OF FIELD VERIFICATION AND DIAGNOSTIC TESTING CF-4R-MECH-22 HSPP/PSPP Installation; Cooling Coil Airflow& Fan Watt Draw Test (Page 1 of 2 Site Address: Enforcement Agency: PermiC Number: 29165 Nectarine St City of Murrieta PMT14-00555 As many as 4 systems in the dwelling can be documented for compliance using this form. Attach an additionalform(s)for any additional systems in the dwelling as applicable. Hole for the placement of a Static Pressure Probe (HSPP), and Permanently installed Static Pressure Probe (PSPP) in the supply plenum When the Certificate of Compliance (CF]R)indicates Cooling Coil Airflow or Fan Watt Draw verification are required, HSPP or PSPP are required to be installed in each air handler in the dwelling. Procedures for installing HSPP and PSPP are described in Reference Residential Appendix RA3.3. This measure requires verification by a HERS rater. Select one method from the two choices below for compliance with the HSPP/PSPP requirement for this dwelling. ❑ HSPP 1/4 inch(6 mm)hole labeled and located downstream of the evaporator coil in the supply plenum as shown in the figure in Section RA3.3.1.1. 1/4 inch(6 min)hole equipped with a permanently installed pressure probe,labeled and ❑ PSPP located downstream of the evaporator coil in the supply plenum as shown in the figure in Section RA3.3.1.1. System Name or Identification/Tag System Location or Area Served Confirm that a HSPP or PSPP has been installed on the air handler per the requirements of RA3.3.1.1. Enter Pass or Fail I� Cooling Coil Airflow Verification When the Certificate of Compliance indicates Cooling Coil Airflow verification is required, the procedures for measuring the cooling coil airflow must be performed as specified in Reference Residential Appendix RA3.3. Results of the cooling coil airflow diagnostic test must be entered in the table below. This measure requires verification by a HERS rater. Select one method from the three choices below for compliance with the Cooling Coil Airflow test requirement for this dwelling. ❑ Diagnostic Fan Flow Using Plenum Pressure Matching according to the 2rocedures in RA3.3.3.1.1 ❑ Diagnostic Fan Flow Using Flow Grid Measurement according to the procedures in RA3.3.3.1.2 ❑ Diagnostic Fan Flow Using Flow Capture Hood according to the procedures in RA3.3.3.1.3 System Name or Identification/Tag System Location or Area Served Nominal Cooling Capacity(ton)of the outdoor unit. Enter the minimum airflow requirement from the CF-IR(CFM/ton). Calculate the target minimum airflow for the test by multiplying the CFM/ton criteria specified on the CF-IR by the nominal cooling capacity of the outdoor unit(ton). Target CFM Enter the diagnostically tested airflow (CFM). Tested(CFM) The system complies if Tested(CFM)is equal or greater than Target(CFM). Enter Pass or Fail Registration Number: 414-NO016404A-102200026A-M22A Registration Date/Time: 9/3120144,26 PM HERSProvider: CHEERS 2008 Residential Compliance Forms March 2010 CERTIFICATE OF FIELD VERIFICATION AND DIAGNOSTIC TESTING CF-4R-MECH-22 HSPP/PSPP Installation; Cooling Coil Airflow & Fan Watt Draw Test (Page 2 of 2) Site Address: Enforcement Agency: Peenit Number: 29165 Nectarine St City of Murrieta PMT14-00555 Fan Watt Draw Verification When the Certificate of Compliance indicates Fan Watt Draw verification is required, thepr'ocedures formeasuring the Fan Watt Draw :. must be performed as specified in Reference Residential Appendix RA3.3. Results of the Fan Watt Draw diagnostic test must be entered in the table below, This measure requires verification by a HERS rater. Note: Fan watt drawmust be measured simultaneously with cooling coil airflow. The fan watt draw measurement and cooling coil ahtlow measurement must smm/taneous/y meet or exceed their target criteria specified by the CF-1R for the dwelling. - Select one method from the two choices belowfor compliance with the Fan Watt Draw test requirement for this dwelling. ❑ Portable Watt Meter Measurement according to the procedures in RA3.3.3,3.1 ❑ Utility Revenue Meter Measurement accordin to the rocedures in RA3.3.3.3.2 System Name or Identification/Tag System Location or Area Served Enter the air handler Tested (CFM) from the cooling coil airflow test table above. Enter the fan watt draw requirement from the CT-1R att/CFM . Calculate the target maximum Watt draw for the test by multiplying the Watt/CFM criteria specified on the CF-1R by the air handler Tested (CFM). Target(Watt) Enter the diagnostically tested Watt draw (Watt). Tested (Watt) The system complies if Tested (Watt) is less than or equal to Target(Watt) Enter pass or Fail DECLARATION STATEMENT • I certify under penalty of perjury,under the laws of the State of California,the information provided on this form is true and correct. • I am the certified HERS rater who performed the verification services identified and reported on this certificate (responsible rater). • The installed feature,material,component,or manufactured device requiring HERS verification that is identified on this certificate (the installation) complies with the applicable requirements in Reference Residential Appendices RA2 and RA3 and the requirements specified on die Certificate(s) of Compliance(CF-1R) approved by the local enforcement agency. • The information reported on applicable sections of the Installation Certificate(s) (CF-6R),signed and submitted by the person(s) responsible for the installation conforms to die requirements specified on the Certificate(s) of Compliance(CF-IR) approved by the enforcement agency. Builder or Installer information as shown on the Installation Certificate CF-6R Company Name: (Installing Subcontractor or General Contractor or Builder/Owner) True Air Mechanical, Inc. Responsible Person's Name: CSLB License: Sergio Samuyo C20 HVAC(956171) HERS Provider Data Registry Information Sample Group It(if applicable): ❑ tested/verified dwelling 0 not-tested/verified dwelling RNC11012 in a HERS sample group HERS Rater Information HERS Rater Company Name: Energy Inspectors Corporation Responsible Rater's Name Responsible Rater's Signature Eric Dodd Eric Dodd Responsible Rater's Cerdficadon Number w/this HERS Provider: Date Signed: RCN10065 9/3/2014 4:26 PM Registration Number: 414-No019404A-M2200026A-M22A Registration Date/Time: 913/20144:26PM IIERSProvider.' CHEERS 2008 Residential Compliance Forms March 2010 CERTIFICATE OF FIELD VERIFICATION AND DIAGNOSTIC TESTING CF-4R-MECH-23 Verification of High EER Equipment (Page 1 of 1 Site Address: Enforcement Agency: Permit Number: 29165 Nectarine St City of Murrieta PMT14-00555 Verification of High EER Equipment Procedures far verification of High EER Equipment are described in Reference Residential Appendix RA3.4. For dwelling units with multiple systems, the procedures must be applied to each system separately. As many as 4 systems in the dwelling can be documented for compliance using this form. Attach an additional forms) or any additional systems in the dwellin as applicable. 1 System Name or Identification/Tag 2 System Location or Area Served 3 Certified EER Rating of the installed equipment(Btu/Watt-hr) 4 Make and Model Number of the installed Outdoor Unit 5 Make and Model Number of the installed Inside Coil Make and Model Number of the installed Furnace or Air Handler. 7 Minimum Equipment EER required for compliance as reported on the CF-IR ❑ When a high EER system specification includes a time delay relay,the installation of the time delay relay must be verified for compliance credit. Refer to Reference Residential Appendix RA3,4.3 for the Time Delay Relay Verification Procedure. ❑ When installation of specific matched equipment is necessary to achieve a high EER,installation of the specific equipment must be verified for compliance credit. Refer to Reference Residential Appendix RA3.4.3 for the Matched Equipment Verification Procedure. If the Certified EER Rating in row 3 is equal or greater than the required 8 minimum EER in row 7,the unit complies. If the unit complies enter Pass DECLARATION STATEMENT • I certify under penalty of perjury,under the laws of the State of California,the information provided on this form is true and correct. • I am the certified HERS rater who performed the verification services identified and reported on this certificate(responsible rater). • The installed feature,material,component,or manufactured device requiring HERS verification that is identified on this certificate (the installation)complies with the applicable requirements in Reference Residential Appendices RA2 and RA3 and the requirements specified on the Certificate(s)of Compliance(CF-IR)approved by the local enforcement agency. • The information reported on applicable sections of the Installation Certificate(s)(CF-6R),signed and submitted by the person(s) responsible for the installation conforms to the requirements specified on the Certificate(s)of Compliance(CF-1R)approved by the enforcement agency. Builder or Installer information as shown on the Installation Certificate CF-6R Company Name: (Installing Subcontractor or General Contractor or Builder/Owner) True Air Mechanical, Inc. Responsible Person's Name: CSLB License: Sergio Samuyo C20 HVAC(956171) HERS Provider Data Registry Information Sample Group#(if applicable): ❑ tested/verified dwelling 0 not-tested/verified dwelling RNC11012 in a HERS sample group HERS Rater Information HERS Rater Company Name: Energy Inspectors Corporation Responsible Rater's Name Responsible Rater's Signature Eric Dodd Eric Dodd Responsible Rater's Certification Number w/this HERS Provider: Date Signed: RCN10065 9/3/20144:31 PM Registration Number: 414-N0019404423000194-M23A Registration Date/Time: 9t3i20144:31 PM HERSProvider: CHEERS 2008 Residential Compliance Forms August 2069 CERTIFICATE OF FIELD VERIFICATION AND DIAGNOTIC TESTING CF-4R-MECH-25 Refrigerant Charge Verification- Standard Measurement Procedure (Page 1 of 5 Site Address: Enforcement Agency: Permit Number: 29165 Nectarine St City of Murrieta PMT14-00555 Note:If installation of a Charge Indicator Display(CID) is utilized as an alternative to refrigerant charge verification for compliance, a MECH-24 Certificate (instead of this MECFI--25 Certificate)should be used to demonstrate compliance with the refrigerant charge verification requirement. TWAH and STMS are not required far compliance, when a CID is utilized for compliance. As many as 4 systems in the dwelling can be documentedfor compliance using thisform. Attach an additionalform(s)for any additional systems in the dwelling as applicable. Temperature Measurement Access Holes(TMAH)and Saturation Temperature Measurement Sensors(STMS) Procedures far installing TMAH are specified in Reference Residential Appendix RA3.2. If refrigerant charge verification is required for compliance, TMAH are also required for compliance. STMS are only requiredfor completely new or replacement space-conditioning systems that utilize prescriptive compliance method TMAH-Access Holes in Supply and Return Plenums of Air Handler System Name or Identification/Tag System Location or Area Served 1 []Yes ❑No 5/16 inch(8 mm)access hole upstream of evaporative coil in the return plenum and labeled according.to Figure in Section RA3.2.2.2.2. 2 Dyes ONO 5/16 inch(8 mm)access hole downstream of evaporative coil in the supply plenum and labeled according to Figure in Section RA3.2.2.2.2. Yes to I and 2 is a pass. Enter Pass or Fail ✓ ❑Pass ✓ ❑Fail STMS-Sensor on the Eva orator Coil System Name or Identification/Tag The sensor is factory installed,or field installed according to mjby urer's 3 Dyes ❑No specifications,or is installed by methods/specifications approvee Executive Director. The sensor wire is terminated with a standard mini plug suitable for connection to a 4 ❑Yes ❑No digital thermometer. The sensor mini plug is accessible to the installing technician and the I-MRS rater without changing the airflow through the condenser coil 5 ❑Yes ❑No The sensor measures the saturation temperature of the coil within 1.3 degrees F Yes to 3,4,and 5 is a pass. Enter ❑N/A ✓ ❑Pass ✓ ❑Fail N/A if STMS are not applicable. Otherwise enter Pass or Fail STMS-Sensor on the Condenser Coil System Name or Identification/Tag The sensor is factory installed,or field installed according to manufacturer's 6 Dyes ❑No specifications,or is installed by methods/specifications approved by the Executive Director. The sensor wire is terminated with a standard mini plug suitable for connection to a 7 Dyes ❑No digital thermometer. The sensor mini plug is accessible to the installing technician and the HERS rater without changing the airflow through the condenser coil 8 Dyes ❑No The sensor measures the saturation temperature of the coil within 1.3 degrees F Yes to 6,7,and 8 is a pass. Enter ❑N/A ✓ ❑Pass ✓ ❑Fail N/A if STMS are not applicable. Otherwise enter Pass or Fail Registraton Number: 414-N0019404A-M2500027A-M25A Registration Dade/Time: 913/20144:32PM HERSProvider: CHEERS 2008 Residential Compliance Forms July 2010 CERTIFICATE OF FIELD VERIFICATION AND DIAGNOSTIC TESTING CF-4R-MECH-25 Refrigerant Charge Verification- Standard Measurement Procedure (Page 2 of 5 Site Address: Enforcement Agency: Permit Number: 29165 Nectarine St City of Murrieta PMT14-00555 Standard Charge Measurement Procedure(for use if outdoor air dry-bulb is above 55°F) Procedures for determining Refrigerant Charge using the Standard Charge Measurement Procedure are available in Reference Residential Appendix RA3,2, As many as 4 systems in the dwelling can be documented for compliance using this form. Attach an additional forms)for any additional systems in the dwelling as applicable. • The system should be installed and charged in accordance with the manufacturer's specifications before starting thisprocedure. • The system must meet minimum airflow requirements as prerequisite for a valid refrigerant charge test. • If outdoor air dry-bulb is 55°For below, the installer must use the Alternate Charge Measurement Procedure. Space Conditioning Systems System Name or Identification/Tag System Location or Area Served Outdoor Unit Serial# Outdoor Unit Male Outdoor Unit Model Nominal Cooling Capacity Btu/fir Date of Verification Calibration of Diagnostic Instruments Date of Refrigerant Gauge Calibration (must be re-calibrated monthly) Date of Thermocouple Calibration (must be re-calibrated monthly) Measured Temperatures °F System Name or Identification/Tag Supply(evaporator leaving)air dry-bulb temperature(Tsu Iv=db) Return(evaporator entering)air dry-bulb temperature(Treturm db) Return(evaporator entering)air wet-bulb temperature(Treturn,wb) Evaporator saturation temperature (Teva orator,sat) Condenser saturation temperature (Tcondenson sat) Suction line temperature(Tsuction) Liquid Line Temperature(Tliquid) Condenser(entering)air dry-bulb temperature(Toondensex db) Registration Number': 414-N0019404A.M2500027A-M25A Registration DatelDine: 9020144:32 PM HERSProvider: CHEERS 2008 Residential Compliance Forms July 2010 i CERTIFICATE OF FIELD VERIFICATION AND DIAGNOSTIC TESTING CF-4R-MECH-25 Refrigerant Charge Verification-Standard Measurement Procedure (Page 3 of 5 Site Address: Enforcement Agency: Permit Number: 29165 Nectarine St City of Murrieta PMT14-00555 Minimum Airflow Requirement Temperature Split Method Calculations for determining Minimum Airflow Requirement for Refrigerant Charge Verification. The temperature split method is specified in Reference Residential Appendix RA3.2. i System Name or Identification/Tag Calculate: Actual Temperature Split= Tretunv db-Tsupply,db Target Temperature Split from Table RA3.2-3 using Tern,wb and Tretum db Calculate difference: Actual Temperature Split—Target Temperature Split= Passes if difference is between-4°F and +4°F or,upon remeasurement,if between +4°F and-100°F Enter Pass or Fail Note: Temperature Split Method Calculation is not necessary if actual Cooling Coil Airflow is verified using one of the airflow measurement procedures specified in Reference Residential Appendix RA3.3. If actual cooling coil airflow is measured, the value must be equal to or greater than the Calculated Minimum Airflow Requirement In the table below. Calculated Minimum Airflow Requirement(CFM) = Nominal Cooling Capacity(ton) X 300(cfm/ton) System Name or Identification/Tag Calculated Minimum Airflow Requirement(CFM) Measured Airflow using RA3.3 procedures(CFM) Passes if measured airflow is greater than or equal to the calculated minimum airflow requirement. Enter Pass or Fail Superheat Charge Method Calculations for Refrigerant Charge Verification. This procedure is required to be used for fixed orifice metering device systems System Name or Identification/Tag Calculate: Actual Superheat= Tsuction—Teva orator sat Target Superheat from Table RA3.2-2 using Treturn,wb and Tcondenser,db Calculate difference: Actual Superheat—T t Su erheat= System passes if difference is between -6°F and WIT Enter Pass or Fa31 Registration Number: 414-N0019404A-M2500027A-M25A Registration DatelTime: 913120144',32 PM TIERS provider.' CHEERS 2008 Residential Compliance Forms July 2010 i CERTIFICATE OF FIELD VERIFICATION AND DIAGNOSTIC TESTING CF-4R-MECH-25 Refrigerant Charge Verification- Standard Measurement Procedure (Page 4 of 5 Site Address: Enforcement Agency: Permit Number: 29165 Nectarine St City of Murrieta PMT14-00555 I Subcooling Charge Method Calculations for Refrigerant Charge Verification. This procedure is required to be used for thermostatic expansion valve(TXV)and electronic expansion valve(EXV)systems. System Name or Identification/Tag Calculate: Actual Subcooling= sat—Tli uid Target Subcooling specified by manufacturer Calculate difference: Actual Subcooling—Target Subcooling= System passes if difference is between -40F and+4°F Enter Pass or Fail Metering Device Calculations for Refrigerant Charge Verification. This procedure is required to be used for thermostatic expansion valve(TXV)and electronic expansion valve(EXV)systems. System Name or Identification/Tag Calculate: Actual Superheat = Tsuction —Teva orator sat Enter allowable superheat range from manufacturer's specifications(or use range between 3°E and 26°F if manufacturer's specification is not available) System passes if actual superheat is within the allowable superheat range Enter Pass or Fail Registration Number: 414Jdoo10404A-M2500027A-M25A Registration Dwe/Time m/2014 4:32 PM XERSProvider: CHEERS 2008 Residential Compliance Forms July 2010 i CERTIFICATE OF FIELD VERIFICATION AND DIAGNOSTIC TESTING CF-4R-MECH-25 Refrigerant Charge Verification- Standard Measurement Procedure (Page 5 of 5 Site Address: Enforcement Agency: Permit Number: 29165 Nectarine St City of Murrieta PMT14-00555 Standard Charge Measurement Summary: System shall pass both refrigerant charge criteria,teetering device criteria(if applicable),and minimum cooling coil airflow criteria based on measurements taken concurrently during system operation. If corrective actions were taken, all applicable verification criteria must be re-measured and/or recalculated. System Name or Identification/Tag System meets all refrigerant charge and airflow requirements. Enter Pass or Fail ❑Residential Appendix RA3.2.2 requires that if the outdoor temperature is between 55OF and 65OF the return air dry bulb temperature shall be maintained above 70°F during the Standard Charge Measurement Procedure. The signature of the Responsible Rater in the declaration statement below certifies this requirement has been met for all applicable system verifications reported on this certificate. DECLARATION STATEMENT • I certify under penalty of perjury,under the laws of the State of California,the information provided on this form is true mid correct. • I am the certified HERS rater who performed the verification services identified and reported on this certificate(responsible rater), • The installed feature,material,component,or manufactured device requiring HERS verification that is identified on this certificate (the installation)complies with the applicable requirements in Reference Residential Appendices RA2 and RA3 and the requirements specified on the Certificate(s)of Compliance(CF-IR)approved by the local enforcement agency. • The information reported on applicable sections of the Installation Certificate(s)(CF-6R),signed and submitted by the person(s) responsible for the installation conforms to the requirements specified on the Certificate(s)of Compliance(CF-IR)approved by the enforcement agency. Builder or Installer information as shown on the Installation Certificate(CF-611 Company Name: (Installing Subcontractor or General Contractor or Builder/Owner) True Air Mechanical, Inc. Responsible Person's Name: CSLB License: Sergio Samuyo C20 HVAC(956171) HERS Provider Data Registry Information Sample Group#(if applicable): 0 tested/verified dwelling ❑✓ not-tested/verified dwelling RNC11012 _ in a,HERS sample group HERS Rater Information HERS Rater Company Name: Energy Inspectors Corporation Responsible Rater's Name Responsible Rater's Signature Eric Dodd Eric Dodd Responsible Rater's Certification Number w/this HERS Provider: Date Signed: RCNIO065 9/3/2014 4:32 PM Registration Number: 414-N0019404A-M2500027A-M25A Registration DatelTime: 913/20144:32PM HERSProvider: CHEERS 2008 Residential Compliance Forms July 2010 City of Menifee BUILDING & SAFETY DEPARTMENT ENIF I 29714 Haun Road Menifee, CA 92586 Phone: (951)672-6777—Fax(951)679.3843 www.cityof nenifee us Request for Certificate of Occupancy Residential — Custom Homes/Tracts/Condo's/Apts. After all final inspections have been completed by all involved agencies/departments you must obtain authorized signatures from all the involved agencies/departments on this form. When the form is completed, return it with the entire final package to the Building and Safety Department for release of utility meters and issuance of Certificate of Occupancy. All signatures on the forms in this package must be original signatures (copies or faxes will not be accepted). Project Name:_. fflen A AiN Permit#:_ Tract: -3159 Lot #: Bldg. #: Unit#: ` Address Jq 1 S &-eur—armej Custom Home: Yes ( ) No ( ) Model Home: Yes ( ) No ( ) Condo/Apartment: Yes ( ) No ( ) Tract Repetitive: Yes ( ) No ( ) Date Ap v gna re 1. Engineering (951) 672-6777 9 //¢ 9^1 i 2. E.M.W.D (951) 928-3777 5/10114 3. Fire Prevention (951) 955-4777 $I PIA 4. Planning (951) 672-6777 / 5. Health Department (Septic Only) 6. Finance (951-672-6777 7. Building & Safety (951) 672-6777 "L 7 N (Final release of utilities) 0 EASTERN MUNICIPAL WATER DISTRICT SINCE 1950" Board of Directors August 29, 2014 President Philip E.Paule Tract: 31582-1 C.O.: 67195/67197 Vice President Lot(s): 11,13, 14, 147 Randy A.Record xx Water Reclaimed xx Sewer Joseph J.Koehler,CPA Model Homes DavRonald W. Sullivan Landscaping only Ronald W.Sullivan General Manager xx Occupancy Paul D.Jones II,P.E. Treasurer City of Menifee Joseph 1,Kuchler,CPA Building & Safety Department Director of The 29714 Haun Road Metropolitan water Menifea, CA 92586 District of So. Calif. Randy A.Record Board Secretary and To Whom It May Concern: Assistant to the General Manager You are advised that interruptible domestic service is granted to the partial tract Rosemarie v.Howard as indicated by the lots enumerated above. The water and/or sewer systems will Legal Counsel be acceptable by Eastern Municipal Water District for operation and maintenance Lemieux&O'Neill upon completion of all tract street improvements, at which time you will be notified. Sincere , Clar L on for Ouckniel Director of Field Engineering CD/cl Cc: Records Management File Engineering Tract File Developer Mailing Address: Post Office Box 8300 Perris,CA 92572-8300 Telephone:(951)928-3777 Pax:(951)928-6177 Location: 2270 Trumble Road Perlis,CA 92570 Internet :www eemwLgJg rEASTE N MUNICIPAL D I S T R I C TNCE 1950 Board of Directors September 10, 2014 President Philip E.Pain® Tract: 31582-1 C.O.: 67195/67197 rice President Lot(s): -12, 144-146 Randy A.Record Water xx Reclaimed Sewer xx Joseph J.Koehler,CPA Model Homes David J.Slawson Ronald W.Sullivan Landscaping only xx Occupancy General Manager Paul D.Jones 11,P.H. Treasurer City of Menifee Joseph J,Kuebler,CPA Building & Safety Department Chairman of The 29714 Haun Road Metropolitan)Pater Menifee, CA 92586 Disalet ofSa.Calif. Randy A.Record Board Secretary and To Whom It May Concern: Assistant to the General Manager You are advised that interruptible domestic service is granted to the partial tract Rosemarie V.Howard as indicated by the lots enumerated above. The water and/or sewer systems will Legal Counsel be acceptable by Eastern Municipal Water District for operation and maintenance Lemieux&O'Neill upon completion of all tract street improvements, at which time you will be notified. Sincerer Clara Lofton for Chuck Daniel Director of Field Engineering CD/cl Cc: Records Management File Engineering Tract File Developer Mailing Address: Post Office Box 8300 Penis,CA 92572-8300 Telephone: (951)928-3777 Fax: (951)928-6177 Location: 2270 Tremble Road Perris,CA 92570 Internet:www.emwd.ora i I Riverside County Fire Department Fire Protection Planning Section i Riverside Off.:2300 Market 5l.,Ste.150,Rlverslde,CA 92501 Ph.(951)955-4777 Fm(951)955-4886 Palm Oesert Ofice: 77-933 Las Montanas Rd.,*201 Palm Desert,CA 92211 4131 Ph.(760)863-8886 Fax(760)863 7072 Fire Department Clearance/Release Date: 09/16/14 To: ccarlson(a4citvofinenifee,us; brivera(a cityofinenifee.us; mbinnall(c)citvofinenifee us Permit/Lot#: 14-MENI-00554: 29153 NECTARINE ST, LOT 11 14-MENI-00556: 29189 NECTARINE ST, LOT 13 14-MENI-00558; 29198 NECTARINE ST, LOT 144. 14-MENI-00559: 29186 NECTARINE ST, LOT 145 , 14-MENI-00560: 29174 NECTARINE ST, LOT 146 . Job Site Address: MERIDIAN (EL DORADO-1)TR 31582-1 ❑ Final For Recordation ❑ Release For Building Permit(s) ❑ Shell Final Only(No Tenant) Final For Occupancy ❑ Release For Residential Sprinkler Installation ❑ Building Plan Check Fees Paid,Water Requirement Met-if water applicable ❑ Building Plan Check Fees Not Paid ❑ Residential Sprinkler Plan Check Fees Paid ❑ Residential Sprinkler Plan Check Fees Not Paid _ Other Fees ❑ Fees Not Required If you should have any questions, please contact the appropriate Riverside County Fire Protection Planning office for further assistance. PHILLIP JONES. FSI Print Name of Plan Reviewer/Inspector Approved Release JAMES WAREN Sent By:Print Name Form C—Revised 3/01/2012 Riverside County Fire Department Fire Protection Planning Section Riverside Office:2300 Market St.,Ste.150,Riverside,CA 92501 Ph.(951)9554777 Fax(951)9554886 Palm Desert Office: 77 933 Las Montanas Rd.,R 201 Palm Desert,CA 92211 4131 Ph.(760)863 8886 Fax(760)863 7072 Fire Department Clearance/Release Date: 08/22/14 To: ccarlson @citvofinenifee.us: brivera(a)cityofmanifee,us; mbinnallpcityofinenifee us Permit/Lot#: 14-MENI-00555: 29165 NECTARINE ST LOT 12• 14-MENI-00557; 29201 NECTARINE ST LOT 14 14-MENI-00561; 29162 NECTARINE ST, LOT 147 Job Site Address: MERIDIAN (EL DORADO-1)TR 31582-1 Final For Recordation ❑ Release For Building Permit(s) El Shell Final Only(No Tenant) ® Final For Occupancy ❑ Release For Residential Sprinkler Installation ❑ Building Plan Check Fees Paid, Water Requirement Met-if water applicable Building Plan Check Fees Not Paid ❑ Residential Sprinkler Plan Check Fees Paid El Residential Sprinkler Plan Check Fees Not Paid ❑ Other Fees ❑ Fees Not Required If you should have any questions, please contact the appropriate Riverside County Fire Protection Planning office for further assistance. PHILLIP JONES, FSI Print Name of Plan Reviewer/Inspector Approved Release JAMES WARE Sent By: Print Name Form C—Revised 3/01/2012